An Effective 4–Phased Framework for Scheduling Job-Shop Manufacturing Systems Using Weighted NSGA-II
暂无分享,去创建一个
[1] S. Kwong,et al. Many-Objective Job-Shop Scheduling: A Multiple Populations for Multiple Objectives-Based Genetic Algorithm Approach , 2021, IEEE Transactions on Cybernetics.
[2] W. Pedrycz,et al. Solving Multiobjective Fuzzy Job-Shop Scheduling Problem by a Hybrid Adaptive Differential Evolution Algorithm , 2022, IEEE Transactions on Industrial Informatics.
[3] Shih-Wei Lin,et al. Minimizing total completion time in the no-wait jobshop scheduling problem using a backtracking metaheuristic , 2022, Comput. Ind. Eng..
[4] L. Benyoucef,et al. Sustainable multi-objective process planning in reconfigurable manufacturing environment: adapted new dynamic NSGA-II vs New NSGA-III , 2022, Int. J. Prod. Res..
[5] A. Saif,et al. Robust job-shop scheduling under deterministic and stochastic unavailability constraints due to preventive and corrective maintenance , 2022, Comput. Ind. Eng..
[6] J. Villalobos,et al. Exact and heuristic algorithms for the parallel machine total completion time scheduling problem with dual resources, ready times, and sequence-dependent setup times , 2022, Comput. Oper. Res..
[7] S. Nickel,et al. A multi-method approach to scheduling and efficiency analysis in dual-resource constrained job shops with processing time uncertainty , 2022, Comput. Ind. Eng..
[8] M. F. Baki,et al. A multi-objective mathematical model and evolutionary algorithm for the dual-resource flexible job-shop scheduling problem with sequencing flexibility , 2022, Flexible Services and Manufacturing Journal.
[9] Jorge Puente,et al. Multi-objective enhanced memetic algorithm for green job shop scheduling with uncertain times , 2021, Swarm Evol. Comput..
[10] Abdelghani Bekrar,et al. Bi-local search based variable neighborhood search for job-shop scheduling problem with transport constraints , 2020, Optim. Lett..
[11] Seyed Mojtaba Sajadi,et al. Multi‐objective optimization for stochastic failure‐prone job shop scheduling problem via hybrid of NSGA‐II and simulation method , 2019, Expert Syst. J. Knowl. Eng..
[12] R. Hartl,et al. Solution Methods for the Dual-Resource-Constrained Re-Entrant Flexible Flow Shop , 2022, SSRN Electronic Journal.
[13] M. Ariffin,et al. A Comprehensive Fuzzy Decision-Making Method for Minimizing Completion Time in Manufacturing Process in Supply Chains , 2021, Mathematics.
[14] Ajai Jain,et al. Analysis of Integrated Preventive Maintenance and Machine Failure in Stochastic Flexible Job Shop Scheduling with Sequence-dependent Setup Time , 2021, Smart Science.
[15] Bhaskaran Gopalakrishnan,et al. Automated job shop scheduling with dynamic processing times and due dates using project management and industry 4.0 , 2021 .
[16] Sebastian Borucki,et al. Dual Resource Constrained Flexible Job Shop Scheduling Based on Improved Quantum Genetic Algorithm , 2021 .
[17] Yige Sun,et al. Novel robotic job-shop scheduling models with deadlock and robot movement considerations , 2021 .
[18] Pedro Ponce,et al. Empowering Digital Twin for Industry 4.0 using metaheuristic optimization algorithms: case study PCB drilling optimization , 2021, The International Journal of Advanced Manufacturing Technology.
[19] Xianguo Wu,et al. Multiobjective optimization of building energy consumption based on BIM-DB and LSSVM-NSGA-II , 2021, Journal of Cleaner Production.
[20] Daming Shi,et al. A Fuzzy Adaptive Dynamic NSGA-II With Fuzzy-Based Borda Ranking Method and its Application to Multimedia Data Analysis , 2021, IEEE Transactions on Fuzzy Systems.
[21] Millie Pant,et al. A Comprehensive Review on NSGA-II for Multi-Objective Combinatorial Optimization Problems , 2021, IEEE Access.
[22] Shaomin Wu,et al. An effective approach for the dual-resource flexible job shop scheduling problem considering loading and unloading , 2020, Journal of Intelligent Manufacturing.
[23] Zhiping Peng,et al. Solving energy-efficient distributed job shop scheduling via multi-objective evolutionary algorithm with decomposition , 2020, Swarm Evol. Comput..
[24] Jing Xue,et al. Cold Chain Logistics Path Optimization via Improved Multi-Objective Ant Colony Algorithm , 2020, IEEE Access.
[25] Ahad Ali,et al. A Hybrid Ant Colony Optimization and Simulated Annealing Algorithm for Multi-Objective Scheduling of Cellular Manufacturing Systems , 2020, Int. J. Appl. Metaheuristic Comput..
