A Review of Manufacturing Resources Planning Models Under Different Uncertainties: State-of-The-Art and Future Directions

The main purposes of this paper are to enhance the understanding of manufacturing resources planning models under uncertain conditions by documenting the current state of affairs, and to stimulate a fruitful future research direction by identifying gaps between the relevant issues and the literature available in reputable journals. This paper is a comprehensive and up-to-date review of the existing literature on manufacturing resource planning models under uncertainty. The authors have found that the combined effects/ impacts of the uncertainty factors on the system parameters have yet to be thoroughly studied. So far no research has been conducted into developing mathematical model(s) to study the uncertainty issues holistically in multi-period, multiple product, and multi-stage environments for manufacturing resources planning in association with commonality. OPSOMMING Die primere doel van hierdie artikel is om die insig in vervaardigingshulpbronbeplanning onder onsekerheid te bevorder. Die huidige stand van sake word ondersoek en gapings word uitgewys aan die hand van literatuur beskikbaar in gesaghebbende joernale. Die outeurs bevind in die studie dat die sisteemparameters en die invloed van onsekerheid daarop nog nie voldoende bestudeer is nie. Geen navorsing is nog onderneem om wiskundige modelle te ontwikkel om op holistiese wyse die impak van onsekerheid in multi-periode, veelvoudige produk en multi-stadium omgewing te bestudeer nie.

[1]  Kathryn B. Laskey Model uncertainty: theory and practical implications , 1996, IEEE Trans. Syst. Man Cybern. Part A.

[2]  Madan M. Gupta,et al.  Uncertainty modelling and analysis : theory and applications , 1994 .

[3]  Su-huan Chen,et al.  Interval optimization for uncertain structures , 2004 .

[4]  Edward R. Clayton,et al.  Analysis of material and capacity requirements with Q-GERT , 1982 .

[5]  Konstantin Kogan,et al.  Multi-stage newsboy problem: A dynamic model , 2003, Eur. J. Oper. Res..

[6]  S. J. Simoff Handling uncertainty in neural networks: an interval approach , 1996, Proceedings of International Conference on Neural Networks (ICNN'96).

[7]  Robert W. Grubbström,et al.  Planning and replanning the master production schedule under demand uncertainty , 2002 .

[8]  Bernard Grabot,et al.  Integration of uncertain and imprecise orders in the MRP method , 2005, J. Intell. Manuf..

[9]  Leopoldo Eduardo Cárdenas-Barrón On optimal batch sizing in a multi-stage production system with rework consideration , 2009, Eur. J. Oper. Res..

[10]  Bhaba R. Sarker,et al.  A Review of:“Factory Physics: Foundations of Manufacturing Management” Wallace J. Hopp and Mark L. Spearman Richard D. Irwin, Inc., 1996 , 1997 .

[11]  Kenth Lumsden,et al.  Actions taken to prevent the propagation of disturbances in manufacturing systems , 1995 .

[12]  John O. McClain,et al.  Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction , 1983 .

[13]  J. Doyle,et al.  Robust and optimal control , 1995, Proceedings of 35th IEEE Conference on Decision and Control.

[14]  Mohamed Ben-Daya,et al.  Integrated inventory and inspection policies for stochastic demand , 2008, Eur. J. Oper. Res..

[15]  Surendra M. Gupta,et al.  A structured analysis of material requirements planning systems under combined demand and supply uncertainty , 1993 .

[16]  Bhaba R. Sarker,et al.  Optimal batch sizing in a multi-stage production system with rework consideration , 2008, Eur. J. Oper. Res..

[17]  G. Hazelrigg Systems Engineering: An Approach to Information-Based Design , 1996 .

[18]  Edilson Fernandes de Arruda,et al.  Stability and optimality of a multi-product production and storage system under demand uncertainty , 2008, Eur. J. Oper. Res..

[19]  Yakov Ben-Haim,et al.  A non-probabilistic concept of reliability , 1994 .

