Effects of the preventive and corrective adjustments in economical designs for online process control for attributes with misclassification errors

The procedure for online process control by attributes consists of inspecting a single item at every m produced items. It is decided on the basis of the inspection result whether the process is in-control (the conforming fraction is stable) or out-of-control (the conforming fraction is decreased, for example). Most articles about online process control have cited the stoppage of the production process for an adjustment when the inspected item is non-conforming (then the production is restarted in-control, here denominated as corrective adjustment). Moreover, the articles related to this subject do not present semi-economical designs (which may yield high quantities of non-conforming items), as they do not include a policy of preventive adjustments (in such case no item is inspected), which can be more economical, mainly if the inspected item can be misclassified. In this article, the possibility of preventive or corrective adjustments in the process is decided at every m produced item. If a preventive adjustment is decided upon, then no item is inspected. On the contrary, the m-th item is inspected; if it conforms, the production goes on, otherwise, an adjustment takes place and the process restarts in-control. This approach is economically feasible for some practical situations and the parameters of the proposed procedure are determined minimizing an average cost function subject to some statistical restrictions (for example, to assure a minimal level—fixed in advance—of conforming items in the production process). Numerical examples illustrate the proposal.

[1]  S. N. Nandi,et al.  Some improvements in taguchi's economic method allowing continued quality deterioration in production process , 1999 .

[2]  A. W. Kemp,et al.  Univariate Discrete Distributions , 1993 .

[3]  Herbert Moskowitz,et al.  Joint economic design of EWMA control charts for mean and variance , 2008, Eur. J. Oper. Res..

[4]  Shey-Huei Sheu,et al.  Determining the optimal production-maintenance policy with inspection errors: using a Markov chain , 2003, Comput. Oper. Res..

[5]  J. Davis Univariate Discrete Distributions , 2006 .

[6]  Tirthankar Dasgupta,et al.  An economic inspection interval for control of defective items in a hot rolling mill , 2003 .

[7]  M. A. Rahim,et al.  Economic statistical design of X control charts for systems with gamma(λ, 2) in-control times , 2002 .

[8]  Wei Jiang,et al.  An economic model for integrated APC and SPC control charts , 2000 .

[9]  Antonio Fernando Branco Costa,et al.  Economic design of X charts with variable parameters: The Markov chain approach , 2001 .

[10]  Linda Lee Ho,et al.  An alternative model for on-line quality monitoring for variables , 2007 .

[11]  Min Xie,et al.  Statistical Models and Control Charts for High-Quality Processes , 2002 .

[12]  T. McWilliams Economic Control Chart Designs and the In-Control Time Distribution: A Sensitivity Study , 1989 .

[13]  M. A. Rahim,et al.  Economic statistical design of x ¥ control charts for systems with gamma ( 5 ,2) in-control times , 2003 .

[14]  Abhyuday Mandal,et al.  Estimation of Process Parameters to Determine the Optimum Diagnosis Interval for Control of Defective Items , 2008, Technometrics.

[15]  Linda Lee Ho,et al.  An analysis of Taguchi's on-line quality monitoring procedure for attributes with diagnosis errors , 2001 .

[16]  Zhang Wu,et al.  Optimization design of control charts based on Taguchi's loss function and random process shifts , 2004 .

[17]  John H. Sheesley,et al.  Quality Engineering in Production Systems , 1988 .

[18]  K. Govindaraju,et al.  Inspection Error Adjustment in the Design of Single Sampling Attributes Plan , 2007 .

[19]  W. Woodall,et al.  An analysis of Taguchi's on-line quality-monitoring procedures for attributes , 1993 .

[20]  Fred Spiring,et al.  Introduction to Statistical Quality Control , 2007, Technometrics.

[21]  J. Douglas Barrett,et al.  Taguchi's Quality Engineering Handbook , 2007, Technometrics.

[22]  Roberto da Costa Quinino,et al.  Monitoring process for attributes with quality deterioration and diagnosis errors , 2007 .

[23]  Thong Ngee Goh,et al.  Economic design of cumulative count of conforming charts under inspection by samples , 2008 .

[24]  Chih-Hsiung Wang Economic off-line quality control strategy with two types of inspection errors , 2007, Eur. J. Oper. Res..

[25]  Jie Ding,et al.  The effect of testing equipment shift on optimal decisions in a repetitive testing process , 2008, Eur. J. Oper. Res..