Risk Analysis of Critical Infrastructures Using Fuzzy Copras
暂无分享,去创建一个
Morteza Yazdani | Edmundas Kazimieras Zavadskas | Ali Alidoosti | E. Zavadskas | Ali Alidoosti | M. Yazdani
[1] Edmundas Kazimieras Zavadskas,et al. Selection of low-e windows in retrofit of public buildings by applying multiple criteria method COPRAS: A Lithuanian case , 2006 .
[2] Jose M. Yusta,et al. Methodologies and applications for critical infrastructure protection: State-of-the-art , 2011 .
[3] Edmundas Kazimieras Zavadskas,et al. Risk assessment of construction projects , 2010 .
[4] Prasenjit Chatterjee,et al. Materials selection using complex proportional assessment and evaluation of mixed data methods , 2011 .
[5] Sung-Lin Hsueh,et al. On-line multi-criterion risk assessment model for construction joint ventures in China , 2007 .
[6] Erich Rome,et al. An ontological approach to simulate critical infrastructures , 2010, J. Comput. Sci..
[7] Raufdeen Rameezdeen,et al. Risk management in road construction: The case of Sri Lanka , 2009 .
[8] Dilanthi Amaratunga,et al. Post‐tsunami reconstruction in sri lanka: Assessing the economic impact , 2010 .
[9] Bindu Madhuri,et al. Selection of Best Web Site by Applying COPRAS-G method , 2010 .
[10] Valentinas Podvezko,et al. The Comparative Analysis of MCDA Methods SAW and COPRAS , 2011 .
[11] Amir Saman Kheirkhah,et al. Developing Strategies to Reduce the Risk of Hazardous Materials Transportation in Iran Using the Method of Fuzzy SWOT Analysis , 2009 .
[12] Xin Miao,et al. Modeling of bilevel games and incentives for sustainable critical infrastructure system , 2010 .
[13] Edmundas Kazimieras Zavadskas,et al. Evaluating the life cycle of a building: A multivariant and multiple criteria approach , 2008 .
[14] Selim Zaim,et al. Analyzing business competition by using fuzzy TOPSIS method: An example of Turkish domestic airline industry , 2011, Expert Syst. Appl..
[15] Eric Too. Capability for infrastructure asset capacity management , 2011 .
[16] Yi-Hsuan Chen,et al. A fuzzy MCDM approach for evaluating banking performance based on Balanced Scorecard , 2009, Expert Syst. Appl..
[17] Kasthurirangan Gopalakrishnan,et al. Neural networks surrogate models for simulating payment risk in pavement construction , 2008 .
[18] Jurgita Antucheviciene,et al. Measuring Congruence of Ranking Results Applying Particular MCDM Methods , 2011, Informatica.
[19] Edmundas Kazimieras Zavadskas,et al. Multicriteria selection of project managers by applying grey criteria , 2008 .
[20] A R Karbasi,et al. Energy Saving in Tehran International Flower Exhibition's Building , 2008 .
[21] Romualdas Ginevičius,et al. The model of forming competitive strategy of an enterprise under the conditions of oligopolic market , 2010 .
[22] Valentinas Podvezko,et al. Complex evaluation of contracts for construction , 2010 .
[23] Karel Skokan. Technological and Economic Development of Economy , 2011 .
[24] Jurgita Antucheviciene,et al. Multiple criteria evaluation of rural building's regeneration alternatives , 2007 .
[25] L. A. Cox,et al. Risk analysis of complex and uncertain systems , 2009 .
[26] David Dawson,et al. Wiley Handbook of Science and Technology for Homeland Security , 2011 .
[27] R. Little. Tending the infrastructure commons: Ensuring the sustainability of our vital public systems , 2005 .
[28] Sarah C. Darby,et al. Energy feedback in buildings: improving the infrastructure for demand reduction , 2008 .
[29] Siba Sankar Mahapatra,et al. Multicriteria decision-making models for the evaluation and appraisal of teachers' performance , 2010 .
[30] Myron Olstein,et al. RAMCAP™: Risk Analysis and Management for Critical Asset Protection for the Water and Wastewate Sector , 2007 .
[31] Sławomir Biruk,et al. THE METHOD FOR IMPROVING STABILITY OF CONSTRUCTION PROJECT SCHEDULES THROUGH BUFFER ALLOCATION / STATYBOS VYKDYMO GRAFIKO STABILUMO UŽTIKRINIMAS PASKIRSTANT LAIKO REZERVUS , 2011 .