Duration and cost variability of construction activities: An empirical study

AbstractThe unique nature of construction projects can mean that construction activities often suffer from duration and cost variability. Because this variability is unplanned, it can present a pro...

[1]  Pablo Ballesteros-Pérez,et al.  Incorporating the effect of weather in construction scheduling and management with sine wave curves: application in the United Kingdom , 2018, Construction Management and Economics.

[2]  Mojtaba Valinejad Shoubi,et al.  CONSTRUCTION PROJECTS , 2003 .

[3]  Pablo Ballesteros-Pérez Modelling the boundaries of project fast-tracking , 2017 .

[4]  Frederick S. Merritt Building construction handbook , 1975 .

[5]  L. V. Tavares,et al.  The risk of delay of a project in terms of the morphology of its network , 1999, Eur. J. Oper. Res..

[6]  Mario Vanhoucke,et al.  Construction and evaluation framework for a real-life project database , 2015 .

[7]  Yahya Fathi,et al.  On the sensitivity of project variability to activity mean duration , 1999 .

[8]  Sungbin Cho,et al.  A linear Bayesian stochastic approximation to update project duration estimates , 2009, Eur. J. Oper. Res..

[9]  Lauri Koskela,et al.  What Can Be Learned From Studies on Delay in Construction , 2008 .

[10]  K. MacCrimmon,et al.  An Analytical Study of the PERT Assumptions , 1964 .

[11]  Miklós Hajdu,et al.  The Effects of Different Activity Distributions on Project Duration in PERT Networks , 2014 .

[12]  Anand Paul,et al.  On path correlation and PERT bias , 2008, Eur. J. Oper. Res..

[13]  E. M. Davies An Experimental Investigation of Resource Allocation in Multiactivity Projects , 1973 .

[14]  Graeme D. Larsen,et al.  Do Projects really end late? On the shortcomings of the classical scheduling techniques , 2018 .

[15]  Mario Vanhoucke,et al.  An Overview of Project Data for Integrated Project Management and Control , 2016 .

[16]  Denis F. Cioffi,et al.  Uncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling , 2013 .

[17]  Mete Sirvanci,et al.  Stochastic networks and the extreme value distribution , 1990, Comput. Oper. Res..

[18]  Miklós Hajdu,et al.  Sensitivity analysis in PERT networks: Does activity duration distribution matter? , 2016 .

[19]  Salah E. Elmaghraby On criticality and sensitivity in activity networks , 2000, Eur. J. Oper. Res..

[20]  S. Ogunlana,et al.  Construction delays in a fast-growing economy: Comparing Thailand with other economies , 1996 .

[21]  Mario Vanhoucke,et al.  Forecasting a Project's Duration under Various Topological Structures , 2009 .

[22]  Daniel Mora-Meliá,et al.  Weather-wise: A weather-aware planning tool for improving construction productivity and dealing with claims , 2017 .

[23]  Mario Vanhoucke Measuring time using novel earned value management metrics , 2008 .

[24]  Mario Vanhoucke,et al.  Project Management with Dynamic Scheduling , 2012 .

[25]  Darren George,et al.  SPSS for Windows Step by Step: A Simple Guide and Reference , 1998 .

[26]  Wynand Jacobus Van der Merwe Steyn,et al.  Causes of delay in road construction projects in Malawi , 2013 .

[27]  Kenneth R. Baker,et al.  Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation , 2012, Eur. J. Oper. Res..

[28]  Peter E.D. Love,et al.  Determining the probability distribution of rework costs in construction and engineering projects , 2013 .

[29]  Pablo Ballesteros-Pérez,et al.  M-PERT: Manual project-duration estimation technique for teaching scheduling basics , 2017 .

[30]  A. F. Caletka,et al.  Delay analysis in construction contracts , 2008 .

[31]  Pablo Ballesteros-Pérez,et al.  Climate and construction delays: Case study in Chile , 2015 .