Effects of product design on assembly lines performances: A concurrent engineering approach
暂无分享,去创建一个
[1] Anders Drejer. Are you innovative enough , 2008 .
[2] P. M. Pelagagge,et al. A Methodology for Selecting Assembly Systems Feeding Policy , 2011, Ind. Manag. Data Syst..
[3] J. Driscoll,et al. The definition of assembly line balancing difficulty and evaluation of balance solution quality , 2001 .
[4] Cheng-Wen Lee. The innovation and success of consumer electronics using new product development process , 2007 .
[5] P. Soundar,et al. Concurrent design of products for manufacturing system performance , 1994, Proceedings of 1994 IEEE International Engineering Management Conference - IEMC '94.
[6] Donatella Corti,et al. A concurrent engineering approach to selective implementation of alternative processes , 2004 .
[7] Ernie Appleton,et al. Product Design for Manufacture and Assembly , 2008 .
[8] Armin Scholl,et al. Balancing and Sequencing of Assembly Lines , 1995 .
[9] Andrew Kusiak,et al. Design for agile assembly: An operational perspective , 1997 .
[10] Kwai-Sang Chin,et al. Strengthening Risk Evaluation in Existing Risk Diagnosis Method , 2010 .
[11] Karthik Ramani,et al. Integrated Sustainable Life Cycle Design: A Review , 2010 .
[12] Nilmini Wickramasinghe,et al. Identifying the need for world class manufacturing and best practice for SMEs in the UK , 2007 .
[13] Antonio Casimiro Caputo,et al. Integrating Production Systems Performances in the DFMA Methodology , 2006 .
[14] Roger V. Johnson,et al. Optimally balancing large assembly lines with `FABLE' , 1988 .
[15] Seppo Hänninen,et al. Product innovation as micro-strategy , 2007 .
[16] M. Kilbridge,et al. The Balance Delay Problem , 1961 .
[17] William V. Gehrlein,et al. A comparative evaluation of heuristic line balancing techniques , 1986 .
[18] Ezey M. Dar-El,et al. MALB—A Heuristic Technique for Balancing Large Single-Model Assembly Lines , 1973 .
[19] Robert P. Smith,et al. The historical roots of concurrent engineering fundamentals , 1997 .
[20] Preston G. Smith,et al. Developing products in half the time , 1995 .
[21] A. A. Mastor,et al. An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques , 1970 .
[22] A. Seetharaman,et al. The impact of Just-in-Time on costing , 2007 .
[23] Paul G. Maropoulos,et al. Manufacturability analysis of early product designs , 2003, Int. J. Comput. Integr. Manuf..
[24] Matti Mottonen,et al. Managing requirements in ICT companies , 2009, Bus. Process. Manag. J..
[25] Mahendra S. Hundal. Systematic mechanical designing : a cost and management pespective , 1997 .
[26] Dragos Axinte,et al. Manufacturability analysis system: issues and future trends , 2009 .
[27] C. M. Hinckley,et al. A global conformance quality model. A new strategic tool for minimizing defects caused by variation, error, and complexity , 1994 .
[28] Dana S. Nau,et al. Automated manufacturability analysis: A survey , 1995 .
[29] Edward B. Magrab,et al. Incorporating production concerns in conceptual product design , 2000 .