A 2-approximation algorithm for interval data minmax regret sequencing problems with the total flow time criterion
暂无分享,去创建一个
[1] Igor Averbakh,et al. Complexity of minimizing the total flow time with interval data and minmax regret criterion , 2006, Discret. Appl. Math..
[2] A Gerodimos,et al. Robust Discrete Optimization and its Applications , 1996, J. Oper. Res. Soc..
[3] E. Lawler. Sequencing Jobs to Minimize Total Weighted Completion Time Subject to Precedence Constraints , 1978 .
[4] Wayne E. Smith. Various optimizers for single‐stage production , 1956 .
[5] Jan Karel Lenstra,et al. Complexity of Scheduling under Precedence Constraints , 1978, Oper. Res..
[6] Roberto Montemanni,et al. A Mixed Integer Programming Formulation for the Total Flow Time Single Machine Robust Scheduling Problem with Interval Data , 2007, J. Math. Model. Algorithms.
[7] D. Atkin. OR scheduling algorithms. , 2000, Anesthesiology.
[8] Adam Kasperski,et al. An approximation algorithm for interval data minmax regret combinatorial optimization problems , 2006, Inf. Process. Lett..
[9] Panagiotis Kouvelis,et al. Robust scheduling to hedge against processing time uncertainty in single-stage production , 1995 .