Cause Analysis of Hindering On-Site Lean Construction for Prefabricated Buildings and Corresponding Organizational Capability Evaluation

As prefabricated buildings play a significant role in the global fight against the new coronavirus “COVID-19,” they attract more global attention than other types of buildings. Lean construction helps to improve the benefits of enterprises and the working environment of workers. However, prefabricated buildings are encountering various challenges in implementing on-site lean construction. According to a cause-and-effect relationship, it will be more meaningful to explore the critical causes hindering on-site lean construction, namely, the critical barriers. Hence, this paper establishes a research methodology framework based on multimethod collaboration, including the exploratory factor analysis model regarding critical barriers, the exploratory factor evaluation model regarding organizational capabilities, and the important findings and suggestions. Thirty-one critical barriers of on-site lean construction for prefabricated buildings are identified via literature analysis, field survey, and semistructured interview. After pre-exploratory factor analysis, thirty critical barriers are finally retained and prioritized, and six common components are extracted and nominated. A large-scale project using the Engineering, Procurement, and Construction (EPC) mode is selected as a case study to evaluate its construction organizational capability to deal with the six common components. The important findings indicate that the inadequate professional management capability of managers is the most critical barrier, and the construction organization from the project case is fully capable of dealing with the common components during on-site lean construction. Six corresponding substantive suggestions are also proposed according to domain experts, and the most prioritized one of them is that an internal training or external recruitment is suggested to solve the inadequate professional management capability of managers. The internal training should take the form of seminars and training courses that invite senior prefabricated project management experts to participate. The external recruitment needs to focus on the management experience, lean skills, and leadership of managers in prefabricated projects. The established methodology framework proposes a new idea for the barrier analysis and corresponding organizational capability evaluation of on-site lean construction from the perspective of the specific prefabricated construction industry rather than the entire construction industry. Due to the special construction mode of prefabricated buildings, it further expands the current boundary of lean construction methodology. The findings and suggestions will provide a valuable reference and guidance for the prefabricated construction industry to solve the barriers regarding on-site lean construction.

[1]  L. Koskela,et al.  Lean thinking in the highways construction sector: motivation, implementation and barriers , 2018 .

[2]  Shang Gao,et al.  A holistic review of off-site construction literature published between 2008 and 2018 , 2018, Journal of Cleaner Production.

[3]  Tao Chen,et al.  How do project management competencies change within the project management career model in large Chinese construction companies? , 2019, International Journal of Project Management.

[4]  Subashini Suresh,et al.  Overcoming the Challenges facing Lean Construction Practice in the UK Contracting Organizations , 2015 .

[5]  Shakil Ahmed,et al.  Challenges of implementing lean construction in the construction industry in Bangladesh , 2019, Smart and Sustainable Built Environment.

[6]  S. Mohamed,et al.  Barriers to the application of lean construction techniques concerning safety improvement in construction projects , 2019, International Journal of Construction Management.

[7]  Low Sui Pheng,et al.  Barriers to lean implementation in the construction industry in China , 2014 .

[8]  Erica Seville,et al.  Measuring the organizational resilience of critical infrastructure providers: A New Zealand case study , 2017, Int. J. Crit. Infrastructure Prot..

[9]  Yikun Su,et al.  Factors Affecting the Capital Cost of Prefabrication—A Case Study of China , 2017 .

[10]  Seungki Park,et al.  An Assessment of Contract Management Capabilities for Overseas Construction Projects , 2018 .

[11]  Lukumon O. Oyedele,et al.  Critical management practices influencing on-site waste minimization in construction projects. , 2017, Waste management.

[12]  Huseyin Erol,et al.  Measuring the impact of lean construction practices on project duration and variability: A simulation-based study on residential buildings , 2016 .

[13]  A. Hadjichambis,et al.  Environmental Citizenship Questionnaire (ECQ): The Development and Validation of an Evaluation Instrument for Secondary School Students , 2020, Sustainability.

[14]  Sylvain Kubler,et al.  Opportunities for enhanced lean construction management using Internet of Things standards , 2016 .

[15]  X. K. Li,et al.  The application of an ANP-Fuzzy comprehensive evaluation model to assess lean construction management performance , 2019, Engineering, Construction and Architectural Management.

[16]  Majid Fazeli Kebria,et al.  Energy consumption and carbon emissions assessment of integrated production and erection of buildings’ pre-fabricated steel frames using lean techniques , 2020 .

[17]  David Carvajal-Arango,et al.  Relationships between lean and sustainable construction: Positive impacts of lean practices over sustainability during construction phase , 2019, Journal of Cleaner Production.

[18]  Yan Bo Li,et al.  Process and Quality Improvement Using Six Sigma in Construction Industry , 2012 .

[19]  Kiyoung Son,et al.  Survey of Motivations, Benefits, and Implementation Challenges of Last Planner System Users , 2013 .

[20]  Shahryar Sorooshian,et al.  Effect of Lean Tools to Control External Environment Risks of Construction Projects , 2017 .

[21]  Shuquan Li,et al.  A systematic review of lean construction in Mainland China , 2020 .

[22]  Hisham Said,et al.  Prefabrication Best Practices and Improvement Opportunities for Electrical Construction , 2015 .

[23]  Xiaodong Li,et al.  A new framework of industrialized construction in China: Towards on-site industrialization , 2020 .

[24]  Xiuyu Wu,et al.  A study on the evaluation of implementation level of lean construction in two Chinese firms , 2017 .

[25]  Soo Yong Kim,et al.  Identifying causes for waste factors in high-rise building projects: A survey in Vietnam , 2014 .

[26]  Lauri Koskela,et al.  Visual management in Brazilian construction companies : taxonomy and guidelines for implementation , 2015 .

