Flexibility in a Knowledge-Based System for Solving Dynamic Resource-Constrained Scheduling Problems
暂无分享,去创建一个
[1] Egon Balas,et al. The Shifting Bottleneck Procedure for Job Shop Scheduling , 1988 .
[2] I. Kurtulus,et al. Multi-Project Scheduling: Categorization of Heuristic Rules Performance , 1982 .
[3] E. W. Davis,et al. Multiple Resource–Constrained Scheduling Using Branch and Bound , 1978 .
[4] Herbert A. Simon,et al. The Sciences of the Artificial , 1970 .
[5] Edward W. Davis,et al. Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures , 1973 .
[6] F. F. Boctor,et al. Some efficient multi-heuristic procedures for resource-constrained project scheduling , 1990 .
[7] V. V. S. Sarma,et al. Knowledge-Based Approaches to Scheduling Problems: A Survey , 1991, IEEE Trans. Knowl. Data Eng..
[8] Victor R. Lesser,et al. Unifying Data-Directed and Goal-Directed Control: An Example and Experiments , 1982, AAAI.
[9] J. MacGregor Smith,et al. A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems , 1988 .
[10] Edward W. Davis,et al. A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .
[11] G. Rand. Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .
[12] Robert M. Haralick,et al. Increasing Tree Search Efficiency for Constraint Satisfaction Problems , 1979, Artif. Intell..
[13] Stephen F. Smith,et al. Constructing and Maintaining Detailed Production Plans: Investigations into the Development of Knowledge-Based Factory Scheduling Systems , 1986, AI Mag..
[14] David L. Westbrook,et al. Common Lisp Instrumentation Packag: User Manual , 1994 .
[15] Dennis F. X. Mathaisel,et al. Optimizing Gate Assignments at Airport Terminals , 1985, Transp. Sci..
[16] Edward W. Davis,et al. An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints , 1971 .
[17] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[18] Thomas E. Morton,et al. Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics , 1993 .
[19] Sonya E. Keene,et al. Object-oriented programming in COMMON LISP - a programmer's guide to CLOS , 1989 .
[20] Casimir A. Kulikowski,et al. A Practical Guide to Designing Expert Systems , 1984 .
[21] Will Earhart. In Pittsburgh, PA. , 1929 .
[22] L. Riccio,et al. COMPUTER-GENERATED SYSTEM AIDS AIRLINE'S PASSENGER FLOW AND ROUTING OF AIRCRAFT , 1985 .
[23] Norman Sadeh,et al. Look-ahead techniques for micro-opportunistic job shop scheduling , 1992 .
[24] Rina Dechter,et al. Network-based heuristics for constraint satisfaction problems , 1988 .
[25] Robert J Willis. Critical path analysis and resource constrained project scheduling -- Theory and practice , 1985 .
[26] Salah G. Hamzawi,et al. MANAGEMENT AND PLANNING OF AIRPORT GATE CAPACITY: A MICROCOMPUTER-BASED GATE ASSIGNMENT SIMULATION MODEL , 1986 .
[27] J. Davenport. Editor , 1960 .
[28] Stephen F. Smith,et al. An Integrated Framework for Generating and Revising Factory Schedules , 1990 .
[29] Karl G. Kempf,et al. Complexity, Uncertainty, and Opportunistic Scheduling , 1985, Conference on Artificial Intelligence Applications.
[30] Peter G. Harrison,et al. Functional Programming , 1988 .
[31] Victor Lesser,et al. The Evolution of Blackboard Control Architectures , 1992 .
[32] Marshall C. Pease. ACS.1: An Experimental Automated Command Support System , 1978, IEEE Transactions on Systems, Man, and Cybernetics.
[33] J. M. Tamarit,et al. Project scheduling with resource constraints: A branch and bound approach , 1987 .
[34] Stephen F. Smith,et al. The Use of Multiple Problem Decompositions in Time Constrained Planning Tasks , 1985, IJCAI.
[35] James E. Kelley,et al. Critical-path planning and scheduling , 1899, IRE-AIEE-ACM '59 (Eastern).
[36] Kenneth Steiglitz,et al. Combinatorial Optimization: Algorithms and Complexity , 1981 .
[37] James H. Patterson,et al. A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem , 1984 .
[38] S. S. Panwalkar,et al. A Survey of Scheduling Rules , 1977, Oper. Res..
[39] Stephen C. Graves,et al. A Review of Production Scheduling , 1981, Oper. Res..
[40] Geoffrey D. Gosling,et al. Design of an expert system for aircraft gate assignment , 1990 .
[41] Mark S. Fox,et al. Factory Model and Test Data Descriptions: OPIS Experiments , 1990 .
[42] Victor R. Lesser,et al. The Hearsay-II Speech-Understanding System: Integrating Knowledge to Resolve Uncertainty , 1980, CSUR.
[43] Victor R. Lesser,et al. Exploiting Meta-Level information in a Distributed Scheduling System , 1994, AAAI.
[44] E. L. Lawler,et al. Branch-and-Bound Methods: A Survey , 1966, Oper. Res..
[45] Gilbert Laporte,et al. Annals of Operations Research , 1996 .
[46] Stephen F. Smith,et al. ISIS—a knowledge‐based system for factory scheduling , 1984 .
[47] Stephen F. Smith,et al. Viewing scheduling as an opportunistic problem-solving process , 1988 .
[48] Ronald L. Graham,et al. Performance Guarantees for Scheduling Algorithms , 1978, Oper. Res..
[49] Richard Bellman,et al. Mathematical Aspects Of Scheduling And Applications , 1982 .
[50] M. Held,et al. A dynamic programming approach to sequencing problems , 1962, ACM National Meeting.
[51] P. Strevens. Iii , 1985 .
[52] Richard F. Deckro,et al. A heuristic for multi-project scheduling with limited resources in the housing industry , 1990 .
[53] Kathleen M. Swigger,et al. GATES: an airline gate assignment and tracking expert system , 1988, IEEE Expert.
[54] Stephen F. Smith,et al. Reactive Plan Revision , 1988, AAAI.
[55] Mark Jeffrey Stefik. Planning with constraints , 1980 .
[56] Bradley P. Allen,et al. Job-Shop Scheduling: An Investigation in Constraint-Directed Reasoning , 1982, AAAI.
[57] Stephen F. Smith,et al. Knowledge-based production management approaches, results and prospects , 1992 .
[58] Carlo Vercellis,et al. Hierarchical models for multi-project planning and scheduling , 1993 .
[59] D Mary,et al. C.A.R.P.P.A. MODEL: OPTIMISATION OF AIRCRAFT POSITIONING AND STAFF REGULATION FOR ORLY-WEST AIRPORT , 1986 .
[60] Mark S. Fox,et al. Constraint-Directed Search: A Case Study of Job-Shop Scheduling , 1987 .
[61] Philip M. Wolfe,et al. Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .
[62] Kenneth N. McKay,et al. Job-Shop Scheduling Theory: What Is Relevant? , 1988 .