CCHP System with Interconnecting Cooling and Heating Network
暂无分享,去创建一个
The consistency between building heating load, cooling load and power load are analyzed in this paper. The problem of energy waste and low equipment usage in a traditional CCHP (combined cooling, heating and power) system with generated electricity not supplied to the grid is analyzed in detail. Further, the new concept of CCHP system with cooling and heating network interconnecting is developed. Then, the Olympic Park energy system is presented to illustrate the advantage and improvement both in economy performance and energy efficiency.
[1] William A. Ryan,et al. Building load profiles and optimal CHP systems , 2002 .
[2] Adwin Martens,et al. The energetic feasibility of CHP compared to the separate production of heat and power , 1998 .
[3] Yi Jiang,et al. Energy utilization evaluation of CCHP systems , 2006 .