Application of real-time simulation to assign due dates on logistic-manufacturing networks

This paper presents the application of real-time simulation to assign due dates on logistic-manufacturing networks. Information from the manufacturing, transportation, and supplier elements was integrated into a simulation model of the system to help the assignment of reliable delivery dates. In addition, the system was used to generate multiple due date options so customers could pick the delivery speed and cost option that satisfied their specific needs.

[1]  Matthew W. Rohrer Seeing is believing: the importance of visualization in manufacturing simulation , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).

[2]  Catherine M. Harmonosky,et al.  Implementation issues using simulation for real-time scheduling, control, and monitoring , 1990, 1990 Winter Simulation Conference Proceedings.

[3]  Randall P. Sadowski,et al.  A simulation-based backward planning approach for order-release , 1997, WSC '97.

[4]  林岡源 Business Logistics Management , 1975 .

[5]  Paul R. Murphy,et al.  INTERNATIONAL FREIGHT FORWARDER PERSPECTIVES ON ELECTRONIC DATA INTERCHANGE AND INFORMATION MANAGEMENT ISSUES. , 1996 .

[6]  T.C.E. Cheng,et al.  Survey of scheduling research involving due date determination decisions , 1989 .

[7]  Deborah J. Medeiros,et al.  Real-time simulation for decision support in continuous flow manufacturing systems , 1992, WSC '92.

[8]  Feng-Chang R. Chang A study of due-date assignment rules with constrained tightness in a dynamic job shop , 1996 .

[9]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[10]  Ari-Pekka Hameri,et al.  Multidimensional simulation as a tool for strategic logistics planning , 1995 .

[11]  Paul Rogers,et al.  Simulation for real-time decision making in manufacturing systems , 1993, WSC '93.

[12]  R.P. Sadowski,et al.  A Simulation-based Backward Planning Approach For Order-release , 1997, Winter Simulation Conference Proceedings,.

[13]  Timothy D. Fry,et al.  Due Date Assignment in a Multistage Job Shop , 1989 .

[14]  I. Lewis,et al.  LOGISTICS AND INFORMATION TECHNOLOGY: A COORDINATION PERSPECTIVE. , 1997 .