Automated stepper load balance allocation system

In order to improve productivity in the photolithography process of high-product mix/low-volume factories, an automated stepper load balance allocation system was developed. The system enables us to maintain a balanced load distribution of tool constraint layers among all steppers. We developed a processing time estimation function and a load balance allocation function. The processing time estimation function calculates accurate loads based on the processing times related to the product, the process layer, and the stepper. The load balance allocation function was realized by applying a dynamic programming method. The system has decreased the deviation in the total processing time among all steppers by 10%, compared to the conventional manual allocation method.

[1]  David D. Yao,et al.  Scheduling semiconductor lines using a fluid network model , 1994, IEEE Trans. Robotics Autom..

[2]  T. Nakata,et al.  Dynamic bottleneck control in wide variety production factory , 1999 .

[3]  K. Appleton-Day,et al.  Real time dispatch gets real time results , 1997, 1997 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat. No.97CH36023).

[4]  E. Akcali,et al.  A sequential solution methodology for capacity allocation and lot scheduling problems for photolithography , 2000, Twenty Sixth IEEE/CPMT International Electronics Manufacturing Technology Symposium (Cat. No.00CH37146).

[5]  J. P. Ignizio Optimal factory tool portfolios , 2003 .

[6]  Shi-Chung Chang,et al.  Daily scheduling for R&D semiconductor fabrication , 1993, [1993] Proceedings IEEE International Conference on Robotics and Automation.

[7]  John W. Fowler,et al.  Measurable improvements in cycle-time-constrained capacity , 1997, 1997 IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings (Cat. No.97CH36023).