Decomposition-based classified ant colony optimization algorithm for scheduling semiconductor wafer fabrication system
暂无分享,去创建一个
Zhibin Jiang | Na Li | Chengtao Guo | Huai Zhang | Zhibin Jiang | Huai Zhang | Na Li | Chengtao Guo
[1] Thomas Stützle,et al. Ant Colony Optimization , 2009, EMO.
[2] M. Mathirajan,et al. Tabu Search methods for scheduling a burn-in oven with non-identical job sizes and secondary resource constraints , 2008 .
[3] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[4] Egon Balas,et al. The Shifting Bottleneck Procedure for Job Shop Scheduling , 1988 .
[5] Doo Yong Lee,et al. Scheduling cluster tools in wafer fabrication using candidate list and simulated annealing , 1998, J. Intell. Manuf..
[6] N. Zerhouni,et al. An integrated ACO approach for the joint production and preventive maintenance scheduling problem in the flowshop sequencing problem , 2008, 2008 IEEE International Symposium on Industrial Electronics.
[7] Yi-Feng Hung,et al. DISPATCHING RULES USING FLOW TIME PREDICTIONS FOR SEMICONDUCTOR WAFER FABRICATIONS , 2002 .
[8] Ali Husseinzadeh Kashan,et al. Scheduling a single batch-processing machine with arbitrary job sizes and incompatible job families: An ant colony framework , 2008, J. Oper. Res. Soc..
[9] Ching-Jong Liao,et al. Ant colony optimization combined with taboo search for the job shop scheduling problem , 2008, Comput. Oper. Res..
[10] John W. Fowler,et al. Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops , 2007, Eur. J. Oper. Res..
[11] Reha Uzsoy,et al. Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times. , 1995 .
[12] Christian Blum,et al. ACO Applied to Group Shop Scheduling: A Case Study on Intensification and Diversification , 2002, Ant Algorithms.
[13] A.A. Rodriguez,et al. Hierarchical modeling and control of re-entrant semiconductor manufacturing facilities , 1996, Proceedings of 35th IEEE Conference on Decision and Control.
[14] Chandrasekharan Rajendran,et al. Efficient dispatching rules for scheduling in a job shop , 1997 .
[15] Egon Balas,et al. Machine Sequencing Via Disjunctive Graphs: An Implicit Enumeration Algorithm , 1969, Oper. Res..
[16] Liu Hui-ran. An EOPN-Based Real-Time Scheduling Simulation Platform of Wafer Fabrication System , 2006 .
[17] E. Nowicki,et al. A Fast Taboo Search Algorithm for the Job Shop Problem , 1996 .
[18] Marco Dorigo,et al. Optimization, Learning and Natural Algorithms , 1992 .
[19] Christian Blum,et al. Beam-ACO - hybridizing ant colony optimization with beam search: an application to open shop scheduling , 2005, Comput. Oper. Res..
[20] I. M. Ovacikt,et al. Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times , 1994 .
[21] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[22] P.R. Kumar. Scheduling semiconductor manufacturing plants , 1994, IEEE Control Systems.
[23] John W. Fowler,et al. A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops , 2002 .
[24] Reha Uzsoy,et al. A capacity allocation problem with integer side constraints , 1998, Eur. J. Oper. Res..
[25] Yang Song,et al. Bottleneck Station Scheduling in Semiconductor Assembly and Test Manufacturing Using Ant Colony Optimization , 2007, IEEE Transactions on Automation Science and Engineering.
[26] Huiran Liu,et al. Modelling of semiconductor wafer fabrication systems by extended object-oriented Petri nets , 2005 .
[27] Marco Dorigo,et al. Ant colony optimization theory: A survey , 2005, Theor. Comput. Sci..
[28] Lawrence M. Wein,et al. Scheduling semiconductor wafer fabrication , 1988 .
[29] Loon Ching Tang,et al. Dispatching heuristic for wafer fabrication , 2001, Proceeding of the 2001 Winter Simulation Conference (Cat. No.01CH37304).
[30] Chen-Fu Chien,et al. A novel timetabling algorithm for a furnace process for semiconductor fabrication with constrained waiting and frequency-based setups , 2007, OR Spectr..
[31] Reha Uzsoy,et al. Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication , 2007, J. Sched..
[32] Marco Dorigo,et al. Ant system for Job-shop Scheduling , 1994 .
[33] Christopher D. Geiger,et al. A Tabu search approach to scheduling an automated wet etch station , 1997 .
[34] Fuh-Der Chou,et al. A simulated annealing approach with probability matrix for semiconductor dynamic scheduling problem , 2008, Expert Syst. Appl..
[35] Reha Uzsoy,et al. Dispatching Rules For Semiconductor Testing Operations: A Computational Study , 1992, Thirteenth IEEE/CHMT International Electronics Manufacturing Technology Symposium.
[36] Thomas Stützle,et al. An Ant Approach to the Flow Shop Problem , 1998 .
[37] Thomas Stützle,et al. MAX-MIN Ant System , 2000, Future Gener. Comput. Syst..
[38] Li Li,et al. ACO-based multi-objective scheduling of parallel batch processing machines with advanced process control constraints , 2009 .
[39] Marcos Singer,et al. Decomposition methods for large job shops , 2001, Comput. Oper. Res..