Copyright 1997 Springer Heuristic Techniques for Single Line Train Scheduling

Optimising a train schedule on a single line track is known to be NP-Hard with respect to the number of conflicts in the schedule. This makes it difficult to determine optimum solutions to real life problems in reasonable time and raises the need for good heuristic techniques. The heuristics applied and compared in this paper are a local search heuristic with an improved neighbourhood structure, genetic algorithms, tabu search and two hybrid algorithms. When no time constraints are enforced on solution time, the genetic and hybrid algorithms were within five percent of the optimal solution for at least ninety percent of the test problems.

[1]  David E. Goldberg,et al.  Genetic Algorithms in Search Optimization and Machine Learning , 1988 .

[2]  Fred Glover,et al.  Tabu Search: A Tutorial , 1990 .

[3]  Patrick T. Harker,et al.  Optimal Pacing of Trains in Freight Railroads: Model Formulation and Solution , 1991, Oper. Res..

[4]  Lawrence Davis,et al.  Genetic Algorithms and Simulated Annealing , 1987 .

[5]  Éric D. Taillard,et al.  Solving real-life vehicle routing problems efficiently using tabu search , 1993, Ann. Oper. Res..

[6]  X. Cai,et al.  A fast heuristic for the train scheduling problem , 1994, Comput. Oper. Res..

[7]  Fred W. Glover,et al.  A user's guide to tabu search , 1993, Ann. Oper. Res..

[8]  Erhan Kozan,et al.  Optimal scheduling of trains on a single line track , 1996 .

[9]  Patrick T. Harker,et al.  Improving railroad on-time performance: models, algorithms and applications , 1989 .

[10]  S. M. Lim,et al.  Automated Parameter Optimization of Double Frequency Modulation Synthesis Using the Genetic Annealing Algorithm , 1996 .

[11]  Süleyman Tüfekci,et al.  A genetic algorithm for the talent scheduling problem , 1994, Comput. Oper. Res..

[12]  Lawrence. Davis,et al.  Handbook Of Genetic Algorithms , 1990 .

[13]  John A. Miller,et al.  An evaluation of local improvement operators for genetic algorithms , 1993, IEEE Trans. Syst. Man Cybern..

[14]  Mills R.G.J. DYNAMIC RESCHEDULING OF LONG-HAUL TRAINS FOR IMPROVED TIMEKEEPING AND ENERGY CONSERVATION , 1991 .

[15]  Bharatendu Srivastava,et al.  Part type selection problem in flexible manufacturing systems: tabu search algorithms , 1993, Ann. Oper. Res..