[20]  John A. Buzacott,et al.  Safety stock versus safety time in MRP controlled production systems , 1994 .

[21]  S. T. Enns,et al.  Multi-product capacity-constrained lot sizing with economic objectives , 2004 .

[22]  Jo van Nunen,et al.  E-fulfillment and multi-channel distribution - A review , 2006, Eur. J. Oper. Res..

[23]  Chrwan-Jyh Ho,et al.  Uncertainty-dampening methods for reducing MRP system nervousness , 1995 .

[24]  K. Richter,et al.  An extended production/recycling model with stationary demand and return rates , 2004 .

[25]  Sameh M. Saad,et al.  MRP-controlled manufacturing environment disturbed by uncertainty , 2003 .

[26]  Paul M. Swamidass,et al.  Manufacturing strategy, environmental uncertainty and performance: a path analytic model , 1987 .

[27]  Dongbo Li,et al.  A meta-modeling paradigm of the manufacturing resources using mathematical logic for process planning , 2008 .

[28]  A. Lusa,et al.  A multistage scenario optimisation procedure to plan annualised working hours under demand uncertainty , 2008 .

[29]  S. C. Lenny Koh,et al.  Managing uncertainty in ERP-controlled manufacturing environments in SMEs , 2006 .

[30]  Kit-Nam Francis Leung,et al.  An integrated production-inventory system in a multi-stage multi-firm supply chain , 2010 .

[31]  Hsi-Mei Hsu,et al.  Possibilistic programming in production planning of assemble-to-order environments , 2001, Fuzzy Sets Syst..

[32]  Laurence A. Wolsey,et al.  Modelling Practical Lot-Sizing Problems as Mixed-Integer Programs , 2001, Manag. Sci..

[33]  Alexandre Dolgui,et al.  The MPS parameterization under lead time uncertainty , 2004 .

[34]  Frank L. Lewis,et al.  A matrix formulation for integrating assembly trees and manufacturing resource planning with capacity constraints , 2002, J. Intell. Manuf..

[35]  Zdzisław Pawlak Some remarks on rough sets , 1982 .

[36]  S. T. Enns MRP performance effects due to lot size and planned lead time settings , 2001 .

[37]  Chen-Hua Chung,et al.  Planning horizons for master production scheduling , 1984 .

[38]  Osamu Hori,et al.  Uncertainty model of the gradient constraint and quantitative reliability measures of optical flow , 1999 .

[39]  Ramana V. Grandhi,et al.  Efficient estimation of structural reliability for problems with uncertain intervals , 2001 .

[40]  Shabbir Ahmed,et al.  A Multi-Stage Stochastic Integer Programming Approach for Capacity Expansion under Uncertainty , 2003, J. Glob. Optim..

[41]  David Z. Zhang,et al.  An agent-based approach for integrating manufacturing operations , 2009 .

[42]  Silvanus T. Enns MRP performance effects due to forecast bias and demand uncertainty , 2002, Eur. J. Oper. Res..

[43]  Lawrence C. Leung,et al.  Fuzzy production planning model for fresh tomato packing , 1997 .

[44]  Y. Ben-Haim Robust reliability in the mechanical sciences , 1996 .

[45]  E. Antonsson,et al.  Representing imprecision in engineering design: Comparing fuzzy and probability calculus , 1990 .

[46]  Jayashankar M. Swaminathan,et al.  Product Line Design with Component Commonality and Cost-Reduction Effort , 2006, Manuf. Serv. Oper. Manag..

[47]  Robert W. Grubbström,et al.  A net present value approach to safety stocks in a multi-level MRP system , 1999 .

[48]  F. Fred Choobineh,et al.  The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty , 2005 .

[49]  Nii O. Attoh-Okine UNCERTAINTY ANALYSIS IN STRUCTURAL NUMBER DETERMINATION IN FLEXIBLE PAVEMENT DESIGN - A CONVEX MODEL APPROACH , 2002 .

