Order planning with an outsourcing strategy for a make-to-order/make-to-stock production system using particle swarm optimization with a self-adaptive genetic operator

[1]  Meimei Zheng,et al.  Supply chain analysis for standard and customized products with postponement , 2021, Comput. Ind. Eng..

[2]  Robson Flavio Castro,et al.  Dispatching method based on particle swarm optimization for make-to-availability , 2020, Journal of Intelligent Manufacturing.

[3]  Adam P. Piotrowski,et al.  Population size in Particle Swarm Optimization , 2020, Swarm Evol. Comput..

[4]  Mingsong Mao,et al.  Integrated production planning and scheduling under uncertainty: A fuzzy bi-level decision-making approach , 2020, Knowl. Based Syst..

[5]  K. Govindan,et al.  Coordination by quantity flexibility contract in a two-echelon supply chain system: Effect of outsourcing decisions , 2020, International Journal of Production Economics.

[6]  Kay Peeters,et al.  Hybrid make-to-stock and make-to-order systems: a taxonomic review , 2020, Int. J. Prod. Res..

[7]  Piotr Dziwiński,et al.  A New Hybrid Particle Swarm Optimization and Genetic Algorithm Method Controlled by Fuzzy Logic , 2020, IEEE Transactions on Fuzzy Systems.

[8]  Shijin Wang,et al.  Approximation algorithms for the min-max regret identical parallel machine scheduling problem with outsourcing and uncertain processing time , 2020, Int. J. Prod. Res..

[9]  M. Geetha,et al.  An improved particle swarm optimization algorithm to solve hybrid flowshop scheduling problems with the effect of human factors - A case study , 2020, Comput. Oper. Res..

[10]  Le Liu,et al.  Outsourcing and rescheduling for a two-machine flow shop with the disruption of new arriving jobs: A hybrid variable neighborhood search algorithm , 2019, Comput. Ind. Eng..

[11]  Mohammed Dahane,et al.  Outsourcing optimization in two-echelon supply chain network under integrated production-maintenance constraints , 2019, J. Intell. Manuf..

[12]  Kai Zhang,et al.  Enhancing comprehensive learning particle swarm optimization with local optima topology , 2019, Inf. Sci..

[13]  Zhongzhi Shi,et al.  MPSO: Modified particle swarm optimization and its applications , 2018, Swarm Evol. Comput..

[14]  Yves Dallery,et al.  Priority optimization and make-to-stock/make-to-order decision in multiproduct manufacturing systems , 2018, Int. Trans. Oper. Res..

[15]  Hadi Mokhtari,et al.  An efficient chaotic based PSO for earliness/tardiness optimization in a batch processing flow shop scheduling problem , 2018, J. Intell. Manuf..

[16]  Jinwen Ou,et al.  In-house production and outsourcing under different discount schemes on the total outsourcing cost , 2018, Ann. Oper. Res..

[17]  Rui Hu,et al.  Discussion on energy conservation strategies for steel industry: Based on a Chinese firm , 2017 .

[18]  Paolo Renna,et al.  Production control policies for a multistage serial system under MTO-MTS production environment , 2016 .

[19]  Ruud H. Teunter,et al.  Hybrid MTO-MTS production planning: An explorative study , 2016, Eur. J. Oper. Res..

[20]  Yi-Chih Hsieh,et al.  A hybrid algorithm for the multi-stage flow shop group scheduling with sequence-dependent setup and transportation times , 2015 .

[21]  Yi Fang,et al.  Multi-level inventory matching and order planning under the hybrid Make-To-Order/Make-To-Stock production environment for steel plants via Particle Swarm Optimization , 2015, Comput. Ind. Eng..

[22]  K. L. Mak,et al.  Integrated partner selection and production-distribution planning for manufacturing chains , 2015, Comput. Ind. Eng..

[23]  Bo Guo,et al.  Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization , 2014, Journal of Scheduling.

[24]  Moacir Godinho Filho,et al.  An ant colony optimization approach for the parallel machine scheduling problem with outsourcing allowed , 2013, Journal of Intelligent Manufacturing.

[25]  Elizabeth M. Jewkes,et al.  Performance analysis and optimization of hybrid manufacturing systems under a batch ordering policy , 2013 .

[26]  Hadi Mokhtari,et al.  Scheduling with an outsourcing option on both manufacturer and subcontractors , 2013, Comput. Oper. Res..

[27]  Byung-Cheon Choi,et al.  Outsourcing and scheduling for two-machine ordered flow shop scheduling problems , 2013, Eur. J. Oper. Res..

[28]  Hadi Mokhtari,et al.  Production scheduling with outsourcing scenarios: a mixed integer programming and efficient solution procedure , 2012 .

[29]  Shengxiang Yang,et al.  A Self-Learning Particle Swarm Optimizer for Global Optimization Problems , 2012, IEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics).

[30]  Byung-Cheon Choi,et al.  Two-stage production scheduling with an outsourcing option , 2011, Eur. J. Oper. Res..

[31]  Xiangtong Qi,et al.  Managing partially controllable raw material acquisition and outsourcing in production planning , 2009 .

[32]  Jun Zhang,et al.  Orthogonal Learning Particle Swarm Optimization , 2009, IEEE Transactions on Evolutionary Computation.

[33]  Doug Hains,et al.  Tunneling between optima: partition crossover for the traveling salesman problem , 2009, GECCO.

[34]  Jigui Sun,et al.  An alternate two phases particle swarm optimization algorithm for flow shop scheduling problem , 2009, Expert Syst. Appl..

[35]  Zhi-Long Chen,et al.  Scheduling with subcontracting options , 2008 .

[36]  M. K. Tiwari,et al.  Modeling the planning and scheduling across the outsourcing supply chain: a Chaos-based fast Tabu–SA approach , 2008 .

[37]  Annastiina Kerkkänen,et al.  Determining semi-finished products to be stocked when changing the MTS-MTO policy: Case of a steel mill , 2007 .

[38]  D. Gupta,et al.  Strategic inventory deployment in the steel industry , 2004 .

[39]  Ioan Cristian Trelea,et al.  The particle swarm optimization algorithm: convergence analysis and parameter selection , 2003, Inf. Process. Lett..

[40]  Katsumi Morikawa,et al.  Make-to-stock policies for a multistage serial system under a make-to-order production environment , 2014 .

[41]  Wang Ding-wei,et al.  Make to order/make to stock management mode on the order planning problem of steel-iron factories , 2013 .

[42]  Xiangtong Qi,et al.  Outsourcing and production scheduling for a two-stage flow shop , 2011 .

[43]  P. Pardalos,et al.  A hybrid particle swarm optimization and tabu search algorithm for order planning problems of steel factories based on the Make-To-Stock and Make-To-Order management architecture , 2011 .

[44]  Tao Zhang,et al.  A Mixed Integer Programming Model and Improved Genetic Algorithm for Order Planning of Iron-Steel Plants , 2008 .

[45]  J. Kennedy,et al.  The Particle Swarm : Explosion , Stability , and Convergence in a Multi-Dimensional Complex Space , 2003 .

[46]  J. R. Shah,et al.  Performance of priority rules in a due date flow shop , 1992 .