Optimal control model for finite capacity continuous MRP with deteriorating items
暂无分享,去创建一个
[1] Zhigang Wu,et al. Optimal control of a continuum model for single-product re-entrant manufacturing systems , 2011 .
[2] Lotfi Tadj,et al. Adaptive control of inventory systems with unknown deterioration rate , 2012 .
[3] Teeradej Wuttipornpun,et al. Development of finite capacity material requirement planning system for assembly operations , 2004 .
[4] Rossella Pozzi,et al. Improving production planning through finite-capacity MRP , 2017, Int. J. Prod. Res..
[5] Pisal Yenradee,et al. Performance of TOC based finite capacity material requirement planning system for a multi-stage assembly factory , 2007 .
[6] Sohrab Effati,et al. Optimal control problem via neural networks , 2013, Neural Computing and Applications.
[7] A. Pooya,et al. A taxonomy of manufacturing strategies and production systems using self-organizing map , 2017 .
[8] Alexandre Dolgui,et al. Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint , 2011, Journal of Intelligent Manufacturing.
[9] Anders Segerstedt,et al. Cover-Time Planning/Takt Planning: A technique for materials requirement and production planning , 2017 .
[10] Jan Riezebos,et al. MRP Planned Orders in a Multiple‐Supplier Environment with Differing Lead Times , 2015 .
[11] Ramin Sadeghian. Continuous materials requirements planning (CMRP) approach when order type is lot for lot and safety stock is zero and its applications , 2011, Appl. Soft Comput..
[12] Morteza Pakdaman,et al. Analysing the solution of production-inventory optimal control systems by neural networks , 2017, RAIRO Oper. Res..
[13] Rainer Kleber,et al. Optimal control of production and remanufacturing in a simple recovery model with linear cost functions , 2001, OR Spectr..
[14] Jean-Philippe Gayon,et al. Optimal control of a production-inventory system with productreturns , 2013 .
[15] Kash Barker,et al. A Bayesian network model for resilience-based supplier selection , 2016 .
[16] Pisal Yenradee,et al. Finite capacity material requirement planning with supplier constraints , 2014 .
[17] Marija Bogataj,et al. Optimal lotsizing within MRP Theory , 2010, Annu. Rev. Control..
[18] Morteza Pakdaman,et al. A delayed optimal control model for multi-stage production-inventory system with production lead times , 2018 .
[19] Herbert Jodlbauer,et al. Material and capacity requirements planning with dynamic lead times , 2012 .
[20] Lotfi Tadj,et al. Optimal control of a hybrid periodic-review production inventory system with disposal , 2007 .
[21] D. Naidu,et al. Optimal Control Systems , 2018 .
[22] R. John Milne,et al. Optimizing planned lead times for enhancing performance of MRP systems , 2015 .
[23] Lotfi Tadj,et al. Model Predictive Control of a Forecasting Production System with Deteriorating Items , 2015, Int. J. Oper. Res. Inf. Syst..
[24] Yuanguo Zhu,et al. Bang–bang property for an uncertain saddle point problem , 2017, J. Intell. Manuf..
[25] Sohrab Effati,et al. Approximating the Solution of Optimal Control Problems by Fuzzy Systems , 2015, Neural Processing Letters.
[26] Lotfi Tadj,et al. Optimal and self-tuning optimal control of a periodic-review hybrid production inventory system ☆ , 2007 .
[27] Lotfi Tadj,et al. Optimal Control of Integrated Production – Forecasting System , 2012 .
[28] Bala Ram,et al. Material requirements planning with flexible bills-of-material , 2006 .
[29] Manoranjan Maiti,et al. Inventory policy of a deteriorating item with variable demand under trade credit period , 2014, Comput. Ind. Eng..
[30] Martin Murillo,et al. Discrete-Time Optimal Control Systems with State Constraints , 2002 .
[31] Josefa Mula,et al. A rolling horizon approach for material requirement planning under fuzzy lead times , 2017, Int. J. Prod. Res..
[32] Umakanta Mishra,et al. An EOQ Model with Time Dependent Weibull Deterioration, Quadratic Demand and Partial Backlogging , 2015, International Journal of Applied and Computational Mathematics.
[33] Josefa Mula,et al. An integer linear programming model to support customer-driven material planning in synchronised, multi-tier supply chains , 2014 .
[34] Teeradej Wuttipornpun,et al. Hybrid genetic algorithm and tabu search for finite capacity material requirement planning system in flexible flow shop with assembly operations , 2016, Comput. Ind. Eng..
[35] Seyedmohsen Hosseini,et al. A survey on the Imperialist Competitive Algorithm metaheuristic: Implementation in engineering domain and directions for future research , 2014, Appl. Soft Comput..
[36] Przemyslaw Ignaciuk,et al. Linear-quadratic optimal control strategy for periodic-review inventory systems , 2010, Autom..
[37] Lotfi Tadj,et al. Model predictive production planning in a three-stock reverse-logistics system with deteriorating items , 2015 .
[38] David Twigg,et al. Outsourcing of Product Design and Development , 2000 .
[39] Robert W. Grubbström,et al. The space of solution alternatives in the optimal lotsizing problem for general assembly systems applying MRP theory , 2012 .
[40] R. Uthayakumar,et al. Optimal Inventory Control Policy for Items with Time-Dependent Demand , 2009 .
[41] Paul M. Swamidass,et al. Encyclopedia of Production and Manufacturing Management , 2000 .
[42] Lotfi Tadj,et al. Receding horizon control of a hybrid production system with deteriorating items , 2005 .
[43] Raul Poler Escoto,et al. Material Requirement Planning with fuzzy constraints and fuzzy coefficients , 2007, Fuzzy Sets Syst..
[44] Lotfi Tadj,et al. Exact and approximate solution for optimal inventory control of two-stock with reworking and forecasting of demand , 2019, Oper. Res..
[45] Lakdere Benkherouf,et al. Optimal Control of Production, Remanufacturing and Refurbishing Activities in a Finite Planning Horizon Inventory System , 2016, J. Optim. Theory Appl..