Simulation studies of multilevel dynamic job shop scheduling using heuristic dispatching rules
暂无分享,去创建一个
[1] Henry C. Co,et al. Sequencing in flexible manufacturing systems and other short queue-length systems , 1988 .
[2] Kenneth R. Baker,et al. Sequencing Rules and Due-Date Assignments in a Job Shop , 1984 .
[3] J. H. Mulligan,et al. Performance forecasts as feedback for schedule generation , 1992 .
[4] Ari P. J. Vepsalainen. Priority rules for job shops with weighted tardiness costs , 1987 .
[5] Elsayed A. Elsayed,et al. Job shop scheduling with alternative machines , 1990 .
[6] Yeou-Fang Wang. Artificial neural networks and their applications to manufacturing scheduling problems , 1991 .
[7] S. S. Panwalkar,et al. A Survey of Scheduling Rules , 1977, Oper. Res..
[8] Jr. J. Cruz,et al. Leader-follower strategies for multilevel systems , 1978 .
[9] Gary D. Scudder,et al. Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..
[10] Khalil S. Hindi,et al. A multilevel multilayer framework for manufacturing control , 1991, J. Intell. Robotic Syst..
[11] Alessandro Agnetis,et al. Part routing in flexible assembly systems , 1990, IEEE Trans. Robotics Autom..
[12] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .