Time-Feasible Reachability Tree for Noncyclic Scheduling of Timed Petri Nets
暂无分享,去创建一个
[1] 정치현,et al. Cyclic scheduling of timed petri nets : behavior, optimization, and application to cluster tools = 시간을 갖는 페트리넷의 주기적 스케쥴링 : 행태, 최적화, 클러스터 장비에의 응용 , 2010 .
[2] Wai Kin Chan,et al. Optimal Scheduling of Multicluster Tools With Constant Robot Moving Times, Part II: Tree-Like Topology Configurations , 2011, IEEE Transactions on Automation Science and Engineering.
[3] Shengwei Ding,et al. Multicluster tools scheduling: an integrated event graph and network model approach , 2006, IEEE Transactions on Semiconductor Manufacturing.
[4] MengChu Zhou,et al. Petri Net-Based Scheduling of Single-Arm Cluster Tools With Reentrant Atomic Layer Deposition Processes , 2011, IEEE Transactions on Automation Science and Engineering.
[5] S. Kumanan,et al. Application of Petri Nets and a Genetic Algorithm to Multi-Mode Multi-Resource Constrained Project Scheduling , 2001 .
[6] MengChu Zhou,et al. Schedulability Analysis and Optimal Scheduling of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation , 2012, IEEE Transactions on Automation Science and Engineering.
[7] Tae-Eog Lee,et al. Scheduling analysis of time-constrained dual-armed cluster tools , 2003 .
[8] Shengwei Ding,et al. Throughput Analysis of Linear Cluster Tools , 2007, 2007 IEEE International Conference on Automation Science and Engineering.
[9] Tae-Eog Lee,et al. Noncyclic Scheduling for Timed Discrete-Event Systems With Application to Single-Armed Cluster Tools Using Pareto-Optimal Optimization , 2013, IEEE Transactions on Automation Science and Engineering.
[10] P. van der Meulen. Linear Semiconductor Manufacturing Logistics and the Impact on Cycle Time , 2007, ASMC 2007.
[11] Feng Chu,et al. A Petri Net Method for Schedulability and Scheduling Problems in Single-Arm Cluster Tools With Wafer Residency Time Constraints , 2008, IEEE Transactions on Semiconductor Manufacturing.
[12] A. Kumar,et al. Use of Petri nets for resource allocation in projects , 1998 .
[13] Chihyun Jung,et al. An Efficient Mixed Integer Programming Model Based on Timed Petri Nets for Diverse Complex Cluster Tool Scheduling Problems , 2012, IEEE Transactions on Semiconductor Manufacturing.
[14] Tadao Murata,et al. Petri nets: Properties, analysis and applications , 1989, Proc. IEEE.
[15] Gang Xu,et al. Reachability Analysis of Real-Time Systems Using Time Petri Nets , 2000 .
[16] Chengbin Chu,et al. An Improved Mixed Integer Programming Approach for Multi-Hoist Cyclic Scheduling Problem , 2014, IEEE Transactions on Automation Science and Engineering.
[17] Y. Narahari,et al. Deadlock prevention and deadlock avoidance in flexible manufacturing systems using Petri net models , 1990, IEEE Trans. Robotics Autom..
[18] Chihyun Jung,et al. Cyclic Scheduling of Cluster Tools With Nonidentical Chamber Access Times Between Parallel Chambers , 2012, IEEE Transactions on Semiconductor Manufacturing.
[19] Ping-Yu Hsu,et al. A Petri Net Approach to Support Resource Assignment in Project Management , 2008, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.
[20] Dimitris Kiritsis,et al. A Petri net model for integrated process and job shop production planning , 2000, J. Intell. Manuf..
[21] Jun-Ho Lee,et al. Non-Cyclic Scheduling of a Wet Station , 2014, IEEE Transactions on Automation Science and Engineering.
[22] Feng Chu,et al. Multicyclic hoist scheduling with constant processing times , 2002, IEEE Trans. Robotics Autom..
[23] Tatsuya Suzuki,et al. FMS scheduling based on timed Petri Net model and reactive graph search , 2007 .
[24] Jun-Ho Lee,et al. Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm , 2015, IEEE Transactions on Automation Science and Engineering.
[25] MengChu Zhou,et al. Petri net scheduling of FMS using branch and bound method , 1995, Proceedings of IECON '95 - 21st Annual Conference on IEEE Industrial Electronics.
[26] Jun-Ho Lee,et al. A petri net-based modeling and scheduling with a branch and bound algorithm , 2012, 2012 IEEE International Conference on Systems, Man, and Cybernetics (SMC).
[27] MengChu Zhou,et al. A modified reachability tree approach to analysis of unbounded Petri nets , 2004, IEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics).
[28] Philippe Chrétienne,et al. Timed Petri net schedules , 1987, European Workshop on Applications and Theory of Petri Nets.
[29] René David,et al. Petri nets for modeling of dynamic systems: A survey , 1994, Autom..
[30] Li-Chen Fu,et al. A Petri net based approach to modeling and scheduling for an FMS and a case study , 1994, IEEE Trans. Ind. Electron..
[31] Leyuan Shi,et al. IEEE Transactions on Automation Science and Engineering , 2009, IEEE Transactions on Automation Science and Engineering.
[32] W.M.P. van der Aalst,et al. Petri net based scheduling , 1996 .
[33] Jiacun Wang,et al. Timed Petri Nets: Theory and Application , 1998 .
[34] Wai Kin Chan,et al. Optimal Scheduling of Multicluster Tools With Constant Robot Moving Times, Part I: Two-Cluster Analysis , 2011, IEEE Transactions on Automation Science and Engineering.
[35] W.M.P. van der Aalst,et al. Business process redesign: a Petri-net-based approach , 1996 .
[36] Jun-Ho Lee,et al. Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots , 2013, IEEE Transactions on Automation Science and Engineering.
[37] Guoqing Zhang,et al. Optimal cyclic scheduling for printed circuit board production lines with multiple hoists and general processing sequence , 2003, IEEE Trans. Robotics Autom..
[38] MengChu Zhou,et al. Petri nets and industrial applications: A tutorial , 1994, IEEE Trans. Ind. Electron..
[39] P. van der Meulen. Linear Semiconductor Manufacturing Logistics and the Impact on Cycle Time , 2007, 2007 IEEE/SEMI Advanced Semiconductor Manufacturing Conference.
[40] Mary K. Vernon,et al. A Generalized Timed Petri Net Model for Performance Analysis , 1985, IEEE Transactions on Software Engineering.
[41] Yu Wang,et al. Analysis for one-place unbounded Petri nets based on modified reachability trees , 2012, Proceedings of 2012 9th IEEE International Conference on Networking, Sensing and Control.
[42] Haoxun Chen,et al. Deadlock avoidance policy for Petri-net modeling of flexible manufacturing systems with shared resources , 1996 .
[43] Eugene Levner,et al. Multiple-part cyclic hoist scheduling using a sieve method , 1999, IEEE Trans. Robotics Autom..
[44] MengChu Zhou,et al. Modeling, analysis, simulation, scheduling, and control of semiconductor manufacturing systems: A Petri net approach , 1998 .
[45] Frank DiCesare,et al. Scheduling flexible manufacturing systems using Petri nets and heuristic search , 1994, IEEE Trans. Robotics Autom..
[46] MengChu Zhou,et al. Optimal Petri-Net-Based Polynomial-Complexity Deadlock-Avoidance Policies for Automated Manufacturing Systems , 2009, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.
[47] Jean-Marie Proth,et al. Performance evaluation of job-shop systems using timed event-graphs , 1989 .