Automation and Robotisation in Construction and Transition Management

number of problems in the construction industry could be solved with the aid of automation and robotisation technologies. There are indications that automation and robotisation processes are similar to transition processes. Recent years have seen a good deal of research into these kinds of often complex processes and how to manage them. This knowledge may provide the inspiration required to solve the problems in the construction industry through an increase in the exchange of available (tacit) knowledge. This paper looks at this issue at the level of multidisciplinary, collaborative expert designers. II. PROBLEMS The problems today in the building industry are that the client and society do not get the value they want. Clients are users, investors, owners, lessors and producers of real estate objects. Their values are profitability, usability, flexibility and quality. Society wants to save energy and avoid waste and pollution. • Some problems underlying those mentioned above may be: • A lack of specific working methods for expert designers to work with one another and with clients. • A lack of suitable competences of the client and expert designers that enable them to work with one another.

[1]  René Kemp,et al.  Transities & transitiemanagement: De casus van een emissiearme energievoorziening , 2000 .

[2]  Gj Ger Maas,et al.  The influence of automation and robotics on the performance construction , 2005 .

[3]  D. Kolb Experiential Learning: Experience as the Source of Learning and Development , 1983 .

[4]  J. Dewey Experience and Nature , 1960 .

[5]  Stephen Emmitt,et al.  Implementing Value Through Lean Design Management , 2004 .

[6]  Isabelle Reymen,et al.  Improving design processes through structured reflection : a domain-independent approach , 2001 .

[7]  Louis L. Bucciarelli,et al.  Designing Engineers , 1994 .

[8]  Thomas Kvan,et al.  Collaborative design: what is it? , 2000 .

[9]  C. William Harnessing People's Creativity: Ideation and Expression through Visual Communication , 2001 .

[10]  Michael Schrage,et al.  Serious Play: How the World's Best Companies Simulate to Innovate , 1999 .

[11]  G Gebhard Friedl Modellering van het ontwerpproces:een proces-choreografie , 2001 .

[12]  Donald A. Schön Designing as reflective conversation with the materials of a design situation , 1992, Knowl. Based Syst..

[13]  Carlos Balaguer Nowadays Trends in Robotics and Automation in Construction Industry: Transition from Hard to Soft Robotics , 2004 .

[14]  Seymour Papert,et al.  A Critique of Technocentrism in Thinking About the School of the Future , 1988 .

[15]  Yusuke Yamazaki Future Innovative Construction Technologies: Directions and Strategies to Innovate Construction Industry , 2004 .

[16]  Pgs Paul Rutten,et al.  Workshop ontwerpbijeenkomsten bij Heerema , 2004 .

[17]  Petra Badke Schaub,et al.  Strategies of experts in engineering design: between innovation and routine behaviour , 2004 .

[18]  Jean-Bernard Martens Visual interaction : between vision and action , 2005 .

[19]  van Fjm Frans Gassel A method for analyzing mechanized and robotized production processes on the building site , 1995 .