A Fuzzy Cognitive Map Approach Applied in Cost–Benefit Analysis for Highway Projects

Cost–benefit analysis (CBA) is a method widely used all over the world for transport project appraisal. However, this method needs to handle the inherent uncertainty which affects the results negatively. In a highway project, there are high uncertainties due to a lack of data, future predictions, economic indeterminacy, etc. In conventional approaches, a risk analysis, which is based primarily on a sensitivity analysis and/or Monte Carlo simulation, is conducted in order to solve the problems mentioned above. However, these approaches present some main drawbacks. This study aims to investigate the usability and utility of a new approach in highways CBA in order to cope with uncertainty easily and in a more user-friendly way. To achieve the above-cited goal, the technique of a fuzzy cognitive map (FCM) was utilized due to its popularity in modeling complex problems. A decision-making FCM model including a RISK parameter was developed by experienced people/experts in this scientific domain to assess benefits and costs in highway projects. The developed FCM model focuses on minimizing the effects of uncertainty in the CBA for highways. Therefore, the concepts of conventional CBA were defined within the domain of risk analysis. The performance of the developed FCM model was tested through actual feasibility studies as well as through a specific case study. As a result of comparisons, promising results for validation of the developed FCM model are obtained.

[1]  R. Axelrod Structure of decision : the cognitive maps of political elites , 2015 .

[2]  Seyed Hossein Iranmanesh,et al.  A comprehensive framework for project selection problem under uncertainty and real-world constraints , 2011, Comput. Ind. Eng..

[3]  Cheng-Min Feng,et al.  Integrated cost-benefit analysis with environmental factors for a transportation project : Case of pinglin interchange in taiwan , 2007 .

[4]  Gwo-Hshiung Tzeng,et al.  Transportation investment project selection using fuzzy multiobjective programming , 1998, Fuzzy Sets Syst..

[5]  J.A.B. Tome,et al.  Rule based fuzzy cognitive maps-qualitative systems dynamics , 2000, PeachFuzz 2000. 19th International Conference of the North American Fuzzy Information Processing Society - NAFIPS (Cat. No.00TH8500).

[6]  Filipe Moura,et al.  Transport infrastructure project evaluation using cost-benefit analysis , 2014 .

[7]  Chung-Li Tseng,et al.  Highway Development Decision-Making under Uncertainty: A Real Options Approach , 2004 .

[8]  Beatrice Lazzerini,et al.  Pessimistic evaluation of risks using ranking of generalized fuzzy numbers , 2010, 2010 IEEE International Systems Conference.

[9]  H. Campbell,et al.  Benefit-Cost Analysis: Financial and Economic Appraisal using Spreadsheets , 2003 .

[10]  Steen Leleur,et al.  Transport appraisal and Monte Carlo simulation by use of the CBA-DK model , 2011 .

[11]  Pedro Godinho,et al.  Cost-Benefit Analysis and the Optimal Timing of Road Infrastructures , 2012 .

[12]  Vildan Özkir,et al.  A fuzzy assessment framework to select among transportation investment projects in Turkey , 2012, Expert Syst. Appl..

[13]  Elpiniki I. Papageorgiou,et al.  A new methodology for Decisions in Medical Informatics using fuzzy cognitive maps based on fuzzy rule-extraction techniques , 2011, Appl. Soft Comput..

[14]  Elpiniki I. Papageorgiou,et al.  Review study on fuzzy cognitive maps and their applications during the last decade , 2011, 2011 IEEE International Conference on Fuzzy Systems (FUZZ-IEEE 2011).

[15]  B. Roy,et al.  The uses of cost–benefit analysis in public transportation decision-making in France , 2009 .

[16]  Avishai Ceder,et al.  Transportation projects selection process using fuzzy sets theory , 2000, Fuzzy Sets Syst..

[17]  Peter P. Groumpos,et al.  Fuzzy Cognitive Maps: Basic Theories and Their Application to Complex Systems , 2010 .

[18]  Seçkin Polat,et al.  A fuzzy cognitive map approach for effect-based operations: An illustrative case , 2009, Inf. Sci..

[19]  Joseph H. M. Tah,et al.  A fuzzy approach to constuction project risk assessment and analysis: construction project risk management system , 2001 .

[20]  Steen Leleur,et al.  Modelling of transport project uncertainties:risk assessment and scenario analysis , 2009 .

[21]  Theofanis Gemtos,et al.  Soft Computing Technique of Fuzzy Cognitive Maps to Connect Yield Defining Parameters with Yield in Cotton Crop Production in Central Greece as a Basis for a Decision Support System for Precision Agriculture Application , 2010 .

[22]  Elpiniki I. Papageorgiou,et al.  Application of fuzzy cognitive maps for cotton yield management in precision farming , 2009, Expert Syst. Appl..

[23]  Beatrice Lazzerini,et al.  Analyzing Risk Impact Factors Using Extended Fuzzy Cognitive Maps , 2011, IEEE Systems Journal.

[24]  Sergios Lambropoulos,et al.  Modeling Uncertainty During Cost Benefit Analysis of Transportation Projects with the Aid of Fuzzy Set Theory , 2012 .

[25]  Rıfat Akbıyıklı,et al.  Utilisation of Intelligent Systems in the Economical Evaluation of Transportation Projects , 2015 .

[26]  Pejman Rezakhani,et al.  Fuzzy Risk Analysis Model for Construction Projects , 2011 .

[27]  Chrysostomos D. Stylios,et al.  Modeling complex systems using fuzzy cognitive maps , 2004, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.

[28]  Bart Kosko,et al.  Fuzzy Cognitive Maps , 1986, Int. J. Man Mach. Stud..

[29]  Jose L. Salmeron,et al.  A Review of Fuzzy Cognitive Maps Research During the Last Decade , 2013, IEEE Transactions on Fuzzy Systems.

[30]  Rıfat Akbıyıklı,et al.  Ulaştırma yapıları ekonomik analizlerinde iskonto oranı: bir durum çalışması , 2015 .

[31]  Panagiota Spyridonos,et al.  Brain tumor characterization using the soft computing technique of fuzzy cognitive maps , 2008, Appl. Soft Comput..

[32]  B. Wee,et al.  Attitudes towards the role of Cost–Benefit Analysis in the decision-making process for spatial-infrastructure projects: A Dutch case study , 2013 .

[33]  David Banister,et al.  Assessment of large transport infrastructure projects: The CBA-DK model , 2009 .

[34]  Santiago Medina Hurtado,et al.  Modeling of Operative Risk Using Fuzzy Expert Systems , 2010 .