Regulatory basis for the Waste Isolation Pilot Plant performance assessment
暂无分享,去创建一个
[1] Jon C. Helton,et al. Characterization of subjective uncertainty in the 1996 performance assessment for the Waste Isolation Pilot Plant , 2000, Reliab. Eng. Syst. Saf..
[2] Jon C. Helton,et al. Conceptual structure of the 1996 performance assessment for the Waste Isolation Pilot Plant , 2000, Reliab. Eng. Syst. Saf..
[3] Jon C. Helton,et al. Risk, Uncertainty in Risk, and the EPA Release Limits for Radioactive Waste Disposal , 1993 .
[4] Gary K. Froehlich,et al. Software quality assurance in the 1996 performance assessment for the Waste Isolation Pilot Plant , 2000, Reliab. Eng. Syst. Saf..
[5] Rob P. Rechard,et al. Historical background on performance assessment for the Waste Isolation Pilot Plant , 1999, Reliab. Eng. Syst. Saf..
[6] M. G. Marietta,et al. Preliminary comparison with 40 CFR Part 191, Subpart B for the Waste Isolation Pilot Plant, December 1990 , 1990 .
[7] Peter N. Swift,et al. Long-term climate variability at the Waste Isolation Pilot Plant, southeastern New Mexico, USA , 1993 .
[8] P. Knupp,et al. The role of regional groundwater flow in the hydrogeology of the Culebra member of the Rustler formation at the Waste Isolation Pilot Plant (WIPP), southeastern New Mexico , 1996 .
[9] Jon C. Helton,et al. Performance Assessment for the Waste Isolation Pilot Plant: From Regulation to Calculation for 40 CFR 191.13 , 1997, Oper. Res..
[10] M. G. Marietta,et al. Uncertainty and sensitivity analysis results obtained in the 1992 performance assessment for the waste isolation pilot plant , 1996 .
[11] Peter N. Swift,et al. Scenario development for the Waste Isolation Pilot Plant Compliance Certification Application , 2000, Reliab. Eng. Syst. Saf..