Optimal manufacturing batch size with rework process at a single-stage production system
暂无分享,去创建一个
[1] Ping Yang,et al. Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs , 1996 .
[2] Tarun Gupta,et al. Looping in a multistage production system , 1984 .
[3] W. Shih. Optimal inventory policies when stockouts result from defective products , 1980 .
[4] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[5] R. Teunter,et al. On the non-optimality of the average cost approach for inventory models with remanufacturing , 2002 .
[6] Knut Richter,et al. Remanufacturing planning for the reverse Wagner/Whitin models , 2000, Eur. J. Oper. Res..
[7] P. A. Hayek,et al. Production lot sizing with the reworking of imperfect quality items produced , 2001 .
[8] Rainer Kleber,et al. Optimal control of production and remanufacturing in a simple recovery model with linear cost functions , 2001, OR Spectr..
[9] Hau L. Lee,et al. Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework , 1992 .
[10] K. Richter,et al. The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost , 2001 .
[11] Angappa Gunasekaran,et al. Effect of Dynamic Process Quality Control on the Economics of Production , 1990 .
[12] M. Chandra,et al. OPTIMAL BATCH SIZE AND INVESTMENT IN MULTISTAGE PRODUCTION SYSTEMS WITH SCRAP , 1997 .