[50]  Richard Metters,et al.  Adapting lot-sizing techniques to stochastic demand through production scheduling policy , 1996 .

[51]  Geoff Buxey,et al.  Production scheduling: Practice and theory , 1989 .

[52]  Fiona Fui-Hoon Nah,et al.  Enterprise resource planning solutions and management , 2001 .

[53]  Wallace J. Hopp,et al.  Factory physics : foundations of manufacturing management , 1996 .

[54]  A. Dolgui,et al.  A model for supply planning under lead time uncertainty , 2002 .

[55]  Wei Chen,et al.  Methodology for Managing the Effect of Uncertainty in Simulation-Based Design , 2000 .

[56]  C. Yano,et al.  The strategic use of capacity slack in the economic lot scheduling problem with random demand , 1994 .

[57]  Chun Hung Cheng,et al.  Multi-period planning and uncertainty issues in cellular manufacturing: A review and future directions , 2007, Eur. J. Oper. Res..

[58]  Chrwan-Jyh Ho,et al.  Evaluating the impact of operating environments on MRP system nervousness , 1989 .

[59]  K. Richter,et al.  A production/recycling model with quality consideration , 2006 .

[60]  D. E. Beasley,et al.  Theory and design for mechanical measurements , 1991 .

[61]  Lee H. Keel,et al.  Quantification of Parametric Uncertainty via an Interval Model , 1994 .

[62]  Jm Judith Spitter,et al.  Timing production in LP models in a rolling schedule , 2005 .

[63]  A. Volgenant,et al.  Operations management: Strategy and analysis , 1988 .

[64]  Sameh M. Saad,et al.  Uncertainty under MRP-planned manufacture: Review and categorization , 2002 .

[65]  Luis Puigjaner,et al.  Effects of equipment failure uncertainty in batch production scheduling , 1995 .

[66]  Loren Paul Rees,et al.  Integrating the MRP-based control level and the multi-stage shop level of a manufacturing system via network simulation , 1985 .

[67]  Sameh M. Saad,et al.  A holistic approach to diagnose uncertainty in ERP-controlled manufacturing shop floor , 2003 .

[68]  V. D. R. Guide,et al.  A review of techniques for buffering against uncertainty with MRP systems , 2000 .

[69]  Bilal M. Ayyub,et al.  Uncertainty Modeling and Analysis in Civil Engineering , 1997 .

[70]  A. Molinder,et al.  Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system , 1997 .

[71]  Mark Pagell,et al.  A multiple-method study of environmental uncertainty and manufacturing flexibility , 1999 .

[72]  Raul Poler Escoto,et al.  MRP with flexible constraints: A fuzzy mathematical programming approach , 2006, Fuzzy Sets Syst..

[73]  Yue Wu,et al.  Production , Manufacturing and Logistics A robust optimization model for multi-site production planning problem in an uncertain environment , 2007 .

[74]  William Manners Classification and Analysis of Uncertainty in Structural Systems , 1991 .

[75]  Hyun-Joon Kim,et al.  Manufacturing lot-sizing under MRP II environment: an improved analytical model & a heuristic procedure , 1998 .

[76]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[77]  Sameh M. Saad,et al.  Handling internal and external disturbances in responsive manufacturing environments , 1998 .

[78]  William L. Berry,et al.  Manufacturing Planning and Control Systems , 1984 .

[79]  Sameh M. Saad,et al.  Development of a business model for diagnosing uncertainty in ERP environments , 2002 .

[80]  Luc Bongaerts,et al.  Disturbance measurement in manufacturing production systems , 1998 .

[81]  V. Sridharan,et al.  The impact of safety stock on schedule instability, cost and service , 1989 .

[82]  Stanley B. Gershwin,et al.  Integrated quality and quantity modeling of a production line , 2005, OR Spectr..

