An improved heuristic for two-machine flowshop scheduling with an availability constraint

In this paper we study the two-machine flowshop scheduling problem with an availability constraint on the first machine. We first show that the worst-case error bound 12 of the heuristic provided by Lee [4] is tight. We then develop an improved heuristic with a worst-case error bound of 13.