Duration and cost variability of construction activities: An empirical study
暂无分享,去创建一个
Graeme D. Larsen | Robby Soetanto | Enoc Sanz-Ablanedo | Pablo Ballesteros-Pérez | Alberto Cerezo-Narváez | M. Carmen Gonzalez-Cruz
[1] Pablo Ballesteros-Pérez,et al. Incorporating the effect of weather in construction scheduling and management with sine wave curves: application in the United Kingdom , 2018, Construction Management and Economics.
[2] Mojtaba Valinejad Shoubi,et al. CONSTRUCTION PROJECTS , 2003 .
[3] Pablo Ballesteros-Pérez. Modelling the boundaries of project fast-tracking , 2017 .
[4] Frederick S. Merritt. Building construction handbook , 1975 .
[5] L. V. Tavares,et al. The risk of delay of a project in terms of the morphology of its network , 1999, Eur. J. Oper. Res..
[6] Mario Vanhoucke,et al. Construction and evaluation framework for a real-life project database , 2015 .
[7] Yahya Fathi,et al. On the sensitivity of project variability to activity mean duration , 1999 .
[8] Sungbin Cho,et al. A linear Bayesian stochastic approximation to update project duration estimates , 2009, Eur. J. Oper. Res..
[9] Lauri Koskela,et al. What Can Be Learned From Studies on Delay in Construction , 2008 .
[10] K. MacCrimmon,et al. An Analytical Study of the PERT Assumptions , 1964 .
[11] Miklós Hajdu,et al. The Effects of Different Activity Distributions on Project Duration in PERT Networks , 2014 .
[12] Anand Paul,et al. On path correlation and PERT bias , 2008, Eur. J. Oper. Res..
[13] E. M. Davies. An Experimental Investigation of Resource Allocation in Multiactivity Projects , 1973 .
[14] Graeme D. Larsen,et al. Do Projects really end late? On the shortcomings of the classical scheduling techniques , 2018 .
[15] Mario Vanhoucke,et al. An Overview of Project Data for Integrated Project Management and Control , 2016 .
[16] Denis F. Cioffi,et al. Uncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling , 2013 .
[17] Mete Sirvanci,et al. Stochastic networks and the extreme value distribution , 1990, Comput. Oper. Res..
[18] Miklós Hajdu,et al. Sensitivity analysis in PERT networks: Does activity duration distribution matter? , 2016 .
[19] Salah E. Elmaghraby. On criticality and sensitivity in activity networks , 2000, Eur. J. Oper. Res..
[20] S. Ogunlana,et al. Construction delays in a fast-growing economy: Comparing Thailand with other economies , 1996 .
[21] Mario Vanhoucke,et al. Forecasting a Project's Duration under Various Topological Structures , 2009 .
[22] Daniel Mora-Meliá,et al. Weather-wise: A weather-aware planning tool for improving construction productivity and dealing with claims , 2017 .
[23] Mario Vanhoucke. Measuring time using novel earned value management metrics , 2008 .
[24] Mario Vanhoucke,et al. Project Management with Dynamic Scheduling , 2012 .
[25] Darren George,et al. SPSS for Windows Step by Step: A Simple Guide and Reference , 1998 .
[26] Wynand Jacobus Van der Merwe Steyn,et al. Causes of delay in road construction projects in Malawi , 2013 .
[27] Kenneth R. Baker,et al. Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation , 2012, Eur. J. Oper. Res..
[28] Peter E.D. Love,et al. Determining the probability distribution of rework costs in construction and engineering projects , 2013 .
[29] Pablo Ballesteros-Pérez,et al. M-PERT: Manual project-duration estimation technique for teaching scheduling basics , 2017 .
[30] A. F. Caletka,et al. Delay analysis in construction contracts , 2008 .
[31] Pablo Ballesteros-Pérez,et al. Climate and construction delays: Case study in Chile , 2015 .