Reducing Requirement Incorrectness and Coping with Its Negative Impact in Information System Development Projects
暂无分享,去创建一个
Jack Shih-Chieh Hsu | Tung-Ching Lin | Kuang-Ting Cheng | Lars P. Linden | J. Hsu | Tung-Ching Lin | Kuang-Ting Cheng
[1] Roland T. Mittermeir,et al. Alternatives to Overcome the Communications Problem of Formal Requirements Analysis. , 1982 .
[2] C. Fornell,et al. Evaluating structural equation models with unobservable variables and measurement error. , 1981 .
[3] William L. Fuerst,et al. Information technology and sustained competitive advantage: a resource-based analysis , 1995 .
[4] Jack Shih-Chieh Hsu,et al. The impacts of user review on software responsiveness: Moderating requirements uncertainty , 2008, Inf. Manag..
[5] Larry E. Toothaker,et al. Multiple Regression: Testing and Interpreting Interactions , 1991 .
[6] Eileen M. Trauth,et al. Critical Skills and Knowledge Requirements of IS Professionals: A Joint Academic/Industry Investigation , 1995, MIS Q..
[7] Kalle Lyytinen,et al. Identifying Software Project Risks: An International Delphi Study , 2001, J. Manag. Inf. Syst..
[8] Robert P. Bostrom,et al. Successful application of communication techniques to improve the systems development process , 1989, Inf. Manag..
[9] L. Sproull,et al. Coordinating Expertise in Software Development Teams , 2000 .
[10] H. Holbrook,et al. A scenario-based methodology for conducting requirements elicitation , 1990, SOEN.
[11] Howard B. Lee,et al. Foundations of Behavioral Research , 1973 .
[12] Gary Klein,et al. User and developer common knowledge: Effect on the success of information system development projects , 2009 .
[13] Jacob Cohen,et al. Applied multiple regression/correlation analysis for the behavioral sciences , 1979 .
[14] Jay R. Galbraith. Designing Complex Organizations , 1973 .
[15] Dale Goodhue,et al. Develop Long-Term Competitiveness through IT Assets , 1996 .
[16] Albert L. Lederer,et al. Nine management guidelines for better cost estimating , 1992, CACM.
[17] Blaize Horner Reich,et al. A Temporal Model of Information Technology Project Performance , 2007, J. Manag. Inf. Syst..
[18] Gordon B. Davis,et al. Strategies for Information Requirements Determination , 1982, IBM Syst. J..
[19] Kalle Lyytinen,et al. Information systems failures—a survey and classification of the empirical literature , 1988 .
[20] Tuure Tuunanen,et al. A Contigency Model for Requirements Development , 2007, J. Assoc. Inf. Syst..
[21] David Chenho Kung,et al. Formal approach to scenario analysis , 1994, IEEE Software.
[22] Sun-Jen Huang,et al. An empirical analysis of risk components and performance on software projects , 2007, J. Syst. Softw..
[23] Suzanne Rivard,et al. An Integrative Contingency Model of Software Project Risk Management , 2001, J. Manag. Inf. Syst..
[24] Lior Fink,et al. Exploring the perceived business value of the flexibility enabled by information technology infrastructure , 2009, Inf. Manag..
[25] Barry W. Boehm,et al. Software Engineering Economics , 1993, IEEE Transactions on Software Engineering.
[26] Gruia-Catalin Roman,et al. A taxonomy of current issues in requirements engineering , 1985, Computer.
[27] Daniel Robey,et al. A Social Process Model of User-Analyst Relationships , 1992, MIS Q..
[28] Izak Benbasat,et al. Business Competence of Information Technology Professionals: Conceptual Development and Influence on IT-Business Partnerships , 2004, MIS Q..
[29] Alistair G. Sutcliffe,et al. Experience with SCRAM, a SCenario Requirements Analysis Method , 1998, Proceedings of IEEE International Symposium on Requirements Engineering: RE '98.
[30] Sarma R. Nidumolu. The Effect of Coordination and Uncertainty on Software Project Performance: Residual Performance Risk as an Intervening Variable , 1995, Inf. Syst. Res..
[31] Suzanne Robertson,et al. Mastering the Requirements Process , 1999 .
[32] Kate M. Kaiser,et al. Evolution of Offshore Software Development: From Outsourcing to Cosourcing , 2004, MIS Q. Executive.
[33] KeilMark,et al. Software project risks and their effect on outcomes , 2004 .
[34] Charles E. Downing,et al. Uncertainty Reduction Approaches, Uncertainty Coping Approaches, and Process Performance in Financial Services , 2006, Decis. Sci..
