A mathematical model on EPQ for stochastic demand in an imperfect production system
暂无分享,去创建一个
[1] Sheng-Tsaing Tseng,et al. Optimal production run length for products sold with warranty , 2000, Eur. J. Oper. Res..
[2] Shib Sankar Sana,et al. Preventive maintenance and optimal buffer inventory for products sold with warranty in an imperfect production system , 2012 .
[3] K. S. Chaudhuri,et al. An EMQ model in an imperfect production process , 2010, Int. J. Syst. Sci..
[4] P. A. Hayek,et al. Production lot sizing with the reworking of imperfect quality items produced , 2001 .
[5] Leopoldo Eduardo Cárdenas-Barrón. A complement to “A comprehensive note on: An economic order quantity with imperfect quality and quantity discounts” , 2012 .
[6] Ata Allah Taleizadeh,et al. An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework , 2012, Expert Syst. Appl..
[7] Leopoldo Eduardo Cárdenas-Barrón. Optimal manufacturing batch size with rework in a single-stage production system - A simple derivation , 2008, Comput. Ind. Eng..
[8] F. A. van der Duyn Schouten,et al. Maintenance optimization of a production system with buffer capacity , 1995 .
[9] K. S. Chaudhuri,et al. Maximising profits for an EPQ model with unreliable machine and rework of random defective items , 2013, Int. J. Syst. Sci..
[10] Yves Dallery,et al. An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers , 1999 .
[11] Leopoldo Eduardo Cárdenas-Barrón,et al. Economic production quantity with rework process at a single-stage manufacturing system with planned backorders , 2009, Comput. Ind. Eng..
[12] Leopoldo Eduardo Cárdenas-Barrón,et al. The economic production quantity (EPQ) with shortage derived algebraically , 2001 .
[13] Romulo I. Zequeira,et al. Optimal buffer inventory and preventive maintenance for an imperfect production process , 2004 .
[14] Russell D. Meller,et al. The impact of preventive maintenance on system cost and buffer size , 1996 .
[15] Shib Sankar Sana,et al. A production-inventory model in an imperfect production process , 2010, Eur. J. Oper. Res..
[16] Shib Sankar Sana,et al. A production-inventory model of imperfect quality products in a three-layer supply chain , 2011, Decis. Support Syst..
[17] Sheng-Tsaing Tseng,et al. Optimal Preventive Maintenance Policy for Deteriorating Production Systems , 1996 .
[18] Leopoldo Eduardo Cárdenas-Barrón. On optimal manufacturing batch size with rework process at single-stage production system , 2007, Comput. Ind. Eng..
[19] Shib Sankar Sana,et al. On a volume flexible inventory model for items with an imperfect production system , 2007 .
[20] K. S. Chaudhuri,et al. Optimal reliability, production lot size and safety stock in an imperfect production system , 2010, Int. J. Math. Oper. Res..
[21] Bhaba R. Sarker,et al. Optimal manufacturing batch size with rework process at a single-stage production system , 2004, Comput. Ind. Eng..
[22] Chih-Chung Lo,et al. Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages , 2006, Math. Comput. Model..
[23] Semyon M. Meerkov,et al. Buffer capacity for accommodating machine downtime in serial production lines , 2001, Proceedings of the 40th IEEE Conference on Decision and Control (Cat. No.01CH37228).
[24] Shib Sankar Sana,et al. An economic production quantity model with stochastic demand in an imperfect production system , 2011 .
[25] Leopoldo Eduardo Cárdenas-Barrón. On optimal batch sizing in a multi-stage production system with rework consideration , 2009, Eur. J. Oper. Res..
[26] Yannis A. Phillis,et al. A CONTINUOUS-FLOW MODEL FOR PRODUCTION NETWORKS WITH FINITE BUFFERS, UNRELIABLE MACHINES, AND MULTIPLE PRODUCTS , 1997 .
[27] S. Goyal,et al. An imperfect production process in a volume flexible inventory model , 2007 .
[28] Chung-Chi Hsieh,et al. Joint determination of production run length and number of standbys in a deteriorating production process , 2005, Eur. J. Oper. Res..
[29] Shib Sankar Sana,et al. A multi-echelon supply chain model for reworkable items in multiple-markets with supply disruption , 2012 .
[30] Kuo-Lung Hou,et al. An optimal production run time with imperfect production processes and allowable shortages , 2003, Comput. Oper. Res..
[31] K. S. Chaudhuri,et al. Three-layer supply chain - A production-inventory model for reworkable items , 2012, Appl. Math. Comput..
[32] Moueen K. Salameh,et al. Optimal just-in-time buffer inventory for regular preventive maintenance , 2001 .
[33] Shib Sankar Sana,et al. An economic production lot size model in an imperfect production system , 2010, Eur. J. Oper. Res..