Continuous precise workload control method

The diversity of requirements and the frequency of change in the market can only be competed with dynamicity and responsiveness in both production and planning systems. In this sense, working principles of a novel workload control method, called continuous precise workload control are presented in this paper. The implementation of the method is based on a multi-agent based architecture. The presented approach generates dynamic non periodic release decisions exploiting real time shop floor information. The performance of the system and correlation of norm value against the assessment range are investigated through an experimented test case.

[1]  Cristovao Silva,et al.  Three decades of workload control research: a systematic review of the literature , 2011 .

[2]  Mauro Onori,et al.  Evolvable Assembly Systems : A New Paradigm? , 2002 .

[3]  Wolfgang Bechte Theory and practice of load-oriented manufacturing control , 1988 .

[4]  Lawrence D. Fredendall,et al.  Concerning the theory of workload control , 2010, Eur. J. Oper. Res..

[5]  F. Jovane,et al.  Reconfigurable Manufacturing Systems , 1999 .

[6]  Hoda A. ElMaraghy,et al.  Flexible and reconfigurable manufacturing systems paradigms , 2005 .

[7]  Hakan Akillioglu,et al.  Evolvable Production Systems: Demand Responsive Planning , 2011 .

[8]  Mauro Onori,et al.  Demand responsive planning: workload control implementation , 2013 .

[9]  Martin Land,et al.  Parameters and sensitivity in workload control , 2006 .

[10]  Mauro Onori,et al.  The IDEAS project: plug & produce at shop‐floor level , 2012 .

[11]  Cristovao Silva,et al.  Theoretical development of a workload control methodology: evidence from two case studies , 2008 .

[12]  Peter Nyhuis,et al.  The workload control concept: theory and practical extensions of Load Oriented Order Release , 2002 .

[13]  Mauro Onori,et al.  Evolvable production systems and impacts on production planning , 2011, 2011 IEEE International Symposium on Assembly and Manufacturing (ISAM).

[14]  B. Kingsman,et al.  Production planning systems and their applicability to make-to-order companies , 1989 .

[15]  G. Gaalman,et al.  The influence of shop characteristics on workload control , 2000 .

[16]  Hans-Peter Wiendahl,et al.  Load-Oriented Manufacturing Control , 1994 .

[17]  Martin Land,et al.  Workload control concepts in job shops A critical assessment , 1995 .

[18]  Mauro Onori,et al.  Evolvable Assembly Systems: Mechatronic Architecture Implications and Future Research , 2010 .

[19]  Nuno O. Fernandes,et al.  Workload control under continuous order release , 2011 .

[20]  Luc Bongaerts,et al.  Holonic manufacturing systems , 1997 .

[21]  Gerard Gaalman,et al.  Towards simple and robust workload norms , 1996 .

[22]  R. Cigolini,et al.  An experimental investigation on workload limiting methods within ORR policies in a job shop environment , 2002 .

[23]  Peter Nyhuis,et al.  Changeable Manufacturing - Classification, Design and Operation , 2007 .