Distributed Manufacturing Scheduling Using Intelligent Agents

Manufacturing scheduling is an optimization process that allocates limited manufacturing resources over time among parallel and sequential manufacturing activities. This allocation must obey a set of rules or constraints that reflect the temporal relationships between manufacturing activities and the capacity limitations of a set of shared resources. The allocation also affects a schedule's optimality with respect to criteria such as cost, lateness, or throughput. The globalization of manufacturing makes such optimization increasingly important. To survive in this competitive market, manufacturing enterprises must increase their productivity and profitability through greater shop floor agility. Agent-based manufacturing scheduling systems are a promising way to provide this optimization.

[1]  James J. Solberg,et al.  INTEGRATED SHOP FLOOR CONTROL USING AUTONOMOUS AGENTS , 1992 .

[2]  Norman M. Sadeh,et al.  Resource allocation in distributed factory scheduling , 1991, IEEE Expert.

[3]  Kazuo Miyashita,et al.  CAMPS: a constraint-based architecturefor multiagent planning and scheduling , 1998, J. Intell. Manuf..

[4]  Carlos Ramos,et al.  A dynamic scheduling holon for manufacturing orders , 1998, J. Intell. Manuf..

[5]  Reid G. Smith,et al.  The Contract Net Protocol: High-Level Communication and Control in a Distributed Problem Solver , 1980, IEEE Transactions on Computers.

[6]  K. Ghedira,et al.  How To Schedule A Flow Shop Plant By Agents , 1970 .

[7]  H. V. Parunak Chapter 10 – Manufacturing Experience with the Contract Net , 1987 .

[8]  H. Van Dyke Parunak,et al.  The AARIA agent architecture: an example of requirements-driven agent-based system design , 1997, AGENTS '97.

[9]  Albert D. Baker,et al.  Manufacturing control with a market-driven contract net , 1992 .

[10]  Alan H. Bond,et al.  Distributed Artificial Intelligence , 1988 .

[11]  Weiming Shen,et al.  MetaMorph II: an agent-based architecture for distributed intelligent design and manufacturing , 2000, J. Intell. Manuf..

[12]  Katia P. Sycara,et al.  Exploiting Problem Structure for Distributed Constraint Optimization , 1995, ICMAS.

[13]  Patrick Prosser,et al.  A distributed asynchronous system for predictive and reactive scheduling , 1991, Artif. Intell. Eng..

[14]  Michael Jeng-Ping Shaw Distributed Planning In Cellular Flexible Manufacturing Systems , 1987 .

[15]  Weiming Shen,et al.  Multi-Agent Systems for Concurrent Intelligent Design and Manufacturing , 2000 .

[16]  Bo Wu,et al.  Application of decentralized cooperative problem solving in dynamic flexible scheduling , 1995, Other Conferences.

[17]  Khalid Kouiss,et al.  Using multi-agent architecture in FMS for dynamic scheduling , 1997, J. Intell. Manuf..