Optimal control model for finite capacity continuous MRP with deteriorating items

A general model for continuous material requirements planning problem is proposed which contains of reworking of returned items along with deterioration of items. In the proposed model there are separated stocks for manufactured, returned and reworked items and also it is possible to consider returned items from both inventories of manufactured and reworked items. A general finite time linear quadratic optimal control problem is presented to attain the goal values for inventories, demands and productions. The goal values for inventories, demands and production can be considered as the capacity of stocks, scheduled demand and capacity of transportation respectively. Since the time is considered as a continuous parameter, the carrying cost of production process is more real than the periodic approach wherein time is considered as a discrete parameter. Finally a solution method is presented and numerical simulations are provided to validate the approach.

[1]  Zhigang Wu,et al.  Optimal control of a continuum model for single-product re-entrant manufacturing systems , 2011 .

[2]  Lotfi Tadj,et al.  Adaptive control of inventory systems with unknown deterioration rate , 2012 .

[3]  Teeradej Wuttipornpun,et al.  Development of finite capacity material requirement planning system for assembly operations , 2004 .

[4]  Rossella Pozzi,et al.  Improving production planning through finite-capacity MRP , 2017, Int. J. Prod. Res..

[5]  Pisal Yenradee,et al.  Performance of TOC based finite capacity material requirement planning system for a multi-stage assembly factory , 2007 .

[6]  Sohrab Effati,et al.  Optimal control problem via neural networks , 2013, Neural Computing and Applications.

[7]  A. Pooya,et al.  A taxonomy of manufacturing strategies and production systems using self-organizing map , 2017 .

[8]  Alexandre Dolgui,et al.  Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint , 2011, Journal of Intelligent Manufacturing.

[9]  Anders Segerstedt,et al.  Cover-Time Planning/Takt Planning: A technique for materials requirement and production planning , 2017 .

[10]  Jan Riezebos,et al.  MRP Planned Orders in a Multiple‐Supplier Environment with Differing Lead Times , 2015 .

[11]  Ramin Sadeghian Continuous materials requirements planning (CMRP) approach when order type is lot for lot and safety stock is zero and its applications , 2011, Appl. Soft Comput..

[12]  Morteza Pakdaman,et al.  Analysing the solution of production-inventory optimal control systems by neural networks , 2017, RAIRO Oper. Res..

[13]  Rainer Kleber,et al.  Optimal control of production and remanufacturing in a simple recovery model with linear cost functions , 2001, OR Spectr..

[14]  Jean-Philippe Gayon,et al.  Optimal control of a production-inventory system with productreturns , 2013 .

[15]  Kash Barker,et al.  A Bayesian network model for resilience-based supplier selection , 2016 .

[16]  Pisal Yenradee,et al.  Finite capacity material requirement planning with supplier constraints , 2014 .

[17]  Marija Bogataj,et al.  Optimal lotsizing within MRP Theory , 2010, Annu. Rev. Control..

[18]  Morteza Pakdaman,et al.  A delayed optimal control model for multi-stage production-inventory system with production lead times , 2018 .

[19]  Herbert Jodlbauer,et al.  Material and capacity requirements planning with dynamic lead times , 2012 .

[20]  Lotfi Tadj,et al.  Optimal control of a hybrid periodic-review production inventory system with disposal , 2007 .

[21]  D. Naidu,et al.  Optimal Control Systems , 2018 .

[22]  R. John Milne,et al.  Optimizing planned lead times for enhancing performance of MRP systems , 2015 .

[23]  Lotfi Tadj,et al.  Model Predictive Control of a Forecasting Production System with Deteriorating Items , 2015, Int. J. Oper. Res. Inf. Syst..

[24]  Yuanguo Zhu,et al.  Bang–bang property for an uncertain saddle point problem , 2017, J. Intell. Manuf..

[25]  Sohrab Effati,et al.  Approximating the Solution of Optimal Control Problems by Fuzzy Systems , 2015, Neural Processing Letters.

[26]  Lotfi Tadj,et al.  Optimal and self-tuning optimal control of a periodic-review hybrid production inventory system ☆ , 2007 .

[27]  Lotfi Tadj,et al.  Optimal Control of Integrated Production – Forecasting System , 2012 .

[28]  Bala Ram,et al.  Material requirements planning with flexible bills-of-material , 2006 .

[29]  Manoranjan Maiti,et al.  Inventory policy of a deteriorating item with variable demand under trade credit period , 2014, Comput. Ind. Eng..

[30]  Martin Murillo,et al.  Discrete-Time Optimal Control Systems with State Constraints , 2002 .

[31]  Josefa Mula,et al.  A rolling horizon approach for material requirement planning under fuzzy lead times , 2017, Int. J. Prod. Res..

[32]  Umakanta Mishra,et al.  An EOQ Model with Time Dependent Weibull Deterioration, Quadratic Demand and Partial Backlogging , 2015, International Journal of Applied and Computational Mathematics.

[33]  Josefa Mula,et al.  An integer linear programming model to support customer-driven material planning in synchronised, multi-tier supply chains , 2014 .

[34]  Teeradej Wuttipornpun,et al.  Hybrid genetic algorithm and tabu search for finite capacity material requirement planning system in flexible flow shop with assembly operations , 2016, Comput. Ind. Eng..

[35]  Seyedmohsen Hosseini,et al.  A survey on the Imperialist Competitive Algorithm metaheuristic: Implementation in engineering domain and directions for future research , 2014, Appl. Soft Comput..

[36]  Przemyslaw Ignaciuk,et al.  Linear-quadratic optimal control strategy for periodic-review inventory systems , 2010, Autom..

[37]  Lotfi Tadj,et al.  Model predictive production planning in a three-stock reverse-logistics system with deteriorating items , 2015 .

[38]  David Twigg,et al.  Outsourcing of Product Design and Development , 2000 .

[39]  Robert W. Grubbström,et al.  The space of solution alternatives in the optimal lotsizing problem for general assembly systems applying MRP theory , 2012 .

[40]  R. Uthayakumar,et al.  Optimal Inventory Control Policy for Items with Time-Dependent Demand , 2009 .

[41]  Paul M. Swamidass,et al.  Encyclopedia of Production and Manufacturing Management , 2000 .

[42]  Lotfi Tadj,et al.  Receding horizon control of a hybrid production system with deteriorating items , 2005 .

[43]  Raul Poler Escoto,et al.  Material Requirement Planning with fuzzy constraints and fuzzy coefficients , 2007, Fuzzy Sets Syst..

[44]  Lotfi Tadj,et al.  Exact and approximate solution for optimal inventory control of two-stock with reworking and forecasting of demand , 2019, Oper. Res..

[45]  Lakdere Benkherouf,et al.  Optimal Control of Production, Remanufacturing and Refurbishing Activities in a Finite Planning Horizon Inventory System , 2016, J. Optim. Theory Appl..