Measuring Imputed Cost in the Semiconductor Equipment Supply Chain

We consider the order-fulfillment process of a supplier producing a customized capital good, such as production equipment, commercial aircraft, medical devices, or defense systems. As is common in these industries, prior to receiving a firm purchase order from the customer, the supplier receives a series of shared forecasts, which are called "soft orders." Facing a stochastic internal manufacturing lead time, the supplier must decide at what time to begin the fulfillment of the order. This decision requires a trade-off between starting too early, leading to potential holding or cancellation costs, and starting too late, leading to potential delay costs. We collect detailed data of shared forecasts, actual purchase orders, production lead times, and delivery dates for a supplier-buyer dyad in the semiconductor equipment supply chain. Under the assumption that the supplier acts rationally, optimally balancing the cancellation, holding, and delay costs, we are able to estimate the corresponding imputed cost parameters based on the observed data. Our estimation results reveal that the supplier perceives the cost of cancellation to be about two times higher and the holding costs to be about three times higher than the delay cost. In other words, the supplier is very conservative when commencing the order fulfillment, which undermines the effectiveness of the overall forecast-sharing mechanism.

[1]  Christoph H. Loch,et al.  Exchanging Preliminary Information in Concurrent Engineering: Alternative Coordination Strategies , 2002, Organ. Sci..

[2]  Allan H. Meltzer,et al.  The Phillips curve and labor markets , 1976 .

[3]  Gérard P. Cachon,et al.  Contracting to Assure Supply: How to Share Demand Forecasts in a Supply Chain , 2001, Manag. Sci..

[4]  Christoph H. Loch,et al.  Communication and Uncertainty in Concurrent Engineering , 1998 .

[5]  Steven D. Eppinger,et al.  A Model-Based Framework to Overlap Product Development Activities , 1997 .

[6]  A LariviereMartin,et al.  Selling to the Newsvendor , 2001 .

[7]  Fangruo Chen,et al.  Information Sharing and Supply Chain Coordination , 2003, Supply Chain Management.

[8]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[9]  Vineet Padmanabhan,et al.  Comments on "Information Distortion in a Supply Chain: The Bullwhip Effect" , 1997, Manag. Sci..

[10]  R. Lucas Econometric policy evaluation: A critique , 1976 .

[11]  Vineet Padmanabhan,et al.  Slotting Allowances and New Product Introductions , 1997 .

[12]  Fangruo Chen,et al.  Salesforce Incentives, Market Information, and Production/Inventory Planning , 2005, Manag. Sci..

[13]  Izak Duenyas,et al.  Single facility due date setting with multiple customer classes , 1995 .

[14]  Paul H. Zipkin,et al.  Customer-order information, leadtimes, and inventories , 1995 .

[15]  Christopher S. Tang,et al.  Designing Supply Contracts: Contract Type and Information Asymmetry , 2004, Manag. Sci..

[16]  Charles J. Corbett,et al.  Stochastic Inventory Systems in a Supply Chain with Asymmetric Information: Cycle Stocks, Safety Stocks, and Consignment Stock , 2001, Oper. Res..

[17]  Teck-Hua Ho,et al.  New product development: the performance and time-to-market tradeoff , 1996 .

[18]  Fangruo Chen,et al.  Market Segmentation, Advanced Demand Information, and Supply Chain Performance , 2000, Manuf. Serv. Oper. Manag..

[19]  Kevin M. Murphy,et al.  Estimation and Inference in Two-Step Econometric Models , 1985 .

[20]  Preyas S. Desai,et al.  Demand signalling under unobservable effort in franchising: linear and nonlinear price contracts , 1995 .

[21]  Wujin Chu,et al.  Demand Signalling and Screening in Channels of Distribution , 1992 .

[22]  Özalp Özer,et al.  Integrating Replenishment Decisions with Advance Demand Information , 2001, Manag. Sci..