A Model for Determining the Breaking Characteristics of Immediate Roof in Longwall Mines

Nowadays, the longwall mining is one of the most prevalent methods being used in coal mines. For the safety and success of such mines, one of the most important parameters is determination of the periodic roof weighting interval. As a matter of fact periodic roof weighting interval (PRWI) is not selected. Design and selection of support in this mining method should be correctly selected considering PRWI. Consequently, the current paper tries to develop a new model for determining the periodic roof weighting interval of coal mines. For this, the roof weighting interval is modeled by applying an analytical method and presented a model for determining the roof weighting interval. The results are compared with some case studies at coal mines. It is found that that the proposed model can confidently be used for determining the roof weighting interval in coal mines.

[1]  G. M. Hill Underground Coal Mining , 1980 .

[2]  Bahtiyar Ünver,et al.  3D numerical modeling of longwall mining with top-coal caving , 2005 .

[3]  K. Shahriar,et al.  Numerical modelling of out-of-seam dilution in longwall retreat mining , 2010 .

[4]  Evert Hoek,et al.  Practical estimates of rock mass strength , 1997 .

[5]  R. Goodman Introduction to Rock Mechanics , 1980 .

[6]  S. K. Das,et al.  Observations and classification of roof strata behaviour over longwall coal mining panels in India , 2000 .

[7]  Heping Xie,et al.  Three-dimensional numerical analysis of deformation and failure during top coal caving , 1999 .

[8]  Z. T. Bieniawski,et al.  The Geomechanics Classification In Rock Engineering Applications , 1979 .

[9]  P. R. Sheorey Empirical Rock Failure Criteria , 1997 .

[10]  D. N. Whittles,et al.  The development of a coal measure classification (CMC) and its use for prediction of geomechanical parameters , 2007 .

[11]  Hyeong-Dong Park,et al.  Coal mining above a confined aquifer , 2003 .

[12]  Y. P. Chugh,et al.  State-of-the-art of ground control in longwall mining and mining subsidence , 1982 .

[13]  Syd S. Peng,et al.  Coal Mine Ground Control , 1978 .

[14]  Evert Hoek,et al.  HOEK-BROWN FAILURE CRITERION - 2002 EDITION , 2002 .

[15]  Christopher Mark,et al.  New Developments With The Coal Mine Roof Rating , 1900 .

[16]  C. Mark,et al.  Coal Mine Roof Rating (CMRR): A practical rock mass classification for coal mines. Information circular/1994 , 1994 .

[17]  U. K. Singh,et al.  A numerical modeling approach for assessment of progressive caving of strata and performance of hydraulic powered support in longwall workings , 2009 .

[18]  Christopher Mark Application Of The Coal Mine Roof Rating (CMRR) To Extended Cuts , 1900 .

[19]  P. R. Sheorey,et al.  An empirical failure criterion for rocks and jointed rock masses , 1989 .

[20]  Z. T. Bieniawski,et al.  Rock mechanics design in mining and tunneling , 1984 .

[21]  U. K. Singh,et al.  Prediction of caving behavior of strata and optimum rating of hydraulic powered support for longwall workings , 2010 .