Abstract The paper presents calculation of a unit price of construction elements or works with the use of the case-based reasoning (CBR) method. The primary source of knowledge in the CBR method is a collection of cases encountered in previous problems and retained in memory. The solution to a completely new problem is generated by finding the most suitable cases and adjusting them to the new case. A method of a unit price calculation will be shown which uses the prices found in the accessible set of previously occurring cases, i.e. it uses the prices listed in estimations presented in offer bids. The CBR systems consist of data bases in which the cases are stored along with their solutions. So the paper presents a concept of a knowledge base supporting the process of cost estimation at the preliminary stage of a construction project.

[1]  David Lowe,et al.  Data modelling and the application of a neural network approach to the prediction of total construction costs , 2002 .

[2]  Agnieszka Leśniak,et al.  The application of artificial neural networks in indirect cost estimation , 2013 .

[3]  Sangyong Kim,et al.  Hybrid forecasting system based on case-based reasoning and analytic hierarchy process for cost estimation , 2013 .

[4]  H. Murat Gunaydin,et al.  A neural network approach for early cost estimation of structural systems of buildings , 2004 .

[5]  Agnieszka Leśniak,et al.  Overhead costs and profit calculation by Polish contractors , 2013 .

[6]  Sung Hoon An,et al.  Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning , 2004 .

[7]  Agata Czarnigowska,et al.  Unit rate-based cost estimating – input and methods , 2014 .

[8]  Edmundas Kazimieras Zavadskas,et al.  Estimation of external walls decisions of multistorey residential buildings applying methods of multicriteria analysis , 2005 .

[9]  Marcin Gajzler Text and data mining techniques in aspect of knowledge acquisition for decision support system in construction industry , 2010 .

[10]  Michał Juszczyk The use of artificial neural networks for residential buildings conceptual cost estimation , 2013 .

[11]  J. M. Castelain,et al.  Cost Estimation During Design Step: Parametric Method versus Case Based Reasoning Method , 1999 .

[12]  Kyung In Kang,et al.  A case-based reasoning cost estimating model using experience by analytic hierarchy process , 2007 .

[13]  D. Lowe,et al.  Predicting construction cost using multiple regression techniques , 2006 .

[14]  InduShobha N. Chengalur-Smith,et al.  Modeling the costs of bridge rehabilitation , 1997 .

[15]  Chang-Taek Hyun,et al.  A Study on the Development of a Cost Model Based on the Owner's Decision Making at the Early Stages of a Construction Project , 2010 .

[16]  Hun Hee Cho,et al.  Neural network model incorporating a genetic algorithm in estimating construction costs , 2004 .

[17]  Alena Tazikova ACHIEVEMENT ECONOMIC AND ENVIRONMENTAL EFFICIENCY OF CONSTRUCTION USING THE PARALLEL CALCULATING COSTS , 2013 .

[18]  Peter Mesaros EMPIRICAL ANALYSIS OF APPROACHES TO COST MANAGEMENT OF ARCHITECTURAL AND CONSTRUCTION PROJECTS IN SLOVAKIA , 2014 .

[19]  James T. O'Connor,et al.  Quantity-Based Approach to Preliminary Cost Estimates for Highway Projects , 2006 .