[27]  Chandan Bhar,et al.  Modeling the key barriers to lean construction using interpretive structural modeling , 2017 .

[28]  Hong Xian Li,et al.  Evaluation of Informatization Performance of Construction Industrialization EPC Enterprises in China , 2020 .

[29]  Luis F. Alarcón,et al.  Assessing the Impacts of Implementing Lean Construction , 2008 .

[30]  Gangyan Xu,et al.  Cloud asset-enabled integrated IoT platform for lean prefabricated construction , 2018, Automation in Construction.

[31]  Teik Hua Law,et al.  Development of safety performance index for intercity buses: An exploratory factor analysis approach , 2017 .

[32]  J. M. Aguilar-Parra,et al.  Adaptation and Validation of the Mind-Wandering Questionnaire (MWQ) in Physical Education Classes and Analysis of Its Role as Mediator between Teacher and Anxiety , 2019, Sustainability.

[33]  Geoffrey Qiping Shen,et al.  RBL-PHP: Simulation of Lean Construction and Information Technologies for Prefabrication Housing Production , 2018 .

[34]  Robert Ries,et al.  Unlocking the green opportunity for prefabricated buildings and construction in China , 2018, Resources, Conservation and Recycling.

[35]  Yu Bai,et al.  Lean Methodologies and Techniques for Modular Construction: Chronological and Critical Review , 2019 .

[36]  Naveed Ahmad,et al.  Green, lean, Six Sigma barriers at a glance: A case from the construction sector of Pakistan , 2019, Building and Environment.

[37]  Aini Jaapar,et al.  Lean Construction: Towards Enhancing Sustainable Construction in Malaysia , 2012 .

[38]  Ayokunle Olubunmi Olanipekun,et al.  Barriers to implementing lean construction practices in the Kingdom of Saudi Arabia (KSA) construction industry , 2018 .

[39]  Lukumon O. Oyedele,et al.  Designing out construction waste using BIM technology: Stakeholders’ expectations for industry deployment , 2018 .

[40]  Xiaoling Zhang,et al.  Sustainable performance of just-in-time (JIT) management in time-dependent batch delivery scheduling of precast construction , 2018, Journal of Cleaner Production.

[41]  Ann Francis,et al.  Exploring the relationship between lean construction and environmental sustainability: A review of existing literature to decipher broader dimensions , 2020, Journal of Cleaner Production.

[42]  Mohamed Al-Hussein,et al.  Utilization of 3D Visualization of Mobile Crane Operations for Modular Construction On-Site Assembly , 2015 .

[43]  M. Skitmore,et al.  Analyzing causes for reworks in construction projects in China , 2015 .

[44]  Cheng Guo,et al.  Panel Stacking, Panel Sequencing, and Stack Locating in Residential Construction: Lean Approach , 2012 .

[45]  Mohamed Al-Hussein,et al.  Lean Transformation in a Modular Building Company: A Case for Implementation , 2013 .

[46]  Patrick X.W. Zou,et al.  Understanding and Improving Your Risk Management Capability: Assessment Model for Construction Organizations , 2010 .

[47]  E. Ibem,et al.  Implementation of lean practices in the construction industry: A systematic review , 2019, Building and Environment.

[48]  Nadia Lehoux,et al.  Simulation of a Construction Project: Assessing Impact of Just-in-Time and Lean Principles , 2019, Journal of Construction Engineering and Management.

[49]  Timothy R. Hinkin A Brief Tutorial on the Development of Measures for Use in Survey Questionnaires , 1998 .

[50]  Mohamed Al-Hussein,et al.  Process-Oriented Framework to Improve Modular and Offsite Construction Manufacturing Performance , 2020 .

[51]  N. Zhang,et al.  Hexagonal Diamond Model for International Competitive Advantages of High-Speed Railway Industry , 2020 .

[52]  M. S. Bajjou,et al.  Identifying and Managing Critical Waste Factors for Lean Construction Projects , 2020, Engineering Management Journal.

[53]  Qing He,et al.  Investigating the Constraints to Buidling Information Modeling (BIM) Applications for Sustainable Building Projects: A Case of China , 2019, Sustainability.

[54]  Nigel L. Williams,et al.  Understanding the nature of Project Management capacity in Sri Lankan non-governmental organisations (NGOs): A Resource Based Perspective , 2016 .

[55]  Mohamed Al-Hussein,et al.  Risk identification and assessment of modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulation , 2013 .

[56]  Gholamreza Heravi,et al.  Production process improvement of buildings’ prefabricated steel frames using value stream mapping , 2017 .

[57]  Emel Laptali Oral,et al.  JIT in developing countries—a case study of the Turkish prefabrication sector , 2003 .

[58]  Stuart D. Anderson,et al.  Framework for Competency and Capability Assessment for Resource Allocation , 2002 .

[59]  Mohamed Al-Hussein,et al.  Automated post-simulation visualization of modular building production assembly line , 2012 .

[60]  Heng Li,et al.  Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates , 2017 .

[61]  Lamine Mahdjoubi,et al.  Engineering Construction and Architectural Management DOI: 10.1108/ECAM-09-2018-0389 Design for Occupational Safety and Health: Key Attributes for Organisational Capability , 2019 .

[62]  Elisa D. Sotelino,et al.  Constructability in industrial plants construction: a BIM-Lean approach using the Digital Obeya Room framework , 2017 .

[63]  Xi Chen,et al.  Interrelationships among critical factors of work flow reliability in lean construction , 2017 .

[64]  Sam Solaimani,et al.  Toward a holistic view on lean sustainable construction: A literature review , 2020 .

[65]  Yang Miang Goh,et al.  Lean production theory-based simulation of modular construction processes , 2019, Automation in Construction.

[66]  Wei Peng,et al.  Assessing risk management capability of contractors in subway projects in mainland China , 2014 .