Research on Sitting Transformer Substations in Rural Areas Based on Improved Genetic Algorithm

The process of urbanization, Beijing faces a number of environmental problems. Especially in the last few years, there has been constantly sustained fog and haze, which makes the implementation of electric heating in rural areas gradually on the agenda. After the implementation of electric heating, the irrationality of the regional power grid layout will be further amplified. With the rapid growth of electricity load in the planning area, the requirement of the power supply grid reliability and power quality is also increasing. Therefore, on the basis of power load forecasting in consideration of the the electric heating, and based on the particularity of rural power network, we achieve the Huairou District substation site with the use of improved genetic algorithm. The results can provide reference for the selection of substation of the whole Beijing rural area.