A continuous flow simulation model for probability repetitive projects

Continuous flow is one of the main focuses of scheduling repetitive projects. Construction practitioners and researchers have proposed approaches to maintain continuous flows. However, many of thes ...

[1]  Iris D. Tommelein,et al.  Simulation of Buffering and Batching Practices in the Interface Detailing-Fabrication-Installation of HVAC Ductwork , 2004 .

[2]  Wallace J. Hopp,et al.  Factory physics : foundations of manufacturing management , 1996 .

[3]  David Arditi,et al.  Line‐of‐Balance Scheduling in Pavement Construction , 1986 .

[4]  Photios G. Ioannou,et al.  General-purpose systems for effective construction simulation , 1999 .

[5]  Photios G. Ioannou,et al.  Sequence Step Algorithm for Continuous Resource Utilization in Probabilistic Repetitive Projects , 2006, Proceedings of the 2006 Winter Simulation Conference.

[6]  Lauri Koskela,et al.  An exploration towards a production theory and its application to construction , 2000 .

[7]  Hojjat Adeli,et al.  Scheduling/Cost Optimization and Neural Dynamics Model for Construction , 1997 .

[8]  Iris D. Tommelein,et al.  PARADE GAME :I MPACT OF WORK FLOW VARIABILITY ON TRADE PERFORMANCE , 1999 .

[9]  Tarek Hegazy,et al.  COST OPTIMIZATION IN PROJECTS WITH REPETITIVE NONSERIAL ACTIVITIES , 2001 .

[10]  H. Randolph Thomas Labor Productivity and Work Sampling: The Bottom Line , 1991 .

[11]  Onur Behzat Tokdemir,et al.  CHALLENGES IN LINE-OF-BALANCE SCHEDULING , 2002 .

[12]  Keith R. Molenaar,et al.  Multiobjective design of Work-In-Process buffer for scheduling repetitive building projects , 2009 .

[13]  Gregory A. Howell,et al.  Toward construction JIT , 1997 .

[14]  Kuo-Shun Sun,et al.  Non-Unit-Based Planning and Scheduling of Repetitive Construction Projects , 2004 .

[15]  Photios G. Ioannou,et al.  Scheduling projects with repeating activities , 1998 .

[16]  Russell Kenley,et al.  Project Micro-Management: Practical Site Planning and Management of Work Flow , 2004 .

[17]  Michael A. Mullens,et al.  Automated simulator development: A strategy for modeling modular housing production , 2007 .

[18]  Mario Vanhoucke Work Continuity Constraints in Project Scheduling , 2006 .

[19]  Khaled A El-Rayes,et al.  Optimizing Resource Utilization for Repetitive Construction Projects , 2001 .

[20]  Khaled A El-Rayes,et al.  Resource-driven scheduling of repetitive activities , 1998 .

[21]  Simaan M. AbouRizk,et al.  Unified Modeling Methodology for Construction Simulation , 2002 .

[22]  I-Tung Yang,et al.  STOCHASTIC ANALYSIS ON PROJECT DURATION UNDER THE REQUIREMENT OF CONTINUOUS RESOURCE UTILIZATION , 2002 .

[23]  Kuo-Shun Sun,et al.  System development for non-unit based repetitive project scheduling , 2005 .

[24]  Ming Lu,et al.  Comparison of two simulation methodologies in modeling construction systems: Manufacturing-oriented PROMODEL vs. construction-oriented SDESA , 2007 .

[25]  Feniosky Peña-Mora,et al.  Reliability Buffering for Construction Projects , 2004 .

[26]  Olli Seppänen,et al.  A Case Study of Line-of-Balance based Schedule Planning and Control System , 2005 .

[27]  Daniel W. Halpin,et al.  CYCLONE — Method for Modeling Job Site Processes , 1977 .