Renovation of Chemical Processing Facility for Development of Advanced Fast Reactor Fuel Cycle System in JNC

The CPF had 4 laboratories (operation room A, laboratory A, laboratory C and analysis laboratory) in connection with reprocessing technology. The main laboratory, operation room A, has 5 hot cells. Since equipments in the main cell had been designed for small-scale verification of existing reprocessing steps, it was hardly able to respond flexibly to experimental studies on advanced technology. It was decided to remodel the cell according to the design that was newly laid out in order to ensure the function and space to conduct various basic tests. The other laboratories had no glove boxes for conducting basic experiments of important elements in the advanced reprocessing, such as actinides except U and Pu, lanthanides and so on. In order to meet various requirements of innovative technologies on advanced fuel cycle development, one laboratory is established more for study on dry reprocessing, and glove boxes, hoods and analytical equipments such as NMR, FT-IR, TI-MS are newly installed in the other laboratories in this renovation. After the renovation, hot tests in the CPF will be resumed from April 2002.Copyright © 2002 by ASME