A framework for estimating residual stress profile in seam-welded pipe and vessel components part I: Weld region

[1]  P. Dong,et al.  An IIW residual stress profile estimation scheme for girth welds in pressure vessel and piping components , 2016, Welding in the World.

[2]  P. Dong,et al.  A Thermal Stress Mitigation Technique for Local Postweld Heat Treatment of Welds in Pressure Vessels , 2015 .

[3]  P. Dong,et al.  An analytical interpretation of welding linear heat input for 2D residual stress models , 2015 .

[4]  Pingsha Dong,et al.  A full-field residual stress estimation scheme for fitness-for-service assessment of pipe girth welds: Part II – A shell theory based implementation , 2015 .

[5]  Pingsha Dong,et al.  A full-field residual stress estimation scheme for fitness-for-service assessment of pipe girth welds: Part I - Identification of key parameters , 2015 .

[6]  Pingsha Dong,et al.  On residual stress prescriptions for fitness for service assessment of pipe girth welds , 2014 .

[7]  P. Dong,et al.  Analysis of residual stress relief mechanisms in post-weld heat treatment , 2014 .

[8]  P. Dong,et al.  Investigation of Residual Stresses Distribution in Titanium Weldments , 2014 .

[9]  D J Abson,et al.  Review of type IV cracking of weldments in 9–12%Cr creep strength enhanced ferritic steels , 2013 .

[10]  Thomas H. Hyde,et al.  A comparison between measured and modeled residual stresses in a circumferentially Butt-welded P91 steel pipe , 2010 .

[11]  Pingsha Dong,et al.  Length scale of secondary stresses in fracture and fatigue , 2008 .

[12]  Adib A. Becker,et al.  Numerical simulation of P91 pipe welding including the effects of solid-state phase transformation on residual stresses , 2007 .

[13]  P. J. Bouchard,et al.  Validated residual stress profiles for fracture assessments of stainless steel pipe girth welds , 2007 .

[14]  Pingsha Dong,et al.  On the Residual Stress Profiles in New API 579/ASME FFS-1 Appendix E , 2007 .

[15]  M. N. James,et al.  Design, manufacture and materials; their interaction and role in engineering failures , 2005 .

[16]  P. Dong,et al.  Analysis of IIW X/XV RSDP Phase I Round-Robin Residual Stress Results , 2002 .

[17]  F. M. Burdekin,et al.  Engineering critical analyses to BS 7910 — the UK guide on methods for assessing the acceptability of flaws in metallic structures , 2000 .

[18]  Pingsha Dong,et al.  Welding Residual Stresses and Effects on Fracture in Pressure Vessel and Piping Components: A Millennium Review and Beyond , 2000 .

[19]  Ramaswamy Viswanathan,et al.  Life management of high-temperature piping and tubing in fossil power plants , 2000 .

[20]  Robert D. Cook Circumferential Stresses in Curved Beams , 1992 .

[21]  Ashok Saxena,et al.  A Methodology for Evaluating the Integrity of Longitudinally Seam-Welded Steam Pipes in Fossil Plants , 1988 .

[22]  Robert A. Ainsworth,et al.  Assessment of the integrity of structures containing defects , 1987 .

[23]  R. Cook,et al.  Advanced Mechanics of Materials , 1985 .

[24]  John G. Merkle,et al.  Test of Thick Vessel with a Flaw in Residual Stress Field , 1981 .