Evaluation methods for construction projects

Abstract Financial evaluation methods such as Net Present Value (NPV) and Internal Rate of Return (IRR) are not fully adequate for accounting three practical aspects of construction projects: reinvestment rate, actual amount of required investment, and firm available funds. In a certain type of projects, this inadequacy often results in the inapplicability of NPV, multiple or no IRR problem, systematic bias of IRR, and inconsistent decision signal and ranking between NPV and IRR. Many modified methods have been developed, but hardly succeeded in reflecting construction market reality in an integrated manner. To address this issue, Project Present Value, Project Rate of Return, and Firm Rate of Return are proposed together with an investment decision framework. The proposed methods are designed to be free from all those problems, while incorporating market reality in them. As a result, construction practitioners would have more reliable and economically meaningful decision tools, which lead to the success ...

[1]  Mlrosjlaw M. Hajdasiński TECHNICAL NOTE—ADJUSTING THE MODIFIED INTERNAL RATES OF RETURN , 1996 .

[2]  Gordon B. Hazen,et al.  A NEW PERSPECTIVE ON MULTIPLE INTERNAL RATES OF RETURN , 2003 .

[3]  Aneel Keswani,et al.  How real option disinvestment flexibility augments project NPV , 2006, Eur. J. Oper. Res..

[4]  Steven A. Y. Lin The Modified Internal Rate of Return and Investment Criterion , 1976 .

[5]  Gordon Hazen,et al.  An Extension of the Internal Rate of Return to Stochastic Cash Flows , 2009, Manag. Sci..

[6]  David M. Shull OVERALL RATES OF RETURN: INVESTMENT BASES, REINVESTMENT RATES AND TIME HORIZONS , 1994 .

[7]  Campbell R. Harvey,et al.  How Do Cfos Make Capital Budgeting and Capital Structure Decisions? , 2002 .

[8]  Robert G. Beaves,et al.  The Case for a Generalized Net Present Value Formula , 1993 .

[9]  Bert De Reyck,et al.  Project options valuation with net present value and decision tree analysis , 2008, Eur. J. Oper. Res..

[10]  R. Bernhard Base Selection for Modified Rates of Return and its Irrelevance for Optimal Project Choice , 1989 .

[11]  Daniel E. McCarty,et al.  DISCOUNTED CASH FLOW WITH EXPLICIT REINVESTMENT RATES: TUTORIAL AND EXTENSION , 1986 .

[12]  Joseph C. Hartman,et al.  THE RELEVANT INTERNAL RATE OF RETURN , 2004 .

[13]  Lynn E. Bussey The economic analysis of industrial projects , 1978 .

[14]  David M. Shull Efficient Capital Project Selection Through a Yield-Based Capital Budgeting Technique , 1992 .

[15]  Robert G. Beaves Net Present Value and Rate of Return: Implicit and Explicit Reinvestment Assumptions , 1988 .

[16]  Robert L. K. Tiong,et al.  NPV-at-Risk Method in Infrastructure Project Investment Evaluation , 2000 .