Sequencing problem for a mixed-model assembly line in the Toyota production system
暂无分享,去创建一个
T. Ito | K. Ohno | S. Kotani * | K. Ohno | T. Ito | S. Kotani *
[1] S. Spear,et al. Decoding the DNA of the Toyota Production System , 1999 .
[2] Katsuhisa Ohno,et al. A sequencing problem for a mixed-model assembly line in a JIT production system , 1994 .
[3] Katsuhisa Ohno,et al. Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages , 2000, Eur. J. Oper. Res..
[4] W. Kubiak. Minimizing variation of production rates in just-in-time systems: A survey☆ , 1993 .
[5] Avraham Shtub,et al. SEQUENCING MIXED-MODEL ASSEMBLY LINES TO LEVEL PARTS USAGE AND MINIMIZE LINE LENGTH , 1994 .
[6] Antonio Costa,et al. Human factor policy testing in the sequencing of manual mixed model assembly lines , 2004, Comput. Oper. Res..
[7] John B. Kidd,et al. Toyota Production System , 1993 .
[8] Katsuhisa Ohno,et al. Algorithms for sequencing mixed models on an assembly line in a JIT production system , 1997 .
[9] L. Tsai. Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage , 1995 .
[10] J. Miltenberg,et al. Level schedules for mixed-model assembly lines in just-in-time production systems , 1989 .
[11] Candace Arai Yano,et al. Sequencing to minimize work overload in assembly lines with product options , 1991 .
[12] John Miltenburg,et al. Scheduling mixed-model multi-level just-in-time production systems , 1989 .