Adaptive Scheduling and Control of One-of-a-Kind Production
暂无分享,去创建一个
[1] A. S. Spachis,et al. Heuristics for flow-shop scheduling , 1980 .
[2] Yiliu Tu. Automatic scheduling and control of a ship web welding assembly line , 1996 .
[3] S. G. Deshmukh,et al. Simulation for analysis of scheduling rules for a flexible manufacturing system , 1995 .
[4] Michael J. Shaw,et al. Adaptive scheduling in dynamic flexible manufacturing systems: a dynamic rule selection approach , 1997, IEEE Trans. Robotics Autom..
[5] Éric D. Taillard,et al. Benchmarks for basic scheduling problems , 1993 .
[6] Reha Uzsoy,et al. Decomposition Methods for Complex Factory Scheduling Problems , 1996 .
[7] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[8] R. A. Dudek,et al. A Heuristic Algorithm for the n Job, m Machine Sequencing Problem , 1970 .
[9] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .
[10] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[11] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[12] Jc Johan Wortmann,et al. Customer-driven manufacturing , 1996 .
[13] Erik Demeulemeester,et al. Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..