An iterative approach for reducing the impact of infrastructure maintenance on the performance of railway systems
暂无分享,去创建一个
[1] Dirk Cattrysse,et al. Expected Passenger Travel Time for Train Schedule Evaluation and Optimization , 2013 .
[2] Matthias Ehrgott,et al. A set packing inspired method for real-time junction train routing , 2013, Comput. Oper. Res..
[3] Leo G. Kroon,et al. A rolling horizon approach for disruption management of railway rolling stock , 2012, Eur. J. Oper. Res..
[4] Sara Gestrelius,et al. Maintaining tracks and traffic flow at the same time , 2013, J. Rail Transp. Plan. Manag..
[5] Dominique Feillet,et al. A MIP-based local search method for the railway rescheduling problem , 2011, Networks.
[6] Dario Pacciarelli,et al. Optimal inter-area coordination of train rescheduling decisions , 2011 .
[7] Francesco Corman,et al. Rescheduling models for railway traffic management in large-scale networks , 2013, Public Transport.
[8] Dennis Huisman,et al. Delay Management with Rerouting of Passengers , 2012, Transp. Sci..
[9] Peter Pudney,et al. Generating Train Plans with Problem Space Search , 2008 .
[10] Dominique Feillet,et al. SAPI: Statistical Analysis of Propagation of Incidents. A new approach for rescheduling trains after disruptions , 2011, Eur. J. Oper. Res..
[11] Amie R. Albrecht,et al. Rescheduling rail networks with maintenance disruptions using Problem Space Search , 2013, Comput. Oper. Res..
[12] Dario Pacciarelli,et al. Optimal multi-class rescheduling of railway traffic , 2011, J. Rail Transp. Plan. Manag..
[13] Dario Pacciarelli,et al. Assessment of flexible timetables in real-time traffic management of a railway bottleneck , 2008 .
[14] Paolo Toth,et al. Solution of the Train Platforming Problem , 2011, Transp. Sci..
[15] Dario Pacciarelli,et al. A tabu search algorithm for rerouting trains during rail operations , 2007 .
[16] Leo G. Kroon,et al. Railway Rolling Stock Planning: Robustness Against Large Disruptions , 2012, Transp. Sci..
[17] Dennis Huisman,et al. Optimisation Models for Railway Timetabling , 2014 .
[18] Thomas Herrmann,et al. Finding Delay-Tolerant Train Routings through Stations , 2004, OR.
[19] Malachy Carey,et al. Scheduling Trains on a Network of Busy Complex Stations , 2007 .
[20] Dennis Huisman,et al. Fast heuristics for delay management with passenger rerouting , 2011, Public Transp..
[21] Rommert Dekker,et al. Stochastic Improvement of Cyclic Railway Timetables , 2006 .
[22] Carlo Mannino,et al. Optimal Real-Time Traffic Control in Metro Stations , 2009, Oper. Res..
[23] Matthias Ehrgott,et al. Railway track allocation: models and methods , 2011, OR Spectr..
[24] P. Mackie,et al. THE VALUE OF TRAVEL TIME SAVINGS IN EVALUATION , 2001 .
[25] Marco Laumanns,et al. A model predictive control approach for discrete-time rescheduling in complex central railway station areas , 2012, Comput. Oper. Res..
[26] Seyed Jafar Sadjadi,et al. Robust Train Timetabling Problem: Mathematical Model and Branch and Bound Algorithm , 2012, IEEE Transactions on Intelligent Transportation Systems.
[27] Erhan Kozan,et al. Determining operations affected by delay in predictive train timetables , 2014, Comput. Oper. Res..
[28] Miguel A. Salido,et al. Robustness for a single railway line: Analytical and simulation methods , 2012, Expert Syst. Appl..
[29] Leo G. Kroon,et al. Routing Trains Through Railway Stations: Model Formulation and Algorithms , 1996, Transp. Sci..
[30] Paolo Toth,et al. Chapter 3 Passenger Railway Optimization , 2007, Transportation.
[31] Rob M.P. Goverde,et al. Synchronization Control of Scheduled Train Services to Minimize Passenger Waiting Times , 1998 .
[32] Mark Wardman,et al. Public transport values of time , 2004 .
[33] Dirk Cattrysse,et al. Improving the robustness in railway station areas , 2014, Eur. J. Oper. Res..
[34] Dirk Cattrysse,et al. Robust railway station planning: An interaction between routing, timetabling and platforming , 2013, J. Rail Transp. Plan. Manag..
[35] Leo G. Kroon,et al. Reliability and Heterogeneity of Railway Services , 2006, Eur. J. Oper. Res..
[36] Pieter Vansteenwegen,et al. Decreasing the passenger waiting time for an intercity rail network , 2007 .
[37] Xuesong Zhou,et al. Robust single-track train dispatching model under a dynamic and stochastic environment: a scenario-based rolling horizon solution approach , 2011 .
[38] Francesco Corman,et al. Evaluating Disturbance Robustness of Railway Schedules , 2014, J. Intell. Transp. Syst..
[39] Paolo Toth,et al. Nominal and robust train timetabling problems , 2012, Eur. J. Oper. Res..
[40] El-Houssaine Aghezzaf,et al. Defining robustness of a railway timetable , 2011 .
[41] David Canca,et al. Optimal Train Reallocation Strategies under Service Disruptions , 2012 .
[42] Dirk Cattrysse,et al. Deriving all Passenger Flows in a Railway Network from Ticket Sales Data , 2011 .
[43] Lucas P. Veelenturf,et al. A Railway Timetable Rescheduling Approach for Handling Large-Scale Disruptions , 2014, Transp. Sci..
[44] Chikara Hirai,et al. Evaluation Method of Robustness for Train Schedules , 2007 .
[45] Dick den Hertog,et al. The Netherlands Schedules Track Maintenance to Improve Track Workers' Safety , 2007, Interfaces.
[46] Igor Vasil'ev,et al. The dispatching problem on multitrack territories: Heuristic approaches based on mixed integer linear programming , 2013, Networks.
[47] Erhan Kozan,et al. Techniques for inserting additional trains into existing timetables , 2009 .
[48] Peter Brucker,et al. Scheduling railway traffic at a construction site , 2002 .
[49] Dirk Van Oudheusden,et al. Developing railway timetables which guarantee a better service , 2004, Eur. J. Oper. Res..
[50] J. Bates,et al. The valuation of reliability for personal travel , 2001 .
[51] Piet Rietveld,et al. A Meta-Analysis of Valuation of Travel Time reliability , 2005 .
[52] Luis Cadarso,et al. Recovery of disruptions in rapid transit networks , 2013 .
[53] Jan A. Persson,et al. N-tracked railway traffic re-scheduling during disturbances , 2007 .
[54] Anita Schöbel,et al. A Bicriteria Approach for Robust Timetabling , 2009, Robust and Online Large-Scale Optimization.
[55] Dirk Cattrysse,et al. The train platforming problem: The infrastructure management company perspective , 2014 .
[56] Dennis Huisman,et al. Adjusting a railway timetable in case of partial or complete blockades , 2012, Eur. J. Oper. Res..