The construction technique of Guangzhou Dongpu big Bridge

The paper introduces to the steel shield tube dig bore pile and steel hoist box construction loading desk technique and craft of big bridge foundation construction in the water,expatiates hang fill construction consecution steel component of inclined pull type in upper part construction,big stretch and shrink sew technique and install craft,backlogs with big bridge construction experience,solves the big acrossinghang fill construction and the big tonnage an anchor pull of technique hard.