[83]  Mary Jo Maffei,et al.  Dealing with the Uncertainties of Manufacturing: Flexibility, Buffers and Integration , 1993 .

[84]  Sue Abdinnour-Helm,et al.  Pre-implementation attitudes and organizational readiness for implementing an Enterprise Resource Planning system , 2003, Eur. J. Oper. Res..

[85]  Kristin L. Wood,et al.  Computations with Imprecise Parameters in Engineering Design: Background and Theory , 1989 .

[86]  Kenneth F. Alvin,et al.  A New Methodology for the Estimation of Total Uncertainty in Computational Simulation , 1999 .

[87]  Angappa Gunasekaran,et al.  Measuring uncertainties in MRP environments , 2000 .

[88]  J. Deng,et al.  Introduction to Grey system theory , 1989 .

[89]  Chun-Hsiung Lan,et al.  A combinatorial manufacturing resource planning model for long-term CNC machining industry , 2005 .

[90]  Dimitri N. Mavris,et al.  Uncertainty Modeling and Management in Multidisciplinary Analysis and Synthesis , 2000 .

[91]  Allen C. Ward,et al.  Generalizing Interval Matrix Operations for Design , 1997 .

[92]  Markus Biehl,et al.  International supply chain agility ‐ Tradeoffs between flexibility and uncertainty , 2001 .

[93]  Refik Güllü,et al.  Analysis of an inventory system under supply uncertainty , 1999 .

[94]  S. C. L. Koh MRP-controlled batch-manufacturing environment under uncertainty , 2004, J. Oper. Res. Soc..

[95]  Dennis Kira,et al.  A stochastic linear programming approach to hierarchical production planning , 1997 .

[96]  Matthias Mayer,et al.  Improving manufacturing costs and lead times with quality-oriented operating curves , 2001 .

[97]  Raul Poler,et al.  Models for production planning under uncertainty: A review ☆ , 2006 .

[98]  Samar K. Mukhopadhyay,et al.  Joint procurement and production decisions in remanufacturing under quality and demand uncertainty , 2009 .

[99]  Eddie Anderson,et al.  Operations Management—Strategy and Analysis , 1987 .

[100]  Yeou-Koung Tung,et al.  Reliability and Uncertainty Analyses in Hydraulic Design , 1993 .

[101]  Osamu Hori,et al.  Uncertainty model of the gradient constraint and quantitative reliability measures of optical flow , 1999, Systems and Computers in Japan.

[102]  E. Antonsson,et al.  Engineering design calculations with fuzzy parameters , 1992 .

[103]  Shan-Huo Chen,et al.  Optimization of fuzzy production inventory model with unrepairable defective products , 2008 .

[104]  Yakov Ben-Haim,et al.  Robust reliability of structures , 1997 .

[105]  John E. Renaud,et al.  AN INVESTIGATION OF MULTIDISCIPLINARY DESIGN SUBJECT TO UNCERTAINTY , 1998 .

[106]  Hans-Jürgen Zimmermann,et al.  Fuzzy Set Theory - and Its Applications , 1985 .

[107]  Edward C. Sewell,et al.  Heuristic, optimal, static, and dynamic schedules when processing times are uncertain , 1997 .

[108]  Raul Poler Escoto,et al.  Material Requirement Planning with fuzzy constraints and fuzzy coefficients , 2007, Fuzzy Sets Syst..

[109]  Moawia Alghalith,et al.  Production decisions under joint price and production uncertainty , 2009, Eur. J. Oper. Res..

[110]  Chrwan-Jyh Ho,et al.  An investigation of alternative dampening procedures to cope with MRP system nervousness , 1996 .

[111]  Angappa Gunasekaran,et al.  A knowledge management approach for managing uncertainty in manufacturing , 2006, Ind. Manag. Data Syst..

[112]  H. E. Lindberg,et al.  Convex Models for Uncertain Imperfection Control in Multimode Dynamic Buckling , 1992 .