Building Galileo Navigation System: Two Years of Giove-M Experimentation
暂无分享,去创建一个
Ilaria Sesia | Patrizia Tavella | Patrizia Tavella | R. Piriz | Giancarlo Cerretto | S. Binda | I. Hidalgo | A. Mozo | Ilaria Sesia | A. Mudrak | G. Tobías | R. Piriz | D. Navarro | G. Tobías | D. Rodriguez | A. Mudrak | F. Gonzalez | A. Mozo | D. Navarro
[1] Ilaria Sesia,et al. GPS/GIOVE interoperability: GGTO and timing biases , 2008 .
[2] Gerd Gendt,et al. The International GPS Service: Celebrating the 10th anniversary and looking to the next decade , 2005 .
[3] P. Defraigne,et al. Timing Aspects of GPS-Galileo Interoperability: Challenges and Solutions , 2004 .
[4] Patrizia Tavella,et al. E-OSPF Experimentation results in the frame of the GIOVE-M Core Infrastructure , 2009 .
[5] Joerg H. Hahn. Technical Status of the Galileo System Development , 2007 .
[6] Patrizia Tavella,et al. Estimation and Prediction of the Giove Clocks , 2008 .
[7] Gerhard Beutler,et al. Combined processing of the IGS and the IGEX network , 2001 .
[8] J.H. Hahn,et al. A Report on GPS and Galileo Time Offset Coordination Efforts , 2007, 2007 IEEE International Frequency Control Symposium Joint with the 21st European Frequency and Time Forum.
[9] I. Sesia,et al. Update on the In-Orbit performances of GIOVE clocks , 2009, 2009 IEEE International Frequency Control Symposium Joint with the 22nd European Frequency and Time forum.