[35] Qing Hu,et al. Assimilation of Enterprise Systems: The Effect of Institutional Pressures and the Mediating Role of Top Management , 2007, MIS Q..
[36] M. Hoegl,et al. Teamwork Quality and the Success of Innovative Projects , 2001 .
[37] Capers Jones,et al. Assessment and control of software risks , 1994, Yourdon Press Computing Series.
[38] Richard L. Daft,et al. Organizational information requirements, media richness and structural design , 1986 .
[39] Kalle Lyytinen,et al. A framework for identifying software project risks , 1998, CACM.
[40] L. J. Williams,et al. Recent Advances in Causal Modeling Methods for Organizational and Management Research , 2003 .
[41] Ephraim R. McLean,et al. Expertise Integration and Creativity in Information Systems Development , 2005, J. Manag. Inf. Syst..
[42] Patricia J. Guinan,et al. Enabling Software Development Team Performance During Requirements Definition: A Behavioral Versus Technical Approach , 1998, Inf. Syst. Res..
[43] Richard P. Bagozzi,et al. Assessing Construct Validity in Organizational Research , 1991 .
[44] Amrit Tiwana,et al. Information Systems Project Continuation in Escalation Situations: A Real Options Model , 2006, Decis. Sci..
[45] Sarma R. Nidumolu. A Comparison of the Structural Contingency and Risk-Based Perspectives on Coordination in Software Development Projects , 1996, J. Manag. Inf. Syst..
[46] F. W. McFarlan,et al. Portfolio approach to information systems , 1989 .
[47] Gordon W. Cheung,et al. Evaluating Goodness-of-Fit Indexes for Testing Measurement Invariance , 2002 .
[48] Alan M. Davis,et al. A Unified Model of Requirements Elicitation , 2004, J. Manag. Inf. Syst..
[49] Judy E. Scott,et al. Relational Alignment in Offshore IS Outsourcing , 2009, MIS Q. Executive.
[50] Denise Silver,et al. Joint Application Development , 1995 .
[51] D. Campbell,et al. Convergent and discriminant validation by the multitrait-multimethod matrix. , 1959, Psychological bulletin.
[52] Elena Karahanna,et al. Antecedents of IS Strategic Alignment: A Nomological Network , 2009, Inf. Syst. Res..
[53] Mary C. Jones,et al. IS project team performance: An empirical assessment , 1996, Inf. Manag..
[54] Mark Keil,et al. How Software Project Risk Affects Project Performance: An Investigation of the Dimensions of Risk and an Exploratory Model , 2004, Decis. Sci..
[55] Kalle Lyytinen,et al. Components of Software Development Risk: How to Address Them? A Project Manager Survey , 2000, IEEE Trans. Software Eng..
[56] Scott B. MacKenzie,et al. Common method biases in behavioral research: a critical review of the literature and recommended remedies. , 2003, The Journal of applied psychology.
[57] Franz Lehner,et al. Requirements Engineering as a Success Factor in Software Projects , 2001, IEEE Softw..
[58] Richard E. Fairley,et al. Risk management for software projects , 1994, IEEE Software.
[59] Thiagarajan Ravichandran,et al. Quality Management in Systems Development: An Organizational System Perspective , 2000, MIS Q..
[60] E. Burton Swanson,et al. Management information requirements assessment: the state of the art , 1979, DATB.
[61] Nirup M. Menon,et al. Managing Technology and Administration Innovations: Four Case Studies on Software Reuse , 2004, J. Assoc. Inf. Syst..
[62] Milton Harris,et al. Organization Design , 2000, Manag. Sci..
[63] Paul A. Pavlou,et al. Psychological Contract Violation in Online Marketplaces: Antecedents, Consequences, and Moderating Role , 2005, Inf. Syst. Res..
[64] Andrew P. Sage,et al. Handbook of Systems Engineering and Management , 2011 .
[65] Robert W. Zmud,et al. A Synthesis of Research on Requirements Analysis and Knowledge Acquisition Techniques , 1992, MIS Q..
[66] K. Weick. The social psychology of organizing , 1969 .
[67] B. Boehm. Software risk management: principles and practices , 1991, IEEE Software.
[68] J. C. Henderson,et al. Managing I/S Design Teams: A Control Theories Perspective , 1992 .
[69] Amrit Tiwana,et al. Governance-Knowledge Fit in Systems Development Projects , 2009, Inf. Syst. Res..
[70] Ian Sommerville,et al. Requirements Engineering: Processes and Techniques , 1998 .
[71] Kathy Schwalbe,et al. Information Technology Project Management , 1999 .
[72] Bill Curtis,et al. A field study of the software design process for large systems , 1988, CACM.
[73] Mark Keil,et al. Software project risks and their effect on outcomes , 2004, CACM.