Impacts of Common Processes in Multistage Production System under Machine Breakdown and Quality Uncertainties
暂无分享,去创建一个
[1] Viliam Makis,et al. An EMQ model with inspections and random machine failures , 1998, J. Oper. Res. Soc..
[2] L. Ouyang,et al. An integrated vendor–buyer inventory model with quality improvement and lead time reduction , 2007 .
[3] Roelof Kuik,et al. Lead-time variability in a homogeneous queueing model of batching , 1999 .
[4] Jae-Dong Hong. The effects of manufacturing lead time and process quality in a multi-process production system , 1995 .
[5] Stanley B. Gershwin,et al. Integrated quality and quantity modeling of a production line , 2005, OR Spectr..
[6] Y. Chiu. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging , 2003 .
[7] Xin Zhang,et al. Joint lot sizing and inspection policy in an EOQ model with random yield , 1990 .
[8] Shamsuddin Ahmed,et al. Uncertainty Factors in Real Manufacturing Environment , 2009 .
[9] E. J. Aas,et al. Quantifying design quality: a model and design experiments , 1992, Proceedings Euro ASIC '92.
[10] Jayashankar M. Swaminathan,et al. Product Line Design with Component Commonality and Cost-Reduction Effort , 2006, Manuf. Serv. Oper. Manag..
[11] Evan L. Porteus. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..
[12] Wei Chen,et al. Methodology for Managing the Effect of Uncertainty in Simulation-Based Design , 2000 .
[13] Li Zhou,et al. Analysis of the effect of commonality in multi-level inventory systems applying MRP theory , 2004 .
[14] Mitchell M. Tseng,et al. Understanding product family for mass customization by developing commonality indices , 2000 .
[15] W. M. Chan,et al. A new EPQ model: integrating lower pricing, rework and reject situations , 2003 .
[16] Jason Chao-Hsien Pan,et al. Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment , 2004 .
[17] M. A. Wazed,et al. Commonality in Manufacturing Resources Planning - Issues and Models: A Review , 2010 .
[18] Shamsuddin Ahmed. Managing Quality and Lead Time Uncertainties Under Component Commonality , 2008 .
[19] Mark S. Hillier. The costs and benefits of commonality in assemble-to-order systems with a (Q, r)-policy for component replenishment , 2002, Eur. J. Oper. Res..
[20] Liang-Yuh Ouyang,et al. Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process , 2002, Comput. Oper. Res..
[21] Wei Wang,et al. Commonality and postponement in multistage assembly systems , 2002, Eur. J. Oper. Res..
[22] Prakash Mirchandani,et al. COMPONENT COMMONALITY: MODELS WITH PRODUCT‐SPECIFIC SERVICE CONSTRAINTS* , 2009 .
[23] Mohamed Ben-Daya,et al. Optimal lot-sizing, quality improvement and inspection errors for multistage production systems , 2003 .
[24] Sameh M. Saad,et al. MRP-controlled manufacturing environment disturbed by uncertainty , 2003 .