Simultaneous Production Scheduling and Waste Management Optimization for an Oil Sands Application

Mine planning for oil sands involves the integration of waste management into the long term production planning process. This ensures that while ore is provided for the processing plant, sufficient in-pit tailings containment areas are made available as dedicated disposal areas for backfilling. This enables the creation of a trafficable landscape at the earliest opportunity to facilitate progressive reclamation. Apart from being a regulatory requirement, this integration impacts directly on the profitability and sustainability of oil sands mining operations. This paper introduces a mixed integer linear programming mine planning framework that seeks to simultaneously determine the production schedule, dyke construction schedule and the backfilling schedule. Different waste management strategies were also investigated. The model generated a practical, smooth and uniform schedule for ore, dyke material and backfilling activities. The results show that for the case studies considered, increasing the number of in-pit tailings cells reduces the net present value of the mine as a result of a reduced operational flexibility. However, this strategy makes in-pit tailings storage areas available earlier in the mine life, and ensures an efficient use of in-pit storage areas required for sustainable operations.

[1]  Sean D. Dessureault,et al.  Application of Computers and Operations Research in the Mineral Industry , 2005 .

[2]  R. Dimitrakopoulos,et al.  Recent applications of operations research and efficient MIP formulations in open pit mining , 2004 .

[3]  Lou Caccetta,et al.  An Application of Branch and Cut to Open Pit Mine Scheduling , 2003, J. Glob. Optim..

[4]  Edward L. Hannan,et al.  An assessment of some criticisms of goal programming , 1985, Comput. Oper. Res..

[5]  Kwame Awuah-Offei,et al.  Large-scale open pit production scheduling using Mixed Integer Linear Programming , 2010 .

[6]  H. Askari-Nasab,et al.  Mixed integer linear programming formulations for open pit production scheduling , 2011 .

[7]  Milan Zeleny Multiple objectives in mathematical programming: Letting the man in , 1980, Comput. Oper. Res..

[8]  Thys B Johnson,et al.  OPTIMUM OPEN PIT MINE PRODUCTION SCHEDULING , 1968 .

[9]  Thys B. Johnson,et al.  Optimum multi period open pit mine production scheduling , 2016 .

[10]  H. Askari-Nasab,et al.  Two-stage clustering algorithm for block aggregation in open pit mines , 2011 .

[11]  Mark Gershon,et al.  Optimal mine production scheduling: evaluation of large scale mathematical programming approaches , 1983 .

[12]  Salih Ramazan Open pit mine scheduling based on fundamental tree algorithm , 2007 .

[13]  Y. P. Cheng,et al.  Application of goal programming in open pit planning , 1993 .

[14]  H. Askari-Nasab,et al.  Incorporating waste management into oil sands long term production planning , 2013 .

[15]  Kadri Dagdelen,et al.  Optimal blending of mine production using goal programming and interactive graphics systems , 1995 .

[16]  Kwame Awuah-Offei,et al.  Production Scheduling and Waste Disposal Planning for Oil Sands Mining Using Goal Programming , 2012 .

[17]  H. Askari-Nasab,et al.  Oil sands mine planning and waste management using mixed integer goal programming , 2011 .