What are the Benefits of Co-Optimizing Transmission and Generation Investment? Eastern Interconnection Case Study

Transmission planning has traditionally followed a “generation first” or “reactive” logic, in which network reinforcements are planned to accommodate assumed generation build-outs. The emergence of renewables has revealed deficiencies in this approach, in that it ignores the interdependence of transmission and generation investments. For instance, grid investments can provide access to higher quality renewables and thus affect plant siting. Disregarding this complementarity increases costs. In theory, this can be corrected by “proactive” transmission planning, which anticipates how generation investment responds by co-optimizing transmission and generation investments. We evaluate the potential usefulness of co-optimization by applying a mixed-integer linear programming formulation to a 24-bus stakeholder-developed representation of the U.S. Eastern Interconnection. We estimate cost savings from co-optimization compared to both reactive planning and an approach that iterates between generation and transmission investment optimization. These savings turn out to be comparable in magnitude to the amount of incremental transmission investment. We also evaluate three congestion metrics as screens for reducing the number of candidate transmission investments. They each improve solution times, but the estimated potential benefit metric is much more effective in identifying cost-effective lines than the others.

[1]  Nate Blair,et al.  Regional Energy Deployment System (ReEDS) , 2011 .

[2]  Enzo Sauma,et al.  Approximations in power transmission planning: implications for the cost and performance of renewable portfolio standards , 2013 .

[3]  R. Piwko,et al.  Wind energy delivery issues [transmission planning and competitive electricity market operation] , 2005, IEEE Power and Energy Magazine.

[4]  Shan Jin,et al.  A Tri-Level Model of Centralized Transmission and Decentralized Generation Expansion Planning for an Electricity Market—Part I , 2014, IEEE Transactions on Power Systems.

[5]  M. Shahidehpour,et al.  Market-Based Coordination of Transmission and Generation Capacity Planning , 2007, IEEE Transactions on Power Systems.

[6]  Stanton W. Hadley,et al.  Additional EIPC Study Analysis. Final Report , 2014 .

[7]  Shan Jin,et al.  A Tri-Level Model of Centralized Transmission and Decentralized Generation Expansion Planning for an Electricity Market—Part II , 2014, IEEE Transactions on Power Systems.

[8]  Rui Bo,et al.  Novel congested flowgate grouping methods in economic transmission planning , 2014, 2014 IEEE PES General Meeting | Conference & Exposition.

[9]  S. Oren,et al.  Proactive planning and valuation of transmission investments in restructured electricity markets , 2006 .

[10]  Jonathan L. Ho,et al.  An Engineering-Economic Approach to Transmission Planning Under Market and Regulatory Uncertainties: WECC Case Study , 2014, IEEE Transactions on Power Systems.

[11]  R.M. Sawey,et al.  A mathematical model for long range expansion planning of generation and transmission in electric utility systems , 1977, IEEE Transactions on Power Apparatus and Systems.

[12]  Enzo Sauma,et al.  If you build it, he will come: Anticipative power transmission planning , 2013 .

[13]  J. Contreras,et al.  A Three-Level Static MILP Model for Generation and Transmission Expansion Planning , 2013, IEEE Transactions on Power Systems.

[14]  Ming Ni,et al.  Coordinating Large-Scale Wind Integration and Transmission Planning , 2013, IEEE Transactions on Sustainable Energy.

[15]  B. Hobbs,et al.  The economics of planning electricity transmission to accommodate renewables: Using two-stage optimisation to evaluate flexibility and the cost of disregarding uncertainty , 2012 .

[16]  Nima Amjady,et al.  Generation and Transmission Expansion Planning: MILP–Based Probabilistic Model , 2014, IEEE Transactions on Power Systems.

[17]  Enzo Sauma,et al.  The economic effects of interregional trading of renewable energy certificates in the WECC. , 2016 .

[18]  Rui Bo,et al.  LODF-based transmission solution screening method in economic transmission planning , 2015, 2015 IEEE Power & Energy Society General Meeting.

[19]  E. Kahn Wind integration studies: optimization vs. Simulation , 2010 .

[20]  Rui Bo,et al.  A new congested flowgate ranking strategy in MISO Market Efficiency Planning Study , 2013, 2013 IEEE Power & Energy Society General Meeting.

[21]  Hamidreza Zareipour,et al.  A Transmission Planning Framework Considering Future Generation Expansions in Electricity Markets , 2010, IEEE Transactions on Power Systems.

[22]  Kenny Gruchalla,et al.  Eastern Renewable Generation Integration Study , 2016 .

[23]  James D. McCalley,et al.  Building Foresight in Long-Term Infrastructure Planning Using End-Effect Mitigation Models , 2017, IEEE Systems Journal.