[26] Zhu Hao-dong,et al. Modified Water Wave Optimization for Energy-Conscious Dual-Resource Constrained Flexible Job Shop Scheduling , 2020, Int. J. Perform. Eng..
[27] Penghong Wang,et al. A Gaussian error correction multi‐objective positioning model with NSGA‐II , 2019, Concurr. Comput. Pract. Exp..
[28] Raymond Chiong,et al. A hybrid artificial bee colony algorithm for flexible job shop scheduling with worker flexibility , 2019, Int. J. Prod. Res..
[29] B. H. Huynh,et al. Ant Colony Optimization Algorithm for Maintenance, Repair and Overhaul Scheduling Optimization in the Context of Industrie 4.0 , 2019, Applied Sciences.
[30] Jian Zhang,et al. Review of job shop scheduling research and its new perspectives under Industry 4.0 , 2017, Journal of Intelligent Manufacturing.
[31] Robert L. Burdett,et al. A flexible job shop scheduling approach with operators for coal export terminals , 2019, Comput. Oper. Res..
[32] Dominik Kress,et al. A worker constrained flexible job shop scheduling problem with sequence-dependent setup times , 2018, OR Spectr..
[33] Ali Doniavi,et al. A heuristic model for dynamic flexible job shop scheduling problem considering variable processing times , 2018, Int. J. Prod. Res..
[34] G. Ramya,et al. Case Study Analysis of Job Shop Scheduling and its Integration with Material Requirement Planning , 2019, Materials Today: Proceedings.
[35] Mohammad Hossein Fazel Zarandi,et al. An enhanced NSGA-II algorithm for fuzzy bi-objective assembly line balancing problems , 2018, Comput. Ind. Eng..
[36] Wei Liu,et al. A new double flexible job-shop scheduling problem integrating processing time, green production, and human factor indicators , 2018 .
[37] Olfa Belkahla Driss,et al. Dual-Resource Constraints in Classical and Flexible Job Shop Problems: A State-of-the-Art Review , 2018, KES.
[38] Parinaz Vaez,et al. A New Mathematical Model for Simultaneous Lot-sizing and Production Scheduling Problems Considering Earliness/Tardiness Penalties and Setup Costs , 2017 .
[39] Mohd Khairol Anuar Mohd Ariffin,et al. A multi-period scheduling method for trading-off between skilled-workers allocation and outsource service usage in dynamic CMS , 2017, Int. J. Prod. Res..
[40] P O Skobelev,et al. On the way from Industry 4.0 to Industry 5.0: from digital manufacturing to digital society , 2017 .
[41] Masoud Rabbani,et al. A Scheduling Model for the Re-entrant Manufacturing System and Its Optimization by NSGA-II , 2016 .
[42] Ahad Ali,et al. A multi-period scheduling of dynamic cellular manufacturing systems in the presence of cost uncertainty , 2016, Comput. Ind. Eng..
[43] Mohammad Ali Ahmadi,et al. Multi objective optimization of performance of three-heat-source irreversible refrigerators based algorithm NSGAII , 2016 .
[44] Ling Wang,et al. A knowledge-guided fruit fly optimization algorithm for dual resource constrained flexible job-shop scheduling problem , 2016 .
[45] Raymond Chiong,et al. Solving the energy-efficient job shop scheduling problem: a multi-objective genetic algorithm with enhanced local search for minimizing the total weighted tardiness and total energy consumption , 2016 .
[46] Mohd Khairol Anuar Mohd Ariffin,et al. Review of evolution of cellular manufacturing system’s approaches: Material transferring models , 2016 .
[47] Tom Page,et al. A hybrid discrete firefly algorithm for solving multi-objective flexible job shop scheduling problems , 2015, Int. J. Bio Inspired Comput..
[48] Mohammad Saidi-Mehrabad,et al. An Ant Colony Algorithm (ACA) for solving the new integrated model of job shop scheduling and conflict-free routing of AGVs , 2015, Comput. Ind. Eng..
[49] M. Zandieh,et al. TWO META-HEURISTIC ALGORITHMS FOR THE DUAL-RESOURCE CONSTRAINED FLEXIBLE JOB-SHOP SCHEDULING PROBLEM , 2015 .
[50] Jože Tavčar,et al. Case study analysis and genetic algorithm adaptation for job process planning and scheduling in batch production , 2014 .
[51] M. Fatih Tasgetiren,et al. A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities , 2014 .
[52] Ruhul A. Sarker,et al. A DSS for job scheduling under process interruptions , 2011 .
[53] Mohamad Y. Jaber,et al. Modelling worker fatigue and recovery in dual-resource constrained systems , 2010, Comput. Ind. Eng..
[54] Yixiong Feng,et al. A new multi-objective ant colony algorithm for solving the disassembly line balancing problem , 2010 .
[55] Fengyuan Ren,et al. Scheduling " , , 1997 .
[56] Kalyanmoy Deb,et al. Muiltiobjective Optimization Using Nondominated Sorting in Genetic Algorithms , 1994, Evolutionary Computation.