건설공사에 있어서 FOLAT의 소유권 및 가치에 관한 연구 ( A Study on the Ownership and Trade-in value of float in Construction Project )

Float is a by-product of critical-path-method calculations. It represents the length of time that an activitie's finish date may be delayed without affecting the completion date of the entire project. But that float can affect the opportunities of early completion because using the float of noncritical path is able to increase the possibility of being critical path. Therefore, it is reasonable to be considered that float has trade-in value as commodity. this paper acknowledges the fact that float is benificial to both owners and contractors. it does so by proposing ways of making its commercial trade-in-opportunity value explicit.