Multiscale identification of emergent and future conditions along corridors of transportation networks
暂无分享,去创建一个
[1] Luca Bertolini,et al. Why Cost Benefit Analysis is perceived as a problematic tool for assessment of transport plans: A process perspective , 2012 .
[2] James H. Lambert,et al. Integration of Decision Analysis and Scenario Planning for Coastal Engineering and Climate Change , 2011, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.
[3] James H. Lambert,et al. Integrated risk management of safety and development on transportation corridors , 2015, Reliab. Eng. Syst. Saf..
[4] James H. Lambert,et al. Climate and other scenarios disrupt priorities in several management perspectives , 2014, Environment Systems and Decisions.
[5] W. Botzen,et al. Combining hazard, exposure and social vulnerability to provide lessons for flood risk management , 2015 .
[6] Ramesh Sharda,et al. Business Intelligence and Analytics , 2015 .
[7] Igor Linkov,et al. Resilience Analytics with Application to Power Grid of a Developing Region , 2017, Risk analysis : an official publication of the Society for Risk Analysis.
[8] John Preston,et al. Twenty-one sources of error and bias in transport project appraisal , 1998 .
[9] James H. Lambert,et al. Climate and Related Uncertainties Influencing Research and Development Priorities , 2015 .
[10] Grant G Schultz,et al. Crashes in the Vicinity of Major Crossroads , 2008 .
[11] Rafael Molina,et al. Overtopping hazards to port activities: Application of a new methodology to risk management (POrt Risk MAnagement Tool) , 2014, Reliab. Eng. Syst. Saf..
[12] Susana Freiria,et al. The Multiscale Importance of Road Segments in a Network Disruption Scenario: A Risk‐Based Approach , 2015, Risk analysis : an official publication of the Society for Risk Analysis.
[13] Sybil Derrible,et al. A geographical and multi-criteria vulnerability assessment of transportation networks against extreme earthquakes , 2016, Reliab. Eng. Syst. Saf..
[14] James H. Lambert,et al. Quantification of Scenarios and Stakeholders Influencing Priorities for Risk Mitigation in Infrastructure Systems , 2014 .
[15] Jerome Gluck,et al. State of the Practice in Highway Access Management , 2010 .
[16] Kristine M Williams,et al. Access Management Manual , 2014 .
[17] James H. Lambert,et al. Visualization of large data sets for project planning and prioritization on transportation corridors , 2015, 2015 Systems and Information Engineering Design Symposium.
[18] Marc Wouters,et al. Designing a performance measurement system: A case study , 2004, Eur. J. Oper. Res..
[19] Amit Mitra,et al. Statistical Quality Control , 2002, Technometrics.
[20] James H. Lambert,et al. Prioritizing Infrastructure Investments in Afghanistan with Multiagency Stakeholders and Deep Uncertainty of Emergent Conditions , 2012 .
[21] James H. Lambert,et al. Highway Access Safety Program Evaluation with Uncertain Parameters , 2014 .
[22] James H. Lambert,et al. Distributed travel time savings of a multiscale transportation access management program , 2013, Environment Systems and Decisions.
[23] James H. Lambert,et al. Understanding and managing disaster evacuation on a transportation network. , 2013, Accident; analysis and prevention.
[24] H S Levinson,et al. IMPACTS OF ACCESS MANAGEMENT TECHNIQUES , 1999 .
[25] James H. Lambert,et al. Runway safety program evaluation with uncertainties of benefits and costs , 2013 .
[26] James H. Lambert,et al. Cost-benefit functions for the allocation of security sensors for air contaminants , 2007, Reliab. Eng. Syst. Saf..
[27] Alexandre Oliveira Tavares,et al. Multidimensional Approach for Tsunami Vulnerability Assessment: Framing the Territorial Impacts in Two Municipalities in Portugal , 2017, Risk analysis : an official publication of the Society for Risk Analysis.
[28] Panos M. Pardalos,et al. Handbook of Multicriteria Analysis , 2010 .
[29] James H. Lambert,et al. Risk Analysis of Biofuels Industry for Aviation with Scenario‐Based Expert Elicitation , 2015, Syst. Eng..
[30] P. Peduzzi,et al. Assessing global exposure and vulnerability towards natural hazards: the Disaster Risk Index , 2009 .
[31] Wolfgang Kron,et al. Flood Risk = Hazard • Values • Vulnerability , 2005 .
[32] Junrui Xu,et al. Risk‐Cost‐Benefit Analysis for Transportation Corridors with Interval Uncertainties of Heterogeneous Data , 2015, Risk analysis : an official publication of the Society for Risk Analysis.
[33] Sai S. Nudurupati,et al. State of the art literature review on performance measurement , 2011, Comput. Ind. Eng..
[34] Jennifer Whyte,et al. Managing change in the delivery of complex projects: Configuration management, asset information and 'big data' , 2016 .