Steel Production Methods Improvement Study
暂无分享,去创建一个
[1] Marvin Everett Mundel,et al. Motion and Time Study: Improving Productivity , 1970 .
[2] Daniel T. Koenig. Manufacturing Engineering: Principles for Optimization , 1997 .
[3] Bor-Yuh Leu. Simulation Analysis of Scheduling Heuristics in a Flow-Line Manufacturing Cell with Two Types of Order Shipment Environments , 1996, Simul..
[4] Gary M. Thompson. Improved implicit optimal modeling of the labor shift scheduling problem , 1995 .
[5] Randall P. Sadowski,et al. Introduction to Simulation Using Siman , 1990 .
[6] Ricki G. Ingalls. Introduction to simulation: introduction to simulation , 2002, WSC '02.
[7] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[8] Gordon M. Clark. Introduction to manufacturing applications , 1994 .
[9] Karl-Erik Thelning,et al. Steel and its Heat Treatment , 1936, Nature.
[10] Onur M. Ülgen,et al. Simulation methodology in practice - part II: Selling the results , 1994 .
[11] Robert T. McIntyre,et al. Proceedings of the 1993 Winter Simulation Conference , 1993 .
[12] M. G. McComas,et al. Expertfit: total support for simulation input modeling , 1999, WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038).
[13] J. Lasserre. An Integrated Model for Job-Shop Planning and Scheduling , 1992 .
[14] Wushow Chou,et al. Queueing Systems, Volume II: Computer Applications - Leonard Kleinrock , 1977, IEEE Transactions on Communications.
[15] Thomas E. Morton,et al. Heuristic scheduling systems : with applications to production systems and project management , 1993 .
[16] Narayan Raman. Input control in job shops , 1995 .
[17] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[18] J. Banks,et al. Discrete-Event System Simulation , 1995 .