Steel Production Methods Improvement Study

We present a three-phase, interdisciplinary study undertaken to improve methods of steel production within timing and capital investment constraints. The defined objective of this study was to increase the throughput of the hydrogen annealing process via assessment of various operating policies and resource levels. The three phases of the study successively involved work measurement project management, and discrete process simulation.

[1]  Marvin Everett Mundel,et al.  Motion and Time Study: Improving Productivity , 1970 .

[2]  Daniel T. Koenig Manufacturing Engineering: Principles for Optimization , 1997 .

[3]  Bor-Yuh Leu Simulation Analysis of Scheduling Heuristics in a Flow-Line Manufacturing Cell with Two Types of Order Shipment Environments , 1996, Simul..

[4]  Gary M. Thompson Improved implicit optimal modeling of the labor shift scheduling problem , 1995 .

[5]  Randall P. Sadowski,et al.  Introduction to Simulation Using Siman , 1990 .

[6]  Ricki G. Ingalls Introduction to simulation: introduction to simulation , 2002, WSC '02.

[7]  Michael Pinedo,et al.  Scheduling: Theory, Algorithms, and Systems , 1994 .

[8]  Gordon M. Clark Introduction to manufacturing applications , 1994 .

[9]  Karl-Erik Thelning,et al.  Steel and its Heat Treatment , 1936, Nature.

[10]  Onur M. Ülgen,et al.  Simulation methodology in practice - part II: Selling the results , 1994 .

[11]  Robert T. McIntyre,et al.  Proceedings of the 1993 Winter Simulation Conference , 1993 .

[12]  M. G. McComas,et al.  Expertfit: total support for simulation input modeling , 1999, WSC'99. 1999 Winter Simulation Conference Proceedings. 'Simulation - A Bridge to the Future' (Cat. No.99CH37038).

[13]  J. Lasserre An Integrated Model for Job-Shop Planning and Scheduling , 1992 .

[14]  Wushow Chou,et al.  Queueing Systems, Volume II: Computer Applications - Leonard Kleinrock , 1977, IEEE Transactions on Communications.

[15]  Thomas E. Morton,et al.  Heuristic scheduling systems : with applications to production systems and project management , 1993 .

[16]  Narayan Raman Input control in job shops , 1995 .

[17]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[18]  J. Banks,et al.  Discrete-Event System Simulation , 1995 .