Performance Modeling of Storm Water Best Management Practices with Uncertainty Analysis

The performance of storm water best management practices (BMPs) contains many uncertainties that make predicting BMP performance difficult. The objective of this study is to build a BMP performance model that incorporates uncertainty analysis and to evaluate this model using observed total suspended solids (TSS) from detention basin data sets in the International Stormwater BMP Database. The representative storage-treatment performance model, the k-C* model, was chosen to represent BMP performance. Its input parameters, influent event mean concentration (EMC) (Cin), and the areal removal rate constant (k) are considered with the uncertainty analysis. To estimate the variance associated with k, the prediction interval method is applied to the linear regression equation relating hydraulic loading rate (q) to k. To estimate the variance of Cin, observed Cin data in the BMP database are used. This study assumes that both Cin and k can be represented by lognormal distributions. The probability density function...

[1]  L A Roesner,et al.  A Model for Evaluating Runoff-Quality in Metropolitan Master Planning. , 1974 .

[2]  D. Lettenmaier,et al.  PROBABILISTIC METHODS IN STREAM QUALITY MANAGEMENT , 1975 .

[3]  Wilson H. Tang,et al.  Risk-Safety Factor Relation for Storm Sewer Design , 1976 .

[4]  Larry W. Mays,et al.  Risk models for flood levee design , 1981 .

[5]  J. Neter,et al.  Applied Linear Regression Models , 1983 .

[6]  Larry W. Canter,et al.  Ground Water Pollution Control , 1985 .

[7]  Hans Brix,et al.  WASTEWATER TREATMENT IN CONSTRUCTED REED BEDS IN DENMARK — STATE OF THE ART , 1990 .

[8]  L. Brown,et al.  DO model uncertainty with correlated inputs , 1990 .

[9]  C. S. Melching An improved first-order reliability approach for assessing uncertainties in hydrologic modeling , 1992 .

[10]  C. Melching,et al.  Improved first-order uncertainty method for water-quality modeling , 1992 .

[11]  Yeou-Koung Tung,et al.  UNCERTAINTY AND SENSITIVITY ANALYSES OF PIT-MIGRATION MODEL , 1993 .

[12]  J. Stiffler Reliability estimation , 1996 .

[13]  Ben Urbonas,et al.  Maximized Detention Volume Determined by Runoff Capture Ratio , 1996 .

[14]  W. E. Watt,et al.  Application of the log-normal and normal distributions to stormwater quality parameters , 1997 .

[15]  J. Salas,et al.  Uncertainty analysis of reservoir sedimentation , 1999 .

[16]  Barry J. Adams,et al.  Analysis of detention ponds for storm water quality control , 1999 .

[17]  Robert H. Kadlec,et al.  The inadequacy of first-order treatment wetland models , 2000 .

[18]  Raimund Haberl,et al.  Constructed wetlands for pollution control: Processes, performance, design and operation , 2000 .

[19]  Sherwood C. Reed,et al.  Natural Wastewater Treatment Systems , 2000 .

[20]  Eric Strecker,et al.  DETERMINING URBAN STORM WATER BMP EFFECTIVENESS , 2001 .

[21]  James N. Carleton,et al.  Factors affecting the performance of stormwater treatment wetlands. , 2001, Water Research.

[22]  Willy Bauwens,et al.  UNCERTAINTY IN COUPLED NONPOINT SOURCE AND STREAM WATER-QUALITY MODELS , 2001 .

[23]  B. Braskerud,et al.  Factors affecting phosphorus retention in small constructed wetlands treating agricultural non-point source pollution , 2002 .

[24]  J. Jones,et al.  Developing, evaluating and maintaining a standardized stormwater BMP effectiveness database. , 2002, Water science and technology : a journal of the International Association on Water Pollution Research.

[25]  Ben Urbonas,et al.  Runoff Capture and Delivery Curves for Storm-Water Quality Control Designs , 2002 .

[26]  Tim D. Fletcher,et al.  A model for urban stormwater improvement conceptualisation , 2002 .

[27]  Robert H. Kadlec,et al.  Effects of pollutant speciation in treatment wetlands design , 2003 .

[28]  Adel Shirmohammadi,et al.  Uncertainty Analysis of Hydrologic and Water Quality Predictions for a Small Watershed Using SWAT2000 , 2003 .

[29]  Peter A Vanrolleghem,et al.  Model-based design of horizontal subsurface flow constructed treatment wetlands: a review. , 2004, Water research.

[30]  Kenneth C. Stone,et al.  Marsh-pond-marsh constructed wetland design analysis for swine lagoon wastewater treatment , 2004 .

[31]  Harry X. Zhang,et al.  APPLYING THE FIRST-ORDER ERROR ANALYSIS IN DETERMINING THE MARGIN OF SAFETY FOR TOTAL MAXIMUM DAILY LOAD COMPUTATIONS , 2004 .

[32]  Michael E. Barrett Retention Pond Performance: Examples from the International Stormwater BMP Database , 2004 .

[33]  Eric Strecker,et al.  Analyses of the Expanded EPA/ASCE International BMP Database and Potential Implications for BMP Design , 2004 .

[34]  Yeou-Koung Tung,et al.  Hydrosystems Engineering Uncertainty Analysis , 2005 .

[35]  Ying‐Feng Lin,et al.  Performance of a constructed wetland treating intensive shrimp aquaculture wastewater under high hydraulic loading rate. , 2005, Environmental pollution.

[36]  Michael E Barrett,et al.  Performance Comparison of Structural Stormwater Best Management Practices , 2005, Water environment research : a research publication of the Water Environment Federation.

[37]  James P. Heaney,et al.  Long-Term Performance Modeling of Vegetative/Infiltration BMPs for Highways , 2005 .

[38]  Tim D. Fletcher,et al.  Modelling urban stormwater treatment—A unified approach , 2006 .

[39]  Harald Kunstmann,et al.  Direct propagation of probability density functions in hydrological equations , 2006 .

[40]  Indrajeet Chaubey,et al.  UNCERTAINTY IN TMDL MODELS , 2006 .

[41]  Larry A. Roesner,et al.  Improved Protocol for Classification and Analysis of Stormwater-Borne Solids , 2008 .