Reducing Waste to Landfill in the UK: Identifying Impediments and Critical Solutions
暂无分享,去创建一个
Lukumon O. Oyedele | Jason von Meding | Amira Elnokaly | Martin Regan | Ashraf A. Ahmed | Obas John Ebohon | Ashraf Ahmed | O. Ebohon | Amira Elnokaly | M. Regan | J. Meding | O. J. Ebohon
[1] Vivian W. Y Tam,et al. Use of Prefabrication to Minimize Construction Waste - A Case Study Approach , 2005 .
[2] Andrew N. Baldwin,et al. Designing out waste in high-rise residential buildings : analysis of precasting methods and traditional construction , 2009 .
[3] Andrew D.F. Price,et al. Architect and contractor attitudes to waste minimisation , 2006 .
[4] George Ofori,et al. CONSTRUCTION MATERIAL WASTE SOURCE EVALUATION , 2000 .
[5] Andrew R.J. Dainty,et al. Towards improved construction waste minimisation: a need for improved supply chain integration? , 2004 .
[6] T. Jick. Mixing Qualitative and Quantitative Methods: Triangulation in Action. , 1979 .
[7] Vivian W Y Tam,et al. On the effectiveness in implementing a waste-management-plan method in construction. , 2008, Waste management.
[8] Victoria Hill. Briefing: Site waste-management plans , 2008 .
[9] M Osmani,et al. Architects' perspectives on construction waste reduction by design. , 2008, Waste management.
[10] Chi Sun Poon,et al. Reducing building waste at construction sites in Hong Kong , 2004 .
[11] Adnan Enshassi,et al. Materials control and waste on building sites : Data in the study was obtained from 86 housing projects on several locations in the Gaza Strip , 1996 .
[12] Lauri Koskela,et al. Roles of supply chain management in construction , 1999 .
[13] Vivian W. Y Tam,et al. Implementation of environmental management in the Hong Kong construction industry , 2002 .
[14] J. Y. Ruwanpura,et al. Recycling as a construction waste management technique , 2010 .
[15] Mark Smithers,et al. Implementing a waste management plan during the construction phase of a project: a case study , 1998 .
[16] Leonhard E. Bernold,et al. Source evaluation of solid waste in building construction , 1994 .
[17] O. O. Faniran,et al. Minimizing waste on construction project sites , 1998 .
[18] Andrew N. Baldwin,et al. Designing to encourage waste minimisation in the construction industry , 2000 .
[19] C S Poon,et al. Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong. , 2009, Waste management.
[20] Lauri Koskela,et al. The four roles of supply chain management in construction , 2000 .
[21] Martin Loosemore,et al. A theory of waste behaviour in the construction industry , 2001 .
[22] Akintola Akintoye,et al. Just-in-Time application and implementation for building material management , 1995 .