A comparative study on the rapid seismic evaluation methods of reinforced concrete buildings

Abstract In this study, firstly, visual screening based (VSB) (FEMA 154, RVS and RBTE) and capacity-based (P25, Yakut, AURAP and DURTES) methods which are rapid seismic safety assessment methods of existing buildings have discussed. In addition, the linear and nonlinear earthquake performance procedures of the reinforced concrete structures according to the TBEC-2018 which does not have a rapid evaluation method but includes a detailed performance analysis procedure code were also given. After that, 30 existing reinforced concrete buildings collected from Istanbul-Turkey have been analyzed to all these mentioned methods. In this study results of all 7 different rapid seismic assessment methods were compared with results of TBEC-2018's linear and nonlinear performance with regard to advantages and disadvantages. Finally, it was seen that while FEMA 154, RVS and RBTE methods are faster to apply on the buildings however P25, Yakut, AURAP and DURTES methods take more time to apply and give more conservative results. It was observed that the results obtained from the non-linear evaluation method of TBEC-2018 are less conservative than other methods. In addition, different results obtained from linear and nonlinear evaluation methods given in TBEC-2018 for the same buildings were also drawn attention.

[1]  Michel Bruneau,et al.  Building damage from the Marmara, Turkey earthquake of August 17, 1999 , 2002 .

[2]  A. Yakut,et al.  Preliminary Seismic Vulnerability Assessment of Existing Reinforced Concrete Buildings in Turkey , 2003 .

[3]  Ahmet Yakut,et al.  A Screening Procedure for Seismic Risk Assessment in Urban Building Stocks , 2007 .

[4]  Alemdar Bayraktar,et al.  Performance and damages of reinforced concrete buildings during the October 23 and November 9, 2011 Van, Turkey, earthquakes , 2013 .

[5]  Ercan Işık The Effects of 23.10.2011 Van Earthquake on Near-Field and Damaged on Structures , 2014 .

[6]  Paolo Franchin,et al.  Seismic fragility analysis of 3D structures , 2004 .

[7]  M. Arslan,et al.  A comparative study on ASCE 7-16, TBEC-2018 and TEC-2007 for reinforced concrete buildings , 2020, Revista de la construcción.

[8]  Andrew S. Whittaker,et al.  Performance of reinforced concrete buildings during the August 17, 1999 Kocaeli, Turkey earthquake, and seismic design and construction practise in Turkey , 2003 .

[9]  Musa Hakan Arslan,et al.  An OVERVIEW on EARTHQUAKE LOAD REDUCTION FACTOR of REINFORCED CONCRETE BUILDINGS , 2011 .

[10]  B. Erdil,et al.  A Detailed Comparison of Preliminary Seismic Vulnerability Assessment Methods for RC Buildings , 2019, Iranian Journal of Science and Technology, Transactions of Civil Engineering.

[11]  Cem Demir,et al.  Performance Based Rapid Seismic Assessment Method (PERA) for Reinforced Concrete Frame Buildings , 2014 .

[12]  Betül Şengezer,et al.  Evaluation of parameters affecting earthquake damage by decision tree techniques , 2008 .

[13]  Adem Doǧangün,et al.  Performance of reinforced concrete buildings during the May 1, 2003 Bingöl Earthquake in Turkey , 2004 .

[14]  Korhan Adalier,et al.  Structural engineering aspects of the June 27, 1998 Adana–Ceyhan (Turkey) earthquake , 2001 .

[15]  Luis G. Pujades,et al.  Seismic risk in the city of Al Hoceima (north of Morocco) using the vulnerability index method, applied in Risk-UE project , 2016, Natural Hazards.

[16]  A Simplified Method for Preliminary Seismic Vulnerability Assessment of Existing Building in Kundasang, Sabah, Malaysia , 2015 .

[17]  Radhikesh P. Nanda,et al.  Rapid visual screening procedure of existing building based on statistical analysis , 2018, International Journal of Disaster Risk Reduction.

[18]  Gerardo M. Verderame,et al.  Seismic risk of R.C. building classes , 2007 .

[19]  Hayri Baytan Ozmen,et al.  Re-evaluation of building damage during recent earthquakes in Turkey , 2008 .

[20]  Murat Ceylan,et al.  AN ANN APPROACHES ON ESTIMATING EARTHQUAKE PERFORMANCES OF EXISTING RC BUILDINGS , 2012 .

[21]  Mete A. Sozen,et al.  Seismic Vulnerability Assessment of Low-Rise Buildings in Regions with Infrequent Earthquakes , 1997 .

[22]  Shehata E. Abdel Raheem,et al.  Numerical simulation of potential seismic pounding among adjacent buildings in series , 2018, Bulletin of Earthquake Engineering.

[23]  Jack P. Moehle,et al.  Seismic Evaluation of Existing Reinforced Concrete Building Columns , 1996 .

[24]  K. Mohan,et al.  Rapid Visual Screening of RC frame buildings in 2001 Bhuj earthquake affected Rambaug area of Ahmedabad , Gujarat , 2019 .

[25]  Shashank Mishra,et al.  Rapid visual screening of different housing typologies in Himachal Pradesh, India , 2017, Natural Hazards.

[26]  Asena Soyluk Architectural Design of Irregular Buildings in Turkey , 2012 .

[27]  E. Miranda,et al.  Probabilistic estimation of residual drift demands for seismic assessment of multi-story framed buildings , 2010 .

[28]  S. Korkmaz Observations on the Van Earthquake and Structural Failures , 2015 .

[29]  Ahmet Yakut,et al.  Preliminary seismic performance assessment procedure for existing RC buildings , 2004 .

[30]  Mauro Dolce,et al.  Building damage assessment after the 2009 Abruzzi earthquake , 2015, Bulletin of Earthquake Engineering.

[31]  H. C. Mertol,et al.  Damage in Reinforced-Concrete Buildings during the 2011 Van, Turkey, Earthquakes , 2014 .

[32]  Alper Aldemir,et al.  Rapid screening method for the determination of seismic vulnerability assessment of RC building stocks , 2019, Bulletin of Earthquake Engineering.

[34]  Sashi K. Kunnath,et al.  Assessment of current nonlinear static procedures for seismic evaluation of buildings , 2007 .

[35]  Mihailo D. Trifunac,et al.  Earthquake damage detection in the Imperial County Services Building I: The data and time–frequency analysis , 2007 .

[36]  M. Hakan Arslan,et al.  A new approach on the strengthening of primary school buildings in Turkey: An application of external shear wall , 2008 .

[37]  Adrian M. Chandler,et al.  Performance of reinforced concrete frames using force and displacement based seismic assessment methods , 2000 .

[38]  Onur Kaplan,et al.  A rapid seismic safety assessment method for mid-rise reinforced concrete buildings , 2017, Bulletin of Earthquake Engineering.

[39]  M. H. Arslan,et al.  What is to be learned from damage and failure of reinforced concrete structures during recent earthquakes in Turkey , 2007 .