Stakeholders Assessment of Constraints to Project Delivery in the Nigerian Construction Industry

The central goal of construction stakeholders is to successfully deliver projects to stated objective (s). However, for decades, construction projects have been plagued by perennial constraints of cost and time overruns, poor quality, and lack of sustainability. The objective of this paper is to identify and assess the constraints to construction project delivery, and to recommend solutions to enhance project performance. This paper adopted both quantitative and qualitative methods to establish the constraints in the Nigerian construction industry. A pilot survey and literature reviewed revealed a total of fifty (50) construction constraints, which were further classified into eight (8) major groups. Well-structured questionnaires were administered to construction stakeholders (client, consultant and contractor) in Abuja, the federal capital city of Nigeria. Relative Importance Index (RII) was used to analyze the data using Likert scale.  The results suggest that cost/time overrun related factors (inability to reduce project cost), Stakeholders interactive-related factors (inability to establish client value system), Client-related factors (Delay in interim payment and finance problem), and Labor/material-related factors (escalation of material prices and materials quality variability) are the most prevalent constraints in the Nigerian construction environment.  To mitigate the effects of these challenges, it is suggested that a formal innovative approach should be used by stakeholders to address the problems of poor communication, high project cost, and delay. Clients should also take measures to provide adequate funding and should promptly honor interim certificates.

[1]  Steve Rowlinson,et al.  Construction project procurement routes: an in‐depth critique , 2009 .

[2]  Geoffrey Qiping Shen,et al.  Critical Success Factors for Value Management Workshops in Malaysia , 2015 .

[3]  Koleola Tunwase Odusami,et al.  Significant Factors Causing Cost Overruns in Telecommunication Projects in Nigeria , 2010 .

[4]  G. Otim,et al.  An Assessment of the Factors Causing Delays on Building Construction Projects in Uganda , 2014 .

[5]  A. Lawal,et al.  Factors Influencing the Performance of Construction Projects in Akure, Nigeria , 2015 .

[6]  N. Mansfield,et al.  Causes of delay and cost overruns in Nigerian construction projects , 1994 .

[7]  Ayodeji Emmanuel Oke,et al.  Impact of environmental factors on building project performance in Delta State, Nigeria , 2015 .

[8]  N. U. Dim,et al.  Strategic Supply Chain Framework as an Effective Approach to Procurement of Public Construction Projects in Nigeria , 2015 .

[9]  Edom Atomen,et al.  Labour Productivity in Construction Industry in Nigeria: Case of Lagos and Port Harcourt, Southern Nigeria , 2015 .

[10]  Daniel C. Okpala,et al.  Causes of High Costs of Construction in Nigeria , 1988 .

[11]  G. O. Jagboro,et al.  The effects of construction delays on project delivery in Nigerian construction industry , 2002 .

[12]  Ismail Rahmat,et al.  The performance measurement of construction projects managed by ISO-certified contractors in Malaysia , 2010 .

[13]  Christine Pasquire,et al.  The magic of the Last Planner® System for Nigerian construction